Baby MIND, Large Area Trigger Counters E. Noah WA105 General Meeting 21 January 2015.

Slides:



Advertisements
Similar presentations
Bulk Micromegas Our Micromegas detectors are fabricated using the Bulk technology The fabrication consists in the lamination of a steel woven mesh and.
Advertisements

CMS Outer Hadron Calorimeter (HO) Project Naba K Mondal Tata Institute, Mumbai, India.
W. Clarida, HCAL Meeting, Fermilab Oct. 06 Quartz Plate Calorimeter Prototype Geant4 Simulation Progress W. Clarida The University of Iowa.
The Design of MINER  A Howard Budd University of Rochester August, 2004.
The Tagger Microscope Richard Jones, University of Connecticut Hall D Tagger - Photon Beamline ReviewJan , 2005, Newport News presented by GlueX.
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
Readout scheme for the Baby-MIND detector
Naba K Mondal, TIFR, Mumbai ICAL ( conceptual) INO Peak at Bodi West Hills Prototype ICAL at VECC 2mX2m RPC Test Stand at TIFR ASIC for RPC designed at.
Mathias Reinecke CALICE meeting Argonne EUDET module – Electronics Integration Contents -Next prototype : architecture -HCAL Base Unit (HBU)
Shashlik type calorimeter for SHIP experiment
Baby MIND Magnet 10 th June Meeting E.N.. Meeting goals 10 th June meeting goals: – Magnet design endorsement – Choice of coil option – Steel procurement.
Construct two layers of hadron calorimeter and test Makoto Harada High Energy Physics Laboratory Faculty of Physics Department of Science Shinshu University.
MR (7/7/05) T2K electronics Beam structure ~ 8 (9?) bunches / spill bunch width ~ 60 nsec bunch separation ~ 600 nsec spill duration ~ 5  sec Time between.
AHCAL Electronics. Status Commissioning and Integration Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 12th, 2010.
CM26 March 2010Slide 1 EMR Status o Intro o Construction o Magnetic shielding o Electronics o Prototype Cosmics test o Schedule Jean-Sebastien Graulich,
Status report on MURAY telescope R&D
The Design and Performance of the MINER A Detector Howard Budd, University of Rochester Technology and Instrumentation in Particle Physics 2011.
March 12, 2006R. Abrams LCWS06 Bangalore1 ILC Prototype Muon Scintillation Counter Tests Robert Abrams Indiana University.
Detector R&D for Muon Chamber Anand K. Dubey For VECC group.
Fiber Tracker Update Edward McKigney Imperial College July 3 rd, 2002.
Activities relevant to Neutrinos in the UK Alfons Weber Oxford/RAL Durham, 11-Mar-2011.
Start Counter Collaboration Meeting September 2004 W. Boeglin FIU.
Catherine Adloff16 June 2009 CALICE Technical Board 1 DHCAL-MICROMEGAS Yannis KARYOTAKIS For the LAPP group.
The AFTER electronics from a user’s point of view D. Attié, P. Colas Mamma meeting,CERN Feb T2K electronics.
The ZEUS Hadron-Electron-Separator Performance and Experience Peter Göttlicher (DESY) for the ZEUS-HES-group Contributions to HES Germany, Israel, Japan,
Malte Hildebrandt, PSIMEG - Review Meeting / 1   e  Drift Chambers Charge Division Test Chamber Testsetup for Cosmics Chamber Construction.
O R&D programme to test detector concepts being developed for neutrino factory: wrong sign muon “Golden” signature R&D Programme MIND & TASD 15 m 100 m.
Hadron Calorimeter HCAL-J GEp Electron Calorimeter BigCal Hadron Calorimeter 1 G. Franklin, Carnegie Mellon University 10/13/2011.
IoP HEPP Lancaster 31/03 – 02/04/08 Gavin Davies Dr. Athanasios Hatzikoutelis Dr. Laura Kormos Lancaster University T2K UK Collaboration  DS-Ecal Design.
Apollo Go, NCU Taiwan BES III Luminosity Monitor Apollo Go National Central University, Taiwan September 16, 2002.
Baby-Mind SiPM Front End Electronics
Towards a 1m 3 Glass RPC HCAL prototype with multi-threshold readout M. Vander Donckt for the CALICE - SDHCAL group.
ERC - Elementary Readout Cell Miguel Ferreira 18 th April 2012
EUROnu WP5 Detector Costing EuroNu Annual General Meeting, Strasbourg 3 June 2010 Paul Soler.
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
Multipixel Geiger mode photo-sensors (MRS APD’s) Yury Kudenko ISS meeting, KEK, 25 January 2006 INR, Moscow.
SiPM for CBM Michael Danilov ITEP(Moscow) Muon Detector and/or Preshower CBM Meeting ITEP
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
Readout Architecture for MuCh Introduction of MuCh Layout of Much ( proposed several schemes) Read ASIC’s Key features Basic Readout chain ROC Block Diagram.
The DAMPE STK G. Ambrosi INFN Perugia. The DAMPE Detector Mass: 1480 Kg Power: 600 W Data: 16 Gbyte/day Liftime: 5 years 2.
SiD Muon Detector Progress. Overall concept 2 There are slots in the iron. We will insert modules of orthogonal strips of appropriate size into the slots.
10/20/2015 TASD and MIND prototype and tests at CERN SPSC Oct Tests of TASD and MIND prototypes at CERN.
SDHCAL. outline  SDHCAL concept, validation and construction  Test Beam and technological prototype performance  Perspectives and Conclusion  SDHCAL.
Super-IFR Detector R&D summary Wander Baldini Ferrara, Padova, Roma1 INFN and University on behalf of the superB-IFR group: Ferrara, Padova, Roma1 INFN.
Baby MIND Status 28 April 2015 – Third Hyper-K EU meeting E. NOAH A. Blondel, F. Cadoux, M. Capeans, N. Chikuma, H. Da Silva, A. Dudarev, Y. Favre, P-A.
Baby MIND Scintillator modules 11 November 2015 Revision E. Noah.
Status Report of Tile Calorimeter at Korea Calorimeter meeting 2005/6/13 Youngdo Oh Kyungpook National University.
Baby MIND Module Cabling Options 27 th January 2016 F. Cadoux, Y. Favre, L. Nicola, E. Noah.
Magnetized Iron Neutrino Detector MIND Technology & Engineering.
Future Beam Test Plans of the Calorimeter Group Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
IFR Detector R&D status
Roberto Calabrese Ferrara University and INFN
Baby-MIND Modules & Services
Alan Bross 6th Plenary Meeting of the IDS-NF
EURONu Collaboration Board,
Baby-Mind SiPM Front End Electronics
Felix Sefkow DESY LDC at Vienna November 17, 2005
CEPC 数字强子量能器读出电子学预研进展
Status of HBU, EBU and SM_HBU
IFR Status Summary W. Baldini on behalf of the IFR Group
A Magnetized Muon Range Detector for TITUS
Baby-Mind SiPM Front End Electronics
IHEP group Shashlyk activity towards TDR
Baby MIND Status on T9 E. Noah 6th July 2017.
E. Noah, A. Blondel, Y. Favre, R. Tsenov 29 July 2015
IFR detector mechanics
ILC Detector Activities in Korea
Chris Smith California Institute of Technology EPS Conference 2003
Status of the EUDET Prototype
General Introduction to IFR
Presentation transcript:

Baby MIND, Large Area Trigger Counters E. Noah WA105 General Meeting 21 January 2015

MIND Fe B = 1.5 T (in the Fe) μ–μ– μ–μ– θ 30 cm10 cm 6-9 cm2-3 cm 10 cm 6-9 cm  steel=100 cm 30 cm μ–μ– Vertex detector neutrino beam MIND Detector modules 30 cm 10 cm Side MIND Downstream MIND μ–μ– 2

Fe Magnetization: Typical Approach 3

tur ns v Option 2) 2 large coils – one upper, one lower coil each coil wound around half the height of the iron plate assembly, Pros: field lines are “in principle” very uniform over a wide surface area, Cons: coil assembly is large and difficult to manipulate. Integration of detector modules is challenging. Option 1): Baseline Each “half-plate” has its own coil Pros: Straightforward assembly of detector planes, Cons: Need technical solution to wind coils. Baseline option enables magnetization of any number of steel plates! Baby MIND magnet coil layout 4

Modular approach s1s2s3s4s5s6-9s10-13s14-17s18-21 m1m2m3m4m5m6m7m8m9m10 s22-25 m11 s26-29 m12 s30 m13 s31 m14 s32 m15m m Example configuration: 8 iron planes are magnetised, 16 detector modules required 5

B-field Material: Armco  B ~ 1.5 T  (H = 700 A.turns/m) Simulation:  I*N = 2500 A.turns  L sol = 2 m  H eff = 1250 A.turns/m 6

Extruded scintillator slabs produced at Uniplast company, Vladimir, Russia: polystyrene-based, 1.5 % paraterphenyl (PTP) and 0.01 % POPOP; Slabs are etched with a chemical agent (Uniplast) to create a  m layer that acts as a diffusive reflector; Various sizes are possible. Acceptable light yield up to 16 m (double-ended readout). Large area counters (Y. Kudenko: INR) 7 7 mm thick, 3 cm width

Tested/compared: – Different slab sizes – Silicon photomultipliers – Wavelength shifting fibers – Optical glues Custom optical connector. Prototype modules: – 9000 bars – 50 modules Prototype scintillator modules 8

Carbon fiber envelope Aluminium electronics tray Aluminium frame Electronics Scintillator bars Prototype module mechanics 9

10 Prototype electronics  FEB characteristics : 96 SiPM channels (mini coax. connectors), 84 used for AIDA 3 CITIROC ASICs (32 ch charge ampl., trigs, ext. common HV + independent 0/4V) 12-bits 8-ch ADC 40Ms/s/ch 2 x 6Gb/s transceiver (800Mb/s for AIDA) USB3.0 (5Gb/s) µC for lab, calib. & maintenance LV & HV power supplies Altera ARIA 5 FPGA (mid-range), firmware : 84 ch. Timing meas (2/2.5ns resolution) Charge meas. (from 12-bits ADC) Baseline computation (filtering) USB3.0 gateway Gigabit protocol for readout (exp.) PCB (production launch in few days) : 8 layers 120µm space/width lines Impedance & length control (TDC) Trials with EASIROC/CITIROC eval. board

WA105 MIND: – Integration into LAr simulation software environment – Cost estimate Counters for 6x6x6m 3 LAr: – Conceptual design to define coverage, timing requirements, study mechanical integration... Prototyping with 3x1x1m 3 LAr: – To be studied, whether prototype modules under construction can be installed above 3x1x1m MIND/Counters Outlook for WA105 LAr 6x6x6m 3 Beam Trigger counters cosmic  horizontal beamline background      Beamline background MIND  p & charge ID hadronic showers tail catching (escaping neutral hadrons)  Cosmics