Chapter 7 Project Management and Event Implementation

Slides:



Advertisements
Similar presentations
Facilitated by Joanne Fraser RiverSystems
Advertisements

PROJECT RISK MANAGEMENT
Project Management Shuffle Directions: take the definitions from the following cards and write a song using the tune from “Cupid Shuffle”
Introduction to Systems Development and Systems Analysis
Chapter 2 The Analyst As Project Manager In Managing Information Systems 2.3.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 3.1.
Project Management.
Project Change Management
Jump to first page Dr. Henry Deng Assistant Professor MIS Department UNLV IS 488 Information Technology Project Management.
Modern Systems Analysis and Design Third Edition
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project 3.1 Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer.
Chapter 4: Project Management Objectives Define the terms project and project management, and differentiate between project and process management. Describe.
What is a project? Project Management Institute definition
Chapter 3 Managing the Information Systems Project
Action Implementation and Evaluation Planning Whist the intervention plan describes how the population nutrition problem for a particular target group.
Managing Projects. Contemplative Questions  What does project management entail?  Do I want to be a project manager? What is the nature of the work?
4. 2Object-Oriented Analysis and Design with the Unified Process Objectives  Explain the elements of project management and the responsibilities of a.
Author:Prof.Dr.Tomas Ganiron Jr1 CHAPTER 7 PROJECT EXECUTION, MONITOR & CONTROL PROCESS 7-1 Project Executing process 7-2What is Project monitor & control.
Project management INTRODUCTION. Information Technology Project Management, Fourth Edition 2 IT projects have a terrible track record. A 1995 Standish.
Copyright 2002 Prentice-Hall, Inc. Managing the Information Systems Project 3.1 Chapter 3.
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer.
Computer System Analysis
 A project is “a unique endeavor to produce a set of deliverables within clearly specified time, cost and quality constraints”
SA Capstone Requirements and Design Week 10 SYST Winter 2013 Instructors: Jerry Kotuba & Joe Varrasso.
Lesson №2. is the unique activity that has a beginning and an end time, aimed at achieving a predetermined result/goal, the creation of a specific, unique.
Module 8: Risk Management, Monitoring and Project Control We would like to acknowledge the support of the Project Management Institute and the International.
© 2005 by Prentice Hall 3-1 Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Fourth Edition.
CHAPTER 4 The strategic Planning function รศ. ดร. เสรี วงษ์มณฑา.
CIS 321—IS Analysis & Design Chapter 3: The Analyst as a Project Manager.
Project Management for RIM Professionals Last Updated: 3/13/2011 Sarina Arcari, PMP VP Implementation & Product Planning Amerigroup Corporation 3/15/11.
IT Theory Slideshows ITA, SD, IT11 By Mark Kelly Vceit.com Project Management Overview.
Year 11 Info Tech Project Management Overview. Project management overview identifying tasks, resources, people and time scheduling tasks, resources,
Appendix A Project Management: Process, Techniques, and Tools.
An Introduction to the Project Management Of Events
Centro de Estudos e Sistemas Avançados do Recife PMBOK - Chapter 4 Project Integration Management.
Introduction- Project Management By Ctrl+C & Ctrl+V 1.
Switch off your Mobiles Phones or Change Profile to Silent Mode.
BIS 360 – Lecture Two Ch. 3: Managing the IS Project.
Software Engineering Saeed Akhtar The University of Lahore Lecture 8 Originally shared for: mashhoood.webs.com.
1 Our Expertise and Commitment – Driving your Success Project Management Brown Bag October 2014 Offices in New York and Northern VA.
Ahmad Al-Ghoul. Learning Objectives Explain what a project is,, list various attributes of projects. Describe project management, discuss Who uses Project.
Lecture 3 Title: Information Technology Project Methodology By: Mr Hashem Alaidaros MIS 434.
PLUG IT IN 6 Project Management. 1.Project Management for Information Systems Projects 2.The Project Management Process 3.The Project Management Body.
 Project management is the organization and management of resources (i.e. people, information, tools and machines, materials, time, capital and energy)
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project 3.1 Modern Systems Analysis and Design.
Information Systems System Analysis 421 Chapter 3 Managing the Information Systems Project.
Information System Project Management.  Some problems that org faced with IS dev efforts include schedule delays, cost overrun, less functionality than.
Resources - Agenda Training - In Scope Thinking ahead Envisioning an outcome Communications Basic plans Risk identification Issue Identification CAP.
Managing programs that promote personal effectiveness.
Copyright 2001 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Chapter 2 Managing the Information Systems Project 2.1.
WEEK 6 Introduction to Project Management. Wk 6 Agenda Verify Hybrid Wk 5 Review Wk 5 ◦ Compressing the Schedule ◦ Risk Identification Techniques ◦ Project.
ECE2799 Project Management Prof. Mazumder Prof. Bitar Updated 3/18/2016.
Event Project Management By: Zhou Chunlin School of Tourism, Conference and Exhibitions Henan University of Economics and Law.
P3 Business Analysis. 2 Section F: Project Management F1.The nature of projects F2. Building the Business Case F4. Planning,monitoring and controlling.
The Project Management Process Groups
Fundamentals of Project Management and Schedule Development.
B U D I L U H U R U N I V E R S I T Y POST GRADUATE PROGRAM MAGISTER ILMU KOMPUTER (M.Kom) IS PROJECT MANAGEMENT.
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer.
MANAGEMENT of INFORMATION SECURITY, Fifth Edition.
Process and customizations
Chapter 3 Managing the Information Systems Project
Systems Analysis and Design in a Changing World, 4th Edition
Chapter 6: Database Project Management
Project Management and Information Security
Introduction to Project Management
Project Management.
Modern Systems Analysis and Design Third Edition
Time Scheduling and Project management
Chapter 3 Managing the Information Systems Project
Modern Systems Analysis and Design Third Edition
Presentation transcript:

Chapter 7 Project Management and Event Implementation

Chapter Objectives Describe the necessity of project management in the management of sport events Use project management tools to plan and conduct a successful event Outline the phases of project management

Project Management The dynamic process of organizing and managing appropriate resources in a controlled and structured manner to deliver the clearly defined work required to complete a project within defined scope, time, and often, cost constraints (Patel, 2008; Young, 2007). The integration of all the management tasks necessary to oversee the work before, during, and after the event has occurred. Project: a temporary and one-time venture undertaken to create a unique product with specific outcomes and benefits.

Project Management Triangle A challenge of project management is to ensure the event can be delivered within the defined constraints; those constraints being time, scope, and cost. Time: the amount of time to complete the project Cost: the amount of money budgeted to complete the project Scope: the work to be done to implement the project If the project falls behind schedule, costs go up and/or the work on the project changes if quality is to be maintained.

Resource Allocation Another challenge of project management is to ensure the proper allocation and assimilation of the inputs (e.g., people, money, time, etc.) to meet the objectives of the event. Project management tools: Help the event manager systematically define the tasks necessary to meet overall objectives Delegate those tasks to the right people Allocate financial resources appropriately Coordinate when the tasks must be completed

Phases of Project Management A main aim of project management is to control risk and potential failure by providing a clear direction that aligns with the strategic goals and objectives for the event. Five core phases: Initiation Planning Implementation Monitoring Shutdown

EMBOK International Event Management Body of Knowledge (EMBOK) has conceptualized a three dimensional depiction of the phases, domains, and processes necessary to create and deliver sport events.

Initiation The initiation phase allows sport event organizers to define the event, set objectives, and determine the sport event’s feasibility. A feasibility study will detail the viability of a sport event and the managerial requirements necessary to deliver it. The end of the initiation phase is often marked by a red or green light decision to continue to the planning stages.

Planning Planning is straightforward and can be considered a process of asking questions (Young, 2007), such as: What actions need to be taken? When will these actions occur? Who is going to take on these actions? What resources (both human, financial, and supplies/equipment) are required for these actions? The planning stage is very dynamic and continuous and sport event managers must remain proactive and diligent. It is wise not to plan all the detail at the outset to avoid reworking the plan and wasting valuable time.

Implementation Each domain area will have a specific plan that contributes to the overall event plan that must detail how and when the work will be completed. Once the work plan is complete, managers have the ability to confirm that all tasks (Young, 2007): Are allocated for someone to action Have financial resources allocated to them (if necessary), which allows for monitoring control over budget and spend Are realistic and achievable given the assigned time constraints

Monitoring/Control Monitoring and control systems are implemented to ensure that performance standards are achieved as the sport event is executed. According to Young (2007, 2013), there are three operating modes: Measuring: to determine progress through formal and informal reporting Evaluating: to determine the cause of deviations from the plan and how to react Correcting: taking actions to correct the deviations from the plan Preventative controls are established in the planning stages and continue into execution.

Closure/Shutdown Shutdown requires proper planning and execution to ensure nothing is lost, equipment is returned properly, and the flow of those involved occurs seamlessly. Shutdown is the most forgotten element of the project. Like the planning and execution stages, the shutdown should include a work breakdown structure, task and responsibility checklists, and a schedule, which is subject to risk analysis.

Tools of Project Management Software: Copper Project, Viewpath, eTask-it Software systems: Microsoft Project, OpenProj Run sheets Checklists Floor plans Flow diagram WBS: tasks broken down into manageable parts Gantt chart: a bar chart that illustrates the various tasks in a time-sequence order PERT chart: illustrates the tasks, duration, and dependency information