Legal Status Task Force Report CWS/4/8, CWS/4 BIS/5 Geneva, Switzerland 21- 24 March 2016 Young-Woo YUN Head, Standards Section.

Slides:



Advertisements
Similar presentations
GSC: Standardization Advancing Global Communications Towards a Common ITU/ISO/IEC Patent Policy by Masamichi Niiya Telecommunication Standardization Bureau.
Advertisements

1 Geneva, October 2008 YUN Young-Woo IP INFORMATION & WIPO STANDARDS.
United States Patent and Trademark Office – IP5 Foundation Projects: why are they necessary for work sharing and what challenges are IP5.
Survey on application numbering systems Committee on WIPO Standards, third session Anna Graschenkova Standards Section Geneva 15 – 19 April 2013.
XML4IP Project- ST.96 Preparation
Revision of WIPO Standard ST.14 Committee on WIPO Standards, third session Geneva 15 – 19 April 2013 Anna Graschenkova Standards Section.
1 XML Standardization: Progress Report on WIPO Standards USPTO May 12, 2014 CWS – Fourth Session.
THE STANDARDS DEVELOPMENT PROCESS STEP 1 PUBLIC AND COMMITTEE PROPOSAL STAGE PUBLIC AND COMMITTEE PROPOSAL CLOSING DATE FIRST TECHNICAL COMMITTEE MEETING.
1 1 1 AIPLA American Intellectual Property Law Association USPTO Updates Including Glossary Pilot Program Chris Fildes Fildes & Outland, P.C. IP Practice.
From Paper to Paperless Straight-through Electronic Disclosure and Abolition of Paid Announcement Requirement (The Electronic Disclosure Project) Press.
Office of Inspector General (OIG) Internal Audit
TUTORIAL Grant Preparation & Project Management. Grant preparation What are the procedures during the grant preparations?  The coordinator - on behalf.
Software Engineer Report What should contains the report?!
Project “Sea and Air Container Track and Trace Technologies: Analysis and Case Studies” TPT 01/2002T DRAFT FINAL REPORT.
1 United States Patent and Trademark Office Revised PCT International Search and Preliminary Examination Guidelines Biotech/ChemPharm Customer Partnership.
The Madrid system An update on the latest development Israel February 2012 Debbie Roenning Director, Legal Division, Brands and Designs Sector.
Development of WIPOSTAD Progress report by the International Bureau Committee on WIPO Standards Geneva May Anna Graschenkova Industrial Property.
Sector Planning Process Alachua County Commission July 8 th,
India and the Madrid Protocol An update on the Madrid system AIPPI, Hyderabad October 14, 2011 Debbie Roenning Director, Legal Division, Brands and Designs.
Overview of ICH Procedures July 2015
The 16 th Session of WIPO Standing Committee of the Law of Patents Catherine Eunkyeong Lee APAA Patent Committee Meeting November 13, 2011, Manila.
1 1 AIPLA Firm Logo American Intellectual Property Law Association “The Global Dossier Initiative” Anthony Venturino – Novak Druce Connolly Bove + Quigg.
GEO Strategic Plan : Implementing GEOSS AN UPDATE GEO WORK PLAN SYMPOSIUM 05 MAY 2015 GENEVA, SWITZERLAND.
Options for CBP Agreement and EC Membership For Principals’ Staff Committee Consideration March, 2013.
Association of National Stakeholders in Traffic Safety Education (ANSTSE) Update on National Driver Education Standards and Initiatives
Creating Pathways for Education, Career and Life Success Webinar: Developing a Pathways Plan January 18, 2013 Facilitated by Jeff Fantine, Consultant.
BLACA - IPI seminar 5 October th anniversary of the Rome Convention Bird & Bird.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.1 Steps in the Licensing Process Geoff Vaughan University.
Update: Grocery Refrigeration Provisional Standard Protocol for Site Specific Savings RTF Meeting June 28,
Transmitted by the representative of JAPAN Toward Realization of the “Mutual Recognition of International Whole Vehicle Type Approval (IWVTA)” under the.
Towards Data Management Principles (report of progress of the Task Force on Data Management Principles) Alessandro Annoni European Commission Joint Research.
Promotion of Innovation: Usefulness and value of Patent Information Andrew Czajkowski Head, Innovation and Technology Support Section Ulaanbaatar March.
Association of Childrens Welfare Agencies Conference 2006 Improving Care Through Accreditation- The Role of the NSW Children’s Guardian.
 Objectives  To determine the importance and functions of working papers in IAing in Malta  To analyse the manner of recording throughout the internal.
Legal Status Data Legal status project and relating developments in CWS Patentscope Users Forum June 18, 2013 Angel López Solanas.
Projects spanning over two programming periods Department for Programme and Project Preparation Beatrix Horváth, Deputy Head of Department Budapest, 5.
Oral Progress Report on ATRs’ Task Force Young-Woo Yun Leader of the ATRs’ Task Force World Intellectual Property Organization.
1 1 1 AIPLA Firm Logo American Intellectual Property Law Association U.S. Implementation of the Hague Agreement For Designs John (Jack) J. Penny, V Event.
Fostering worldwide interoperability 1 Geneva, July July, 2009 Yukio Hiramatsu Chairman, IPR Committee, TTC Global Standards Collaboration.
Chris Fildes FILDES & OUTLAND, P.C. IP Practice in Japan Committee Pre-Meeting AIPLA Annual Meeting, October 20, 2015 USPTO PILOT PROGRAMS 1 © AIPLA 2015.
ISO Current status of development ​ ​ ISO development process ​1​1.
Session A5/B4 Mother Rule Updates 2015 GaPSC Certification and Program Officials Conference December 2, 2015 Julie Beck, Angie Gant, and Penney McRoy.
NATIONAL CONFERENCE Intellectual Property Policies for Universities and Innovation dr. sc. Vlatka Petrović Head, Technology Transfer Office Acting Head,
The Data Sharing Working Group 24 th meeting of the GEO Executive Committee Geneva, Switzerland March 2012 Report of the Data Sharing Working Group.
1 IFAD consideration of a Code of Conduct for Executive Board Representatives Historical Background Presentation to an Informal Seminar of the Executive.
Slovene National statistical system Irena Krizman Former Director-General Statistics Slovenia.
Niclas Morey23 October 2015Director, International Organisations, Trilateral and IP5 Technical Harmonization in the IP5 EPO’s Global Dossier, CCD and CPC.
Global Dossier Mr. Mark Powell Deputy Commissioner
CONFERENCE IMPLEMENTATION OF MARKETS IN FINANCIAL INSTRUMENTS DIRECTIVE -MiFID- Split, June 2007 OPENING SPEECH Ante Samodol President of the Board.
Internal Audit Section. Authorized in Section , Florida Statutes Section , Florida Statutes (F.S.), authorizes the Inspector General to review.
Study on the Patent Involved in National Standards China National Institute of Standardization September, 2009.
The International Registration of Designs Background and Key Principles of the Hague System.
PATENT Designed and Developed by IP Laboratory, MNNIT Allahabad , Uttar Pradesh, India.
Alain GALLOCHAT, French Research Ministry
Support- IRDiRC Proposed Work Plan And Communication Strategy
Overview of the Neighbourhood Plan Process
Implementation of the Sustainable Development Goals (SDG) in the Republic of Uzbekistan Geneva, April 12, 2017.
11/23/13 Topic 5: Legal Status Juneho Jang Senior Regional Manager.
Outcome TFCS-11// February Washington DC
Certification system for prepackages
Final Report of TF-CS/OTA September The Amba Hotel, London
Presented to IEEE Standards Education Committee 11 April 2014
Progress Report TF Sequence Listing in XML
Current Conflicts and Complications
Task Force on Target Setting and Reporting TFTSR
Informal document GRVA st GRVA, September 2018
Working Party on General Safety Provisions (GRSG) General information
2019 IP5 heads of office Meeting with IP5 Industry
DRAFT ISO 10007:2017 Revision Overview Quality management – Guidelines for configuration management ISO/TC176 TG 01.
Presentation transcript:

Legal Status Task Force Report CWS/4/8, CWS/4 BIS/5 Geneva, Switzerland March 2016 Young-Woo YUN Head, Standards Section

Content Background Requirements of legal status data Overview of legal status TF’s activities Objectives and scope of new standard Roadmap for new standard development Composition of legal status event information Structure of events list Overall patent prosecution model Open issues Legal status TF 2016 Work Plan 2

Background The Committee on WIPO Standards (CWS), held in April 2013, agreed to create: Task No.47: “prepare a proposal to establish a new WIPO standard for the exchange of patent legal status data by industrial property offices. Once this task is completed, the corresponding proposal should be extended to trademarks and industrial designs.” Legal Status Task Force to carry out Task No. 47 3

Requirements of legal status data reliable / accurate in time Accessible standardized comprehensive and understandable 4

Overview of LSTF’s Activities The Legal Status TF (LSTF) started discussion in December 2013 Representatives from 25 Organizations including User Groups participate in the LSTF Main Achievements Scope of the new standard Roadmap Composition of legal status event information List of Key events (18 events) Draft list of detailed events (131 events) Draft overall patent prosecution model 5

Objectives and Scope of New Standard the new standard provide recommendations to promote efficient exchange of patent legal status data by IPOs to facilitate access to that data by IP information users, other IPOs, IP data providers, the general public and other interested parties. the new standard to specify what legal status event data should be exchanged how that data should be structured. 6

Roadmap for new standard development Three Discussion Phases with specific topics: Phase 1: Objectives and scope of the new standard Phase 2: Legal status data to be exchanged Phase 3: Structure of associated data with the status event Codification of legal status event data for the data exchange Final draft for consideration and adoption at the fifth session of CWS 7

Composition of status event information Stage-Event-State, to indicate the legal status event information of an application or patent at the given time Six Stage: Filing, Examination, Pre-grant, Grant, Post- grant, Termination (likely) 18 Key Events: Three States: E.g.: Filing-ApplicationFiled-Active 8

18 Key Events Application filed Application discontinued Application revived Examination requested Pre-grant review requested IP right granted Protection beyond IP right term granted IP right ceased IP right reinstated IP right review requested IP right maintained post IP right review Application or IP right permanently terminated 9

18 Key Events (cont.) Document modified Document published Party data changed Licensing information recorded Time limit extended Fee paid 10

[Category] Application discontinuation [Key events] Application discontinued [Detailed events] Application withdrawn Application deemed to be withdrawn, abandoned or lapsed Application refused following examination … Structure of Events List 11

Overall Patent Prosecution Model (draft) Application filed Application discontinued IP right granted Examination requested Pre-grant review requested IP right granted IP right review requested Application discontinued Application revived E E E E E Filing Grant Termination (likely) Examination Pre-grant Post-grant IP right maintained post IP right review E (Events): 1.Document published; 2.Document modified; 3.Party data changed; 4.Licensesing information recorded; 5.Time limit extended; or 6.Fee paid. E (Events): 1.Document published; 2.Document modified; 3.Party data changed; 4.Licensesing information recorded; 5.Time limit extended; or 6.Fee paid. Protection beyond IP right term granted Application revived IP right ceased IP right reinstated IP right ceased Applicaion/IP right permanently terminted Pre-grant review requested Application discontinued Application revived ActiveInactive/ Terminated 12

Open Issues whether the key events should be mandatory or not; list of detailed events; exchange frequency of legal status data; set of events to be delivered: 1. Key events only, 2. Key and Detailed events, or 3. Key and Detailed events with IPOs’ actual events whether stage transition information (one stage to another) to be provided with events; whether snapshot or history of events to be exchanged; Guidance for IP Offices to implement the new Standard. 13

LSTF 2016 Work Plan (provisional) Finalizing Phase 2 by June 2016 List of draft detailed events Guidance for office specific data Mapping IPOs’ actual events to the standard events Starting Phase 3 from July Codification of legal status data Defining minimum data set Preparing a final draft of new standard Organizing the LSTF meetings Online conferences Face-to-face meetings in

Questions and Discussions Thank you for your attention! 15