© 2008 Prentice Hall, Inc.14 – 1 Operations Management Chapter 14 – Material Requirements Planning (MRP) and ERP PowerPoint presentation to accompany Heizer/Render.

Slides:



Advertisements
Similar presentations
Operations Management
Advertisements

To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Resource Planning Chapter 14.
Omercan Barut Dokuz Eylul University Industrial Engineering.
14 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall 14 Material Requirements Planning (MRP) and ERP.
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.
MRP and Dependent Inventory Models. Inventory Process stage Demand Type Number & Value Other Raw Material WIP Finished Goods Independent Dependent A Items.
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.
Operations Management
4. Production and Material Planning
Material Requirements Planning (MRP)
© The McGraw-Hill Companies, Inc., Chapter 15 Materials Requirements Planning.
POM - J. Galván 1 PRODUCTION AND OPERATIONS MANAGEMENT Ch. 15: Material Requirements Planning (MRP)
MRP, MRP II, and ERP.
Material Requirements Planning
14 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall 14 Material Requirements Planning (MRP) and ERP.
© 2004 by Prentice Hall, Inc. Upper Saddle River, N.J Operations Management Material Requirements Planning (MRP) & ERP Chapter 14.
MATERIAL REQUIREMENTS PLANNING (MRP) AND ERP Chapter 14 1.
W8 8.3 Aggregate Planning, Material Requirement Planning, and Capacity Planning Operations Management © Ana G. Méndez University System, All rights.
14 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall 14 Material Requirements Planning (MRP) and ERP PowerPoint presentation to accompany Heizer.
Aggregate Planning and Resource Planning Chapters 13 and 14.
Resource Planning Chapter 14. MGMT 326 Foundations of Operations Introduction Strategy Managing Projects Quality Assurance Facilities & Work Design Products.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 14 MRP and ERP.
Material Requirements Planning (MRP) and ERP
Week #14-2 Operations Management Material Requirements Planning (MRP) & ERP Chapter 14.
PowerPoint presentation to accompany Operations Management, 6E (Heizer & Render) © 2001 by Prentice Hall, Inc. Upper Saddle River, N.J Material.
Operations Management Material Requirements Planning
Material Requirements Planning (MRP)
© 2008 Prentice Hall, Inc.14 – 1 Operations Management Chapter 14 – Material Requirements Planning (MRP) and ERP PowerPoint presentation to accompany Heizer/Render.
LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 22 1.
14 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall 14 Material Requirements Planning (MRP) and ERP.
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved. Chapter.
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.
Chapter 15 MRP and ERP.
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.
1 Operations Management MRP Lecture 22 (Chapter 14)
14 - 1© 2014 Pearson Education Material Requirements Planning (MRP) and ERP PowerPoint presentation to accompany Heizer and Render Operations Management,
Concepts in Enterprise Resource Planning 4th Edition Chapter three Production and Supply Chain Management Information Systems 1Concepts in Enterprise Resource.
1 MRP: Based on Dependent Demand u This chapter explores: –Master production schedule –Material Requirements Planning (MRP) »System structure »Example.
14 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall 14 Material Requirements Planning (MRP) and ERP.
1 MRP and ERP Chapter Transparency on aggregate to master plan.
Aggregate Planning and Resource Planning Chapters 13 and 14.
Material Requirements Planning. Materials requirements planning (MRP) is a means for determining the number of parts, components, and materials needed.
13-1MRP and ERP William J. Stevenson Operations Management 8 th edition.
Resource Planning Chapter 14. Step Stool Assembly.
Material Requirements Planning (MRP) and ERP
Material Requirements Planning (MRP) and ERP
1 Operations Management Chapter 14 – Material Requirements Planning (MRP) and ERP Chapter 14 – Material Requirements Planning (MRP) and ERP © 2006 Prentice.
© 2008 Prentice Hall, Inc.14 – 1 Material Requirements Planning (MRP)
Production management Content – Core work process – 6 W – Production classification – EOQ – Lean Manufacturing – Systems of Management production.
15-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
1 © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved Chapter 16 Materials Requirements Planning.
EVOLUTION OF ERP 1960’s - Systems Just for Inventory Control 1970’s - MRP – Material Requirement Planning (Inventory with material planning & procurement)
CH-8-Resource Planning Assist Prof Banu OZKESER December, 2015.
© 2008 Prentice Hall, Inc.14 – 1 Operations Management Chapter 14 – Material Requirements Planning (MRP) and ERP PowerPoint presentation to accompany Heizer/Render.
Operations Management
Material Requirements Planning (MRP) and ERP
LSM733-PRODUCTION OPERATIONS MANAGEMENT
BUAD306 MRP/ERP.
Operations Management
Material Requirements Planning (MRP) and ERP
MRP and ERP.
Management Science 2 Material Requirements Planning (MRP)
12 Inventory Management PowerPoint presentation to accompany
Material Requirements Planning (MRP) and ERP
Operations Management
Operations Management
Operations Management
14 MRP and ERP.
Operations Management
Operations Management
Presentation transcript:

© 2008 Prentice Hall, Inc.14 – 1 Operations Management Chapter 14 – Material Requirements Planning (MRP) and ERP PowerPoint presentation to accompany Heizer/Render Principles of Operations Management, 7e Operations Management, 9e

© 2008 Prentice Hall, Inc.14 – 2 Outline  Global Company Profile: Wheeled Coach  Dependent Demand  Dependent Inventory Model Requirements  Master Production Schedule  Bills of Material  Accurate Inventory Records  Purchase Orders Outstanding  Lead Times for Components

© 2008 Prentice Hall, Inc.14 – 3 Outline – Continued  MRP Structure  MRP Management  MRP Dynamics  MRP and JIT  Lot-Sizing Techniques

© 2008 Prentice Hall, Inc.14 – 4 Outline – Continued  Extensions of MRP  Material Requirements Planning II (MRP II)  Closed-Loop MRP  Capacity Planning  MRP In Services  Distribution Resource Planning (DRP)

© 2008 Prentice Hall, Inc.14 – 5 Outline – Continued  Enterprise Resource Planning (ERP)  Advantages and Disadvantages of ERP Systems  ERP in the Service Sector

© 2008 Prentice Hall, Inc.14 – 6 Wheeled Coach  Largest manufacturer of ambulances in the world  International competitor  12 major ambulance designs  18,000 different inventory items  6,000 manufactured parts  12,000 purchased parts

© 2008 Prentice Hall, Inc.14 – 7 Wheeled Coach  Four Key Tasks  Material plan must meet both the requirements of the master schedule and the capabilities of the production facility  Plan must be executed as designed  Minimize inventory investment  Maintain excellent record integrity

© 2008 Prentice Hall, Inc.14 – 8 Benefits of MRP 1.Better response to customer orders 2.Faster response to market changes 3.Improved utilization of facilities and labor 4.Reduced inventory levels

© 2008 Prentice Hall, Inc.14 – 9 Dependent Demand  The demand for one item is related to the demand for another item  Given a quantity for the end item, the demand for all parts and components can be calculated  In general, used whenever a schedule can be established for an item  MRP is the common technique

© 2008 Prentice Hall, Inc.14 – 10 Dependent Demand 1.Master production schedule 2.Specifications or bill of material 3.Inventory availability 4.Purchase orders outstanding 5.Lead times Effective use of dependent demand inventory models requires the following

© 2008 Prentice Hall, Inc.14 – 11 Master Production Schedule (MPS)  Specifies what is to be made and when  Must be in accordance with the aggregate production plan  Inputs from financial plans, customer demand, engineering, supplier performance  As the process moves from planning to execution, each step must be tested for feasibility  The MPS is the result of the production planning process

© 2008 Prentice Hall, Inc.14 – 12 Master Production Schedule (MPS)  MPS is established in terms of specific products  Schedule must be followed for a reasonable length of time  The MPS is quite often fixed or frozen in the near term part of the plan  The MPS is a rolling schedule  The MPS is a statement of what is to be produced, not a forecast of demand

© 2008 Prentice Hall, Inc.14 – 13 The Planning Process Figure 14.1 Change production plan? Master production schedule Management Return on investment Capital Engineering Design completion Aggregate production plan Procurement Supplier performance Human resources Manpower planning Production Capacity Inventory Marketing Customer demand Finance Cash flow

© 2008 Prentice Hall, Inc.14 – 14 The Planning Process Figure 14.1 Is capacity plan being met? Is execution meeting the plan? Change master production schedule? Change capacity? Change requirements?No Execute material plans Execute capacity plans Yes Realistic? Capacity requirements plan Material requirements plan Master production schedule

© 2008 Prentice Hall, Inc.14 – 15 Master Production Schedule (MPS)  A customer order in a job shop (make- to-order) company  Modules in a repetitive (assemble-to- order or forecast) company  An end item in a continuous (stock-to- forecast) company Can be expressed in any of the following terms:

© 2008 Prentice Hall, Inc.14 – 16 Focus for Different Process Strategies Stock to Forecast (Product Focus) Schedule finished product Assemble to Order or Forecast (Repetitive) Schedule modules Make to Order (Process Focus) Schedule orders Examples:Print shopMotorcyclesSteel, Beer, Bread Machine shopAutos, TVsLightbulbs Fine-dining restaurantFast-food restaurantPaper Typical focus of the master production schedule Number of end items Number of inputs Figure 14.3

© 2008 Prentice Hall, Inc.14 – 17 Bills of Material  List of components, ingredients, and materials needed to make product  Provides product structure  Items above given level are called parents  Items below given level are called children

© 2008 Prentice Hall, Inc.14 – 18 Accurate Records  Accurate inventory records are absolutely required for MRP (or any dependent demand system) to operate correctly  Generally MRP systems require 99% accuracy  Outstanding purchase orders must accurately reflect quantities and scheduled receipts

© 2008 Prentice Hall, Inc.14 – 19 Lead Times  The time required to purchase, produce, or assemble an item  For production – the sum of the order, wait, move, setup, store, and run times  For purchased items – the time between the recognition of a need and the availability of the item for production

© 2008 Prentice Hall, Inc.14 – 20 MRP Structure Figure 14.5 Output Reports MRP by period report MRP by date report Planned order report Purchase advice Exception reports Order early or late or not needed Order quantity too small or too large Data Files Purchasing data BOM Lead times (Item master file) Inventory data Master production schedule Material requirement planning programs (computer and software)

© 2008 Prentice Hall, Inc.14 – 21 Safety Stock  BOMs, inventory records, purchase and production quantities may not be perfect  Consideration of safety stock may be prudent  Should be minimized and ultimately eliminated  Typically built into projected on- hand inventory

© 2008 Prentice Hall, Inc.14 – 22 MRP Management  MRP is a dynamic system  Facilitates replanning when changes occur  System nervousness can result from too many changes  Time fences put limits on replanning  Pegging links each item to its parent allowing effective analysis of changes

© 2008 Prentice Hall, Inc.14 – 23 MRP and JIT  MRP is a planning system that does not do detailed scheduling  MRP requires fixed lead times which might actually vary with batch size  JIT excels at rapidly moving small batches of material through the system

© 2008 Prentice Hall, Inc.14 – 24 MRP in Services  Some services or service items are directly linked to demand for other services  These can be treated as dependent demand services or items  Restaurants  Hospitals  Hotels

© 2008 Prentice Hall, Inc.14 – 25 Enterprise Resource Planning (ERP)  An extension of the MRP system to tie in customers and suppliers 1.Allows automation and integration of many business processes 2.Shares common data bases and business practices 3.Produces information in real time  Coordinates business from supplier evaluation to customer invoicing

© 2008 Prentice Hall, Inc.14 – 26 Enterprise Resource Planning (ERP)  ERP modules include  Basic MRP  Finance  Human resources  Supply chain management (SCM)  Customer relationship management (CRM)

© 2008 Prentice Hall, Inc.14 – 27 Enterprise Resource Planning (ERP)  ERP can be highly customized to meet specific business requirements  Enterprise application integration software (EAI) allows ERP systems to be integrated with  Warehouse management  Logistics  Electronic catalogs  Quality management

© 2008 Prentice Hall, Inc.14 – 28 Enterprise Resource Planning (ERP)  ERP systems have the potential to  Reduce transaction costs  Increase the speed and accuracy of information  Facilitates a strategic emphasis on JIT systems and integration

© 2008 Prentice Hall, Inc.14 – 29 Advantages of ERP Systems 1.Provides integration of the supply chain, production, and administration 2.Creates commonality of databases 3.Can incorporate improved best processes 4.Increases communication and collaboration between business units and sites 5.Has an off-the-shelf software database 6.May provide a strategic advantage

© 2008 Prentice Hall, Inc.14 – 30 Disadvantages of ERP Systems 1.Is very expensive to purchase and even more so to customize 2.Implementation may require major changes in the company and its processes 3.Is so complex that many companies cannot adjust to it 4.Involves an ongoing, possibly never completed, process for implementation 5.Expertise is limited with ongoing staffing problems

© 2008 Prentice Hall, Inc.14 – 31 ERP in the Service Sector  ERP systems have been developed for health care, government, retail stores, hotels, and financial services  Also called efficient consumer response (ECR) systems  Objective is to tie sales to buying, inventory, logistics, and production