West Sacramento Area Flood Control Agency November 10, 2011 Update on Current Levee Construction Projects and on the Southport Sacramento River Levee Early.

Slides:



Advertisements
Similar presentations
US Army Corps of Engineers BUILDING STRONG and Taking Care of People! Ecosystem Restoration Along the Los Angeles River: Creativity within Concrete Dan.
Advertisements

Regulatory Context Natural Environment Chapter Tukwila Comprehensive Plan.
Public Information Meeting #6 City of Fargo Flood Risk Reduction Projects Rose Creek Coulee October 9, 2012.
Identifying and Evaluating Levee Improvement Alternatives – The City of West Sacramento Michael J. Vecchio, P.E. Watershed Planning and Design Sacramento,
Sacramento District Regional Vegetation Variance Paige Caldwell, P.E. Emergency Manager.
US Army Corps of Engineers BUILDING STRONG ® FOLSOM DAM MODIFICATIONS APPROACH CHANNEL EIS/EIR Major Robert Dion and Cameron Sessions Project Managers.
TRLIA Certification of Environmental Impact Report and Selection of Project for Feather River TRLIA Board Meeting: February 6, 2007 Briefer: Paul Brunner,
SUTTER BUTTE FLOOD CONTROL AGENCY Supplemental Presentation on Variances and Encroachments Feather River West Levee Project Project Area C May 24, 2013.
Breaching the Mahar Regional School Dam Presentation to Ralph C. Mahar Regional School Committee GZA GeoEnvironmental, Inc. February 9, 2011.
California’s Central Valley Flood System Improvement Framework California Levees Roundtable March 27, 2009 California Levees Roundtable March 27, 2009.
LOUISIANA FLOOD PROTECTION DESIGN GUIDELINES Date: April 16, 2014.
WETLANDS and ODOT Environmental Services Oregon Department of Transportation.
US Army Corps of Engineers PLANNING SMART BUILDING STRONG ® Project Planning with the U.S. Army Corps of Engineers (USACE) Presenter Name Presenter Title.
Central Valley Flood Protection Board Meeting – Agenda Item No. 10A APPLICATION NOS and
Acquisition of Flood Control Easements Triangle High-Ground Area City of West Sacramento, Yolo Co. Meeting of the Central Valley Flood Protection Board.
Briefing to the Central Valley Flood Protection Board on Status of the FCSA July 12, 2013 Central Valley Integrated Flood Management Study.
In-Delta Storage Process OverviewProcess Overview Program BenefitsProgram Benefits Project CostsProject Costs IssuesIssues Proposed Work Plan for FY 2003Proposed.
ASFPM – May 24, 2012 CASE STUDY – 408 PERMITTING AND LEVEE ACCREDITATION FOR WATERLOO, NEBRASKA ASFPM MAY 24, 2012 Presented by Randy Behm, PE, CFM Lalit.
California Geotechnical Levee Evaluation Program SAME/ASCE Midwest Levee Conference, June Mike Inamine California Department of Water Resources.
1 Delta Levees Investment Strategy Delta Stewardship Council Central Valley Flood Protection Board Levees Workshop July 10, 2015.
Proposed Benefit Assessment District Overview Three Rivers Levee Improvement Authority (TRLIA) TRLIA.ORG March 10,
Atlanta Public Schools Project Management Framework Proposed to the Atlanta Board of Education to Complete AdvancED/SACS “Required Actions” January 24,
From Planning to Pouring: The Evolution of Safe Routes to School Julie Walcoff, Ohio DOT, Columbus, OH Alex Smith, Columbus Public Health, Columbus, OH.
Module 11 STEPS 4 & 5 Conduct Reconnaissance Study & Report Certification Civil Works Orientation Course - FY 11.
Bay Area Integrated Regional Water Management Plan North Bay Watershed Association Meeting November 3, 2006 Working together to enhance sustainable water.
1 Tower Road Project Update. 2 The Project Team requests the Alachua County Commission: Authorize staff to: Proceed with re-evaluating four (4) key issues.
Planning and Community Development Department Housing Element City Council February 03, 2014.
Workshop 2 – Administrative Structure Recycled Water Feasibility Study Rancho Murieta Community Services District January 8, 2008.
1 The Use of Institutional Controls Under the RCRA Corrective Action Program.
Rulemaking for Central Florida Coordination Area Coordinated Rulemaking by the South Florida, St. Johns River and Southwest Florida Water Management Districts.
Bijou Erosion Control Project Project Kickoff TAC Meeting May 4, 2007 City of South Lake Tahoe ENTRIX, Inc. California Tahoe Conservancy.
1 Three Rivers Levee Improvement Authority Follow-up on Twelve Compliance Issues Raised on February 26, 2007 March 22, 2007.
Three Rivers Levee Improvement Authority June 8, 2007 Presentation to the State Reclamation Board Proposed Feather River Setback Levee.
Solano Habitat Conservation Plan 580,000 Acres 36 Covered Species; 4 Natural Communities 17,500 acres of Urban Development; 1,280 acres of other New Facilities.
Central Valley Flood Protection Board Meeting – Agenda Item No. 6B APPLICATION NO
Delta Plan Draft Program EIR Status and Summary of Approach October 27, 2011 Not Reviewed/Approved by Delta Stewardship Council1October 27, 2011.
September 23, 2010 Overview of DWR’s Flood Management Activities Related to the Delta A Briefing to the Delta Stewardship Council 1.
Presented to: Central Valley Flood Protection Board August 23, 2013 Sacramento Area Levee Accreditation Key Results from Encroachment Analysis.
Central Valley Flood Protection Board Meeting – Agenda Item No. 9A CVFPB MEETING – October 25, 2013.
1 Atchafalaya River and Bayous Chene, Boeuf, and Black, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting April 13, 2005 Project Manager.
US Army Corps of Engineers BUILDING STRONG ® Emergency Response Policy Revision Update ( ER & EP ) Jeffrey Jensen CECW-HS USACE Flood Risk Management.
Three Rivers Levee Improvement Authority February 26, 2007 Presentation to the State Reclamation Board Subcommittee Proposed Feather River Setback Levee.
2 West Sacramento, California Project General Reevaluation Report Letter of Support for the West Sacramento General Reevaluation Report Agenda Item 4G:
Central Valley Flood Protection Board October 25, 2013 Presented by: Michael Mierzwa, P.E. Chief of the FloodSAFE Program Management Office California.
US Army Corps of Engineers Sacramento DistrictIntroductionIntroduction Sacramento River Bank Protection Project: Phase II Supplemental Authorization –
2 American River Common Features General Re-evaluation Report Request for Board Approval of Letter Requesting Consideration of Locally Preferred Plan (LPP)
CVFPB Executive Committee Meeting – Agenda Item No. 8A Central Valley Flood Protection Board.
Central Valley Flood Protection Board Meeting – Agenda Item No. 7C.
Corps of Engineers BUILDING STRONG ® Interim Operating Pools Jerry W. Webb, P.E., D.WRE Principal Hydrologic & Hydraulic Engineer Hydrology, Hydraulics.
CVFPB Executive Committee Meeting – Agenda Item No. 4C Central Valley Flood Protection Board.
APPLICATION NO LEVEE DISTRICT No. 1 Of SUTTER COUNTY STAR BEND SETBACK LEVEE SUTTER COUNTY April 17, 2009.
Update to Proposition 1E – Early Implementation Project (EIP) Application and Local Share Reclamation Board Sub-Committee Meeting September 11, 2007.
1 Calcasieu River & Pass, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting February 2, 2005 Project Manager Mireya Laigast, Civil Engineer,
Planning Commission Study Session: Preferred Plan July 23, 2015.
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
 What is EWP & How Does the Program Work? Emergency Watershed Protection Program.
Yolo Bypass Salmonid Habitat Restoration & Fish Passage Environmental Impact Statement Environmental Impact Report Information Presentation to YBFEPT July.
US Army Corps of Engineers BUILDING STRONG ® Miles City, Montana Section 205 Gwyn M. Jarrett - Project Manager Omaha District April 27, 2016.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
1 Staff Public Workshops Fall 2011 Policy for Siting, Design, Operation and Management of Onsite Wastewater Treatment Systems San Luis Obispo: October.
Planning & Community Development Department General Plan Implementation Strategy City Council February 29, 2016.
City of Stockton Levee Flood Protection Status Report January 29, 2008 Agenda Item 4.03.
May 14, Planning Commission Planning Commission May 14, 2015.
STOCKTON DELTA WATER SUPPLY PROJECT (DWSP) Final Environmental Impact Report (EIR) Certification Hearing November 8, 2005 Mark J. Madison, Director Municipal.
Chromium 6 Regulation Corrective Action Plan October 6, 2015
Feather River West Levee Project Project Area C May 24, 2013
Presented By: Fran Borcalli, P.E. Program Manager
Planning Commission Hearing
Pre-Proposal Conference March 27, 2019, 1:00 p.m.
Sacramento Environmental Commission January 2019.
Presentation transcript:

West Sacramento Area Flood Control Agency November 10, 2011 Update on Current Levee Construction Projects and on the Southport Sacramento River Levee Early Implementation Project

Program History and Milestones Problem Identification Report completed for entire perimeter levee system (2008) Alternatives Analysis Report completed for entire perimeter levee system (2009) Construction of I-Street EIP (2008) Construction of CHP Academy and Rivers EIP’s (2011) Initiation of Southport EIP Project (2010)

Program History and Milestones (cont) USACE Construction of Yolo Bypass Slip Repairs (2009, 2011, new south slip) USACE Sacramento Bank Protection Project Setback Levee Improvement Project (2011/12) USACE General Reevaluation Report initiated in 2009, estimated completion (2015)

Goals for Southport EIP Summary of Project Goals and Criteria –Protect safety and public health of residents within the City while minimizing impacts to community as much as possible –Selected Southport EIP project based on repairing highest risk sites –Select least cost alternative that achieves public safety goals and complies w/Federal and State regulations

Federal and State Levee Design Criteria Engineering design standards established by U.S. Army Corps of Engineers, Central Valley Flood Protection Board, and CA Department of Water Resources and include: –Freeboard –Erosion –Geotechnical Stability –Under-seepage –Vegetation –Geometry

State Cost-Share Formulas State cost share ranges from 50% to 90% Base state cost share is 50% Objectives that increase state cost share: –Habitat, open-space and/or recreation from 5% to 20% –State facilities from 5% to 20% –Setback levee from 20% to 40% –Disadvantaged area up to 40% *State cost share is limited at 70% except for disadvantaged areas and setback levees which can achieve up to a 90% state cost share.

WSAFCA Role in EIPs Select Early Implementation Projects that utilize available funds to improve the highest risk reaches of levee in advance of USACE construction Provide local share of funds necessary for design and construction of projects to meet the 200-year level of protection mandated by the State Plan of Flood Control Design projects that provide the maximum reduction in flood risk for the local funds invested, while considering project impacts on the community and local landowners Provide a forum for public information and engagement in the decision-making process

An “Inside Look” at a Levee

Typical Levee Deficiencies

Key Factors Limiting Use of In-Place Measures Local conditions like soil layer thickness, type and depth can determine whether cutoff walls or relief wells will correct a seepage deficiency. Cutoff wall depth depends on soil type over depth of wall and soil type at the bottom of the wall. Large particles - like gravels, cobbles and boulders - can limit the cutoff wall depth due to alignment and mixing problems. Sacramento District Corps of Engineers recently shut down a deep cutoff wall project for these reasons.

Relief Well with Confining Layer

Relief Well without Confining Layer

What Factors Can Require a Landward Shift of the Levee Template? Steep waterside slope with evidence of erosion or potential for erosion Rapid drawdown instability Vegetation encroaching into Corps ‘vegetation free’ zone

Steep Slope with Erosion

Shifted Template

Rapid Drawdown Failure Plane Intruding into Levee Template

Template Shifted Outside of Failure Plane

Task Order No. 3 Scope and Status Scope items include: Hydrologic and hydraulic analysis, geotechnical and groundwater investigations, civil engineering analysis, environmental documentation, and geomorphic investigations Develop 15% design for two project alternatives with cost opinions Complete Administrative Draft Environmental Impact Statement/Environmental Impact Report WSAFCA staff and consultant team present Task Order No.3 analysis at December board meeting.

Projected Milestone Overview December 2011: Presentation of Task Order No. 3 Analysis January 2012: –Presentation of 15% design with cost opinions and consideration of approval of Task Order No. 4 –Public Workshop on preferred alternative (January 26) February 2012: WSAFCA Board selects preferred alternative and provides direction on 60% design April 2012: –60% design complete –Appraisal process initiated

Projected Milestone Overview (cont) January 2013: Certify EIR – 100% design completed March-August 2013: Federal and state regulatory approvals received September 2013: WSAFCA Board consideration of approval of construction contract

Public Outreach Opportunities Monthly JPA Meetings (2 nd Thursday of every month at 10:30 a.m.) Public Meeting: January 26, 2012 (evening time TBD) One-on-one meetings w/WSAFCA staff on request

Questions?