The ModuLAr Project LoI discussion INFN-LNL 21/11/2007 Legnaro (PD)

Slides:



Advertisements
Similar presentations
Argon Purification: Lessons from Icarus and Design of a Purification System for a Very Large Detector Adam Para, Fermilab FLARE Workshop, November 3.
Advertisements

J. Strait Fermilab October 21, 2005 The Neutrino Detector of the Future: A Massive Liquid Argon TPC.
Application of Steady-State Heat Transfer
TPC Proposal for the 35 Ton Liquid Argon Test Abstract We propose to equip the 35 ton cryostat with one APA and two CPA’s, and all the necessary equipment.
LBNE 35 ton prototype Phase 1 summary Terry Tope Fermi National Accelerator Laboratory All Experimenters’ Meeting – Fermilab – May 19, 2014.
Cryogenic discussion and update 30 October 2014Neutrino platform.
LAr1-ND Conceptual Design Review of Status June 25 Craig Thorn.
LAr1-ND David Montanari Fermi National Accelerator Laboratory CERN – Feb 16, 2014.
Particle Physics Design Group Studies Big Liquid Argon Neutrino Detector Subgroup Particle Physics Design Group Studies: The BLAND Subgroup BLAND.
Homestake Lab Workshop, Lead South Dakota, February 9-11, 2006D. B. Cline, F. Raffaelli and F. Sergiampietri, LANNDD 1LANNDD A LINE OF LIQUID ARGON TPC.
MODULAr: concept design of internal detector mechanics A. Menegolli, University and INFN Pavia.
New Readout Methods for LAr detectors P. Otyugova ETH Zurich, Telichenphysik CHIPP Workshop on Neutrino physics.
Ionization. Measuring Ions A beam of charged particles will ionize gas. –Particle energy E –Chamber area A An applied field will cause ions and electrons.
Update on Various Target Issues Presented by Ron Petzoldt D. Goodin, E. Valmianski, N. Alexander, J. Hoffer Livermore HAPL meeting June 20-21, 2005.
Rate and Gain Measurements of the 1-m long GEM detector Aiwu Zhang EIC tracking R&D weekly meeting.
Observations on possible factors affecting LAr purity on the 50kton TPC from the viewpoint of the internal walls Alejandro S. Díaz Chemical Engineering.
Calor 2002, march 2002Auguste Besson1 Argon purity measurement of the D0 calorimeter Auguste Besson (ISN - Grenoble) for the D0 collaboration 10.
ZEPLIN II Status & ZEPLIN IV Muzaffer Atac David Cline Youngho Seo Franco Sergiampietri Hanguo Wang ULCA ZonEd Proportional scintillation in LIquid Noble.
4/5/2005FLARE Cryogenics, RLSchmitt1 Argon Refrigeration Supply Purity.
Detector R&D Opportunities at Fermilab: a Must or a May Do? Adam Para.
IHEP 1.3 GHz Cryomodule and Cryogenics IHEP Cryogenic group 2nd Workshop of the IHEP 1.3 GHz SRF R&D Project Dec 2 nd, 2009.
Status of the NO ν A Near Detector Prototype Timothy Kutnink Iowa State University For the NOvA Collaboration.
OPERA Experiment, Brick Finding Program A. Chukanov Joint Institute for Nuclear Research ISU, 12 th February, 2007.
LRT2004 Sudbury, December 2004Igor G. Irastorza, CEA Saclay NOSTOS: a spherical TPC to detect low energy neutrinos Igor G. Irastorza CEA/Saclay NOSTOS.
Liquid Argon Time Projection Chamber: Purity and Purity Monitoring DAVID GERSTLE – LArTPC – YALE UNIVERSITY/FNAL 31 May 2006 – FNAL Users’ Meeting Materials.
Materials Qualification for long drift Liquid Argon TPC Effect of water on electron drift lifetime Plans S. Pordes Argon Purity1Integrated R & D Plan Review.
WA104 Cryogenics Design Status David Montanari / Johan Bremer May 21, 2015 Rev. 1.
TPC R&D status in Japan T. Isobe, H. Hamagaki, K. Ozawa, and M. Inuzuka Center for Nuclear Study, University of Tokyo Contents 1.Development of a prototype.
TPC Design Concept: From MicroBooNE to LAr20
Poster Design & Printing by Genigraphics ® Neutrino Interactions Studying the properties of neutrinos will shed light on the origin of the.
F August S. Pordes - Fermilab1 Liquid Argon for Direct Detection of Dark Matter Work and Plans at Fermilab.
Discussion: développement du système de lecture des photomultiplicateurs pour le prototype de détecteur Argon liquide de LBNO 21/11/2013 Réunion: APC,
1 Satoshi Mihara for the   e  collaboration, review meeting at PSI, Jul 2002 Photon Detector Satoshi Mihara ICEPP, Univ. of Tokyo 1.Large Prototype.
1 Liquid Argon Dark Matter: Synergies with R&D for Neutrino Detectors: Chemically clean Argon for drifting electrons and light output (Oxygen and H20 relevant.
Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) Dec.
S. Pordes - FNAL May 13th Purity Monitor - Description and Experience at Fermilab Production of Clean Argon - Description of Filtering System and.
David Finley, Fermilab / October 3, 2005 on LArTPC Slide 1 LArTPC: Large Liquid Argon TPC for the NuMI Off-axis Beam First Point: Try to recognize intellectually,
3D Event reconstruction in ArgoNeuT Maddalena Antonello and Ornella Palamara 11 gennaio 20161M.Antonello - INFN, LNGS.
Update on Micro Channel Cooling Collaboration Meeting , G. Nüßle.
Neutrino Cryogenics Requirements Meeting 25/09/2014 Day 1 review.
Quality control for large volume production GEM detectors Christopher Armaingaud On behalf of the collaboration GEMs for CMS.
Preliminary results on Copper filters, with FLIC test chamber F. Pietropaolo, A. Zani, M. Meli CENF General Meeting – 22/10/2015.
Beam Test of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger, A.
T2K Status Report. The Accelerator Complex a Beamline Performance 3 First T2K run completed January to June x protons accumulated.
Progress Report on GEANT Study of Containerized Detectors R. Ray 7/11/03 What’s New Since Last Time?  More detailed container description in GEANT o Slightly.
Concept Design for LBNF Far detector (LAr single phase)
Installation of the T600 at Fermilab CSN2, September 22,
1/26/2009 S. Pordes LAr R & D Briefing 1 Liquid Argon presents prospect of continuously live Imaging Calorimeter C. Rubbia.
Cryogenics Fabrication Plans & Constraints David Montanari (on behalf of the CERN Neutrino Cryogenic Group) ProtoDUNEs Meeting Feb 23, 2016.
Increase of the T600 maximum drift distance and preliminary considerations for larger aluminum vessels Claudio Montanari INFN-Pavia, Italy 1ICARUS Meeting.
Long-Baseline Neutrino Facility LBNF Cryostats Systems Requirements on FSCF Marzio Nessi LBNF/DUNE DOE/SC CD-3a Director’s Review October 27-29, 2015.
Aachen Status Report: CO 2 Cooling for the CMS Tracker at SLHC Lutz Feld, Waclaw Karpinski, Jennifer Merz and Michael Wlochal RWTH Aachen University, 1.
David Finley / PPD Engineering Meeting / June 24, Fermilab Slide 1 R&D Toward Large Liquid Argon Time Projection Chambers “Large” means up to 100.
Second run with the Copper filter WA104 technical meeting – 23/03/2016.
Cryogenic Test Stand Facilities at PAB: Stephen Pordes Neutrino R&D Workshop January 20 –
Study of the cryogenic THGEM-GPM for the readout of scintillation light from liquid argon Xie Wenqing( 谢文庆 ), Fu Yidong( 付逸冬 ), Li Yulan( 李玉兰 ) Department.
Installation of the T600 at Fermilab Fermilab, February 15,
Installation of the T600 at Fermilab
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
Albert Einstein Center for Fundamental Physics
Proximity Cryogenics P&IDs Meeting
Proximity Cryogenics P&IDs meeting
Micro-channel Cooling
First tests on the roll-formed field cage.
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
Aachen Status Report: CO2 Cooling for the CMS Tracker
CRYOGENICS OPERATIONS 2008 Organized by CERN
Toward the final design of a TPC for the ILD detector
Recirculating CO2 System
Aachen Status Report: CO2 Cooling for the CMS Tracker
Presentation transcript:

The ModuLAr Project LoI discussion INFN-LNL 21/11/2007 Legnaro (PD)

The MODULAr project The ModuLAr Project pursues a substantial upgrade of a LAr detector for CNGS neutrino beam, having in mind competition and timetable comparable to the ones of NO A at Fermilab for the measurements of θ 13 mixing the mass hierarchy

Why LAr TPC Typical energy spectrum of Neutrinos (Fnal)

e appearance: Background Sources   e contamination in  beam (typically 10%)  Neutral Current interactions of e, misidentified as CC e interaction  + N  +  0 X A rejection of over 99% must be achieved

From ICARUS to MOduLAr The ICARUS T600 experience demonstrates the Lar technology is workable Therefore it represents the right choice for the forthcoming Long Baseline Neutrino Program

Cross Section of one ModuLAr unit

The MODULAr choice Serious arguments suggest the use of a MODULar structure of several identical vessels, each one of the size of a few thousands ton: Overcoming events due to poisoning of the liquid Safety requirements Production of large fluctuations in charge collection over very large volumes due to variations in LAr purity Limited electron drift lengths allow to apply well- established read-out technique

From ICARUS to MODULAr The MODULAr detector will borrow many components from ICARUS: Wire plane configuration Readout electronics and the data acquisition Signal feed-troughs Original technology to withstand temperature changes during detector filling High voltage feed-through and the appropriate noise filtering HYDROSORB/OXYSORB as filters for Ar purification in gas and liquid phases PMT’s to provide a trigger and a t=0 signal High precision purity monitors

The use of perlite insulation Thermal conductivity varies with temperature, density, pressure, and conductivity of the gas which fills the insulation spaces Typical thermal conductivity interval: W m -1 K -1 Estimated specific heat loss: about 3.86 W/m 2 (with nominal thermal conductivity of W m -1 K -1, thickness of 1.5 m)

SLICE

SLICE: a prototype for MODULAr The SLICE cross section is identical to a ModuLAr unit: Sensitive area of 8 x 8 m 2 Pair of three readout planes, one at each side of the gap Central HV plane Maximum drift distance of 4 m Sensitive volume: about 264 m 3 LAr mass: 360 ton (roughly as the T300 detector)

Schematics of the SLICE detector

Slice as a test bed for ModuLAr With SLICE we will gain experience:  Designing, constructing and installing wire chambers, feedthroughs, PMT’s etc  Mantaining and achieving purity in a large vessel  Implementing cold electronics

The construction of SLICE will allow to reach the following targets : a) technical goals Develop all the necessary R&D Establish successful technology transfer b) scientific policy Establish physics collaboration at international level c) physics development Record complete neutrino interactions ( e and  ) Develop event reconstruction and identification Develop physics analysis TARGETS

Main R&D studies for SLICE construction Use of Perlite insulation Initial filling Lar purification New read-out design (due to the 4 m long drift) 200 kV HV will require some not-demanding R&D tests PMT’s optimization in terms of size, wave-shifter deposition and quantum efficency A site for SLICE: –Construction –Operation

Electron lifetime

Thermal insulation SLICE is thermally insulated with Perlite walls: The bottom wall is realized with low conductivity bricks, also about m thick SLICE cold surface: about 350 m 2  total loss: 1.35 kWatt Wall thickness1-1.5 m Total Perlite volume550 m 3 Total Perlite mass expanded density of 60 kg/m 3 33 t

Initial filling Method: repeated flushing of the ultra-pure gas Reasonable goal: surviving gaseous volumetric concentration of Oxygen equivalent of the order of (1 ppm) The volume is cooled down and filled with ultra-pure LAr Relative concentration of O 2 reduced by the obvious factor 1/800, i.e /800 = 1.25 × ≈1.25 ppb Electron lifetime 350 µs Further purification with Oxisorb Final electron lifetime of about 10 ms achieveble (?), corresponding to a 30 ppt Oxygen equivalent (20% attenuation for 4 m drift distance)

The LAr purification Purifiers: set of filters placed outside the perlite vessel and connected with the help of appropriate pumps to the inner LAr volume LAr flow must proceed orderly and uniformly to avoid possible “pockets” of limited circulation To avoid this effect, a bottom containment plate with many small holes uniformly distributed over the whole surface, is under study

Open questions (1) : Vessel  Material (Al or Stainless Steel)  Wall thickness vs safety factors and stiffness  Has the vessel to be opened ? What about perlite?  Is a storage dewar needed?

Open questions (2)  How to obtain constant and stable temperature inside the vessel.  Will the bottom face need superinsulation layers?  Which swimming pool for SLICE?  Are HV feedthroughs a challenge? (200kV or more)

Institutions Bologna LNF LNGS Milano Napoli Padova Pavia Pisa

1 – Main outer dewar with Perlite insulation – Wire planes and other electron signal collecting structures – HV supply to about 200 kV, including race track structures – Light collecting photomultipliers – Initial purification studies without vacuum 60 6 – Readout electronics (6 mm pitch) – Final installation in the test site (CERN) – Contingency and miscellanea 1090 IVA (at 20%) 1308 Total (kEURO) 7848 Cost Estimate

The CERN/GranSasso (CNGS) neutrino complex represents an unique opportunity for neutrinos studies in Europe, concurrent time-wise with T2K and NOvA. The ModuLAr Project

SLICE Structure

Electron Attenuation

Schematics of the SLICE detector