Public administration process modelling and reengineering in the Czech Republic DBR 30. 10. 2008 Daniel Trnka.

Slides:



Advertisements
Similar presentations
Project Quality Plans Gillian Sandilands Director of Quality
Advertisements

Slovenian experience MEASURES TO STRENGHTEN THE CIVIL DIALOGUE AND PARTNERSHIP Irma Mežnarič Brussels - 10 October 2006.
EU funds’ evaluation plan , Latvia
POLAND Development Management System in Poland Brussels, 2 July 2010.
Course: e-Governance Project Lifecycle Day 1
Information & Communication Technology for Development in Arab Region e-government in the Arab Region Najat Rochdi Regional Coordinator
PAYMENT MEDIA PROTECTION Czech National Bank, Prague Cash and Payment System Department.
REGULATORY POLICY AND GOVERNANCE FOR STRENGTHENING COMPETITIVENESS 15 December 2014 University of Economics, Prague Daniel Trnka Regulatory Policy Division,
Bylaw on drug demand reduction in Serbia. Bylaw(s) - principles  should be based on existing law(s)  should complement existing laws  should not be.
Lecture(2) Instructor : Dr. Abed Al-Majed Nassar
CONTACT SEMINAR November 2008 Project management tools.
EVALUATION AND QUALITY ASSURANCE STRATEGY PRESENTED BY DR SHYAM PATIAR.
Integration of Regulatory Impact Assessment into the decision making process in the Czech Republic Aleš Pecka Department of Regulatory Reform and Public.
LOGO MIRJANA SEKULOVSKA, PhD, DEPUTY MINISTER OF INFORMATION SOCIETY Republic of Macedonia Ministry of Information Society.
1 CHCOHS312A Follow safety procedures for direct care work.
Reform of the Child Care System: DEINSTUTIONALISATION – MAJOR PRIORITY IN THE STATE POLICY 3-6 July July 2007.
Tools for Simplification – Lessons from the Mexico Experience Dr. Manuel Gerardo Flores Senior Economist Regulatory Policy Division OECD OECD-Israel Conference.
Establishment and Development of the Internal Audit System for the Public Sector in Kyrgyz Republic INTERNAL AUDIT COMMUNITY OF PRACTICE ISTANBUL
1 Bölgesel Rekabet Edebilirlik Operasyonel Programı’nın Uygulanması için Kurumsal Kapasitenin Oluşturulmasına Yönelik Teknik Yardım Technical Assistance.
INTERNAL AUDIT IN UKRAINE State Financial Inspection of Ukraine
Evaluation plans for programming period in Poland Experience and new arrangements Ministry of Infrastructure and Development, Poland Athens,
Strategic management in PA observations from the Czech Republic David Špaček , TED, Cluj, Romania.
1 European Lifelong Guidance Policy Network Work Package 1 – Career Management Skills Synthesis Meeting NATIONAL PROGRAMME FOR CAREER GUIDANCE Aleksandra.
EQARF Applying EQARF Framework and Guidelines to the Development and Testing of Eduplan.
INNOVATION 2004 Prague, Nov. 30/Dec.1-3, 2004 The EUREKA Initiative: Assessment and Evaluation Procedures Svatopluk Halada EUREKA Secretariat, Brussels.
Public Administration Politics not politics What is the connection? Politics sets the tasks for administration. but should not manipulate it’s offices.
Education Modules’ Devolopment for Tecnical and Legal Issues in Energy Sector Technologies Kick-off Meeting February 2 / Ankara ndth.
Quality Management (WP5) Roman CHIRCA Agency for Innovation and Technological Transfer TecTNet ………... This project has been funded with support from the.
1 European Lifelong Guidance Policy Network National Guidance Forum of the Czech Republic Open Session Career Guidance Council in Lithuania Aleksandra.
Revising priorities in the statistical programme Management Group on Statistical Cooperation * 24 & 25 March 2011 * Carina Fransen.
Training in public administration in the Czech Republic „today“ Václav Melichar, training department Institute for Public Administration Prague.
THE PRIORITIES OF PUBLIC ADMINISTRATION REFORM IN THE MIDDLE EAST THE PRIORITIES OF PUBLIC ADMINISTRATION REFORM IN THE MIDDLE EAST 1. Decentralization.
Regional Training/Consultations on Capacity Development for Sustainable Growth and Human Development in Europe and CIS Application of Capacity Development.
1 Workshop of the Ministry of Finance of the Czech Republic How to use European funds within a PPP project? Jana Maláčová Ministry for Regional Development/
Guidance in LLL concept – from strategies to practice Tereza Listová, MoEYS, NGF Silvie Pýchová, EG, ELGPN.
Control of implementation of the law on civil service and related legislation Arvydas Kazlauskas Chief specialist of the Division of Civil Service Terms.
Proposals on standardisation process in ESS, The Hague_ ESS net Preparation of Standardisation 1 Proposals on standardisation process.
SAFETY MANAGEMENT SYSTEMS IN APPLICATION OF THE SEVESO II DIRECTIVE LESSONS LEARNT FROM IMPLEMENTATION IN SMEs O. Salvi, I. Vuidart, M. Caumont, F. Prats.
Indicators to Measure Progress and Performance IWRM Training Course for the Mekong July 20-31, 2009.
1 Simplification in France: A remodelled approach Brussels, 6th February 2009 Denis Besnainou, Direction générale de la modernisation de l’État.
ADMINISTRATIVE PROCEDURES REVIEW CONTENT, METHODOLOGY AND INSTRUMENTS Presented by: Nguyen Viet Anh, Member of the Prime Minister’s Special Task Force.
E-Government Curriculum for Public Sector Employees Peter Parycek A ustrian Federal Chancellery / Division of ICT-Strategy A-1014 Vienna, Ballhausplatz.
Regional Workshop to disseminate Water Supply and Sanitation Standards of Service, adapted to LDCs Préparation to the ISO TC 224 Drafts Standards test.
Structural Funds Managing Authority – Ministry of Finance 1 Technical Assistance Ilze Aleksandroviča Head of Control and Development Division EU Funds.
National Information Communication Technologies Strategy Vasif Khalafov “National strategy” working group - Web -
Strategy on creation of the system for continuous professional training of staff employed in social assistance system (for ) draft Ministry of.
Czech Republic Czech Trade Inspection CAF Project © CZECH TRADE INSPECTION 2005 AIM : SURVEIILANCE ACTIVITIES UNIFICATION INSTRUMENT.
1 Reorganisation of the Managing Authority for the EU Funds Andžs Ūbelis Deputy State Secretary, Ministry of Finance Head of the Managing Authority of.
4rd Meeting of the Steering Committee on Competence of Human Resources for Regulatory Bodies Vienna, 4-7 December 2012 Current Status of the Human Resources.
Ministry of State Administration and Administrative Reform, Republic of Bulgaria 18 February 2008 Brdo, Slovenia 18 February 2008 Brdo, Slovenia Contribution.
An overview of OECD Strategies for Improving Regulatory Performance Regulatory Reform and Building Governance Capacities – New Delhi 3 December 2009 Mr.
MEMORANDUM OF AGREEMENT TEMPLATE Svilena Simeonova, Director of Internal Control Directorate, Ministry of Finance, Bulgaria.
The Power of Recommendations Dainius Jakimavičius National Audit Office of Lithuania Vilnius, April 23, 2013.
Pilot Project on implementation of SEA for regional planning in Ukraine Prof. Dr. Michael Schmidt Dmitry Palekhov Brandenburg University of Technology.
Impact analysis during the harmonisation process with the EU and effects on Lithuanian economy Giedrius Kadziauskas, Senior Policy analyst 23 rd Fabruary.
LOCAL GOVERNMENT IN TIMOR-LESTE Ministry for State Administration 6th Constitutional Government 1.
Public Display Lessons Romania. ANCPI is the National Agency for Cadaster and Land Registration public institution which currently operates as an entity.
School practice Dragica Trivic. FINDINGS AND RECOMMENDATIONS FROM TEMPUS MASTS CONFERENCE in Novi Sad Practice should be seen as an integral part of the.
Information by the Managing Authority on evaluations of EU funds in 2009 Monitoring Committee meeting 25 March 2009.
I. Annual audit plan and summary audit plan II. Annual audit report and annual summary audit report III. Information Supporting System of Internal Audit.
PUBLIC FINANCE IN THE REPUBLIC OF MOLDOVA: REFORMS AND THE DEVELOPMENT STRATEGY PLENARY SESSION OF THE TREASURY COMMUNITY OF PRACTICE JUNE 1-3, 2015, KISHINEV,
TAIEX-REGIO Workshop on Applying the Partnership Principle in the European Structural and Investment Funds Bratislava, 20/05/2016 Involvement of Partners.
19th Council of Europe Meeting of the Workshops for the Implementation of the European Landscape Convention The implementation of the European.
Process optimisation based on life events
11th meeting of the Monitoring Committee of the Operational Programme Research, Development and Education Prague, 12th October 2017 (2nd day)
RIA: Communication – building credibility
Our Understanding of Institution/Capacity Building
Czech Republic Petr Fejtek Administrative Advisor Ministry of Interior.
Evaluation plans for programming period in Poland
Definition of Project and Project Cycle
Presentation transcript:

Public administration process modelling and reengineering in the Czech Republic DBR Daniel Trnka

OBSAH  Hexagon of public administration  Pilot project  Course of the project

Hexagon of public administration Friendly public services and effective public administration

PILOT PROJECT  Objective: –To verify the application of process modelling across the whole field of public administration –To define the procedure for process modelling in public administration and requirements concerning IT architecture and functionalities  4 agendas (processes) - e. g. model identity card – change of the permanent residence

Model: Agenda Identity Card

PILOT PROJECT – RESULTS  Public administration process modelling does not differ from process modelling in other fields;  Preparation is the most demanding phase;  Process models display the reality very clearly, they allow to detect inconsistencies and shortcomings, to model changes etc.;  Process modelling does not excessively burden public administration employees;  Process models allow, depending on the methodology applied, to view the agendas (processes) from various perspectives – particular components of Hexagon;  The reality is in some cases different from the theory, sometimes even from legislative provisions;  A close co-operation of all participants (ministries, regions, municipalities) is essential.

COURSE OF THE PROJECT RE-ENGINEERING AND RE-DESIGN OF PUBLIC ADMINISTRATION Rationalisation of administrative proceedings and minimising of bureaucracy Standardisation and optimisation of a process – creation of a referential process model (best practice) Using of the process model at various levels /tiers) of public administration PROJECT KICK-OFF PROJECT IMPLEMENTATION CONTROL AND EVALUATI ON Description of the extent of the project and its basic elements Determination of agendas (priority areas) for processing Definition of principles for methodology of modelling Selection of an IT architecture and functionality needs Assuring of the project implementation Forming of process models of agendas Publication Re-engineering and re-design of public administration Modelling and simulation of alternative processes Implementation of measures for simplification and increasing effectiveness of public administration Planning and systematic realisation of changes in public administration Reflection of functioning structures of new processes in public administration in connection with strategic objectives Control of results of measures applied Control of data consistency and data updating CONSULTATIONCONSULTATION

 Description of the extent of the project and its basic elements (agenda, process, service)  Determination of priority areas/agendas  Definition of methodology of modelling  Selection of an IT architecture  Organisational and financial provision PROJECT KICK-OFF PROJECT IMPLEMENT ATION CONTRO L AND EVALUA TION

 Time schedule of the implementation –1st stage – 2009 (2013) –2nd stage – 2010 – 2013  Expected outputs of the 1st stage –SW for agenda modelling and methodology for modelling –Database (deposit site for models and data) –Ensuring of training and access to SW for all ministries –40-60 agendas – single output of the 1st stage, other outputs used also for the 2nd stage –Estimated costs 120 mil. CZK (4,76 mil. €) PROJECT KICK-OFF PROJECT IMPLEMEN TATION CONTROL AND EVALUATI ON

 Elaboration of process models –To describe an agenda on the basis of legal regulation –To describe an agenda on the basis of the practice – exercise of state administration by particular authorities and co-operating subjects –To detect diversions –To create a database of repetitious processes that will be exploited for modelling of other processes for reasons of economy; –To figure out costs connected with an agenda (time and tangible costs for elaboration of an agenda both as a whole and for particular authorities); –To formulate demands for technologies and organisational structure. PROJECT KICK-OFF PROJECT IMPLEMENTATION CONTROL AND EVALUATI ON

 Publication of outputs (communication strategy)  Description of the process structure and provided operations and services from the point of view of –Legislation a legal requirements; –Structure of a type organisation, working roles and qualification needs; –Information and communication technologies; –Structure of expenses and –A client of public administration. PROJECT KICK- OFF PROJECT IMPLEMENTATION CONTROL AND EVALUATIO N

 Control of results of implemented measures  Control of data consistence  Data updating PROJECT KICK-OFF PROJEC T IMPLEM ENTATIO N CONTROL AND EVALUATION

AIMS OF PROCESS ANALYSES  Revealing of inefficient and duplicate activities;  Identification of the „bottle-necks“ of the process;  Contents evaluation of specific organisational units from the aspect of general course of the process;  Enumerating and analysis of division of working time fund into particular activities – services for citizens;  Ensuring of optimal exploitation of sources;  Reduction of administrative activities;  Creation of conditions for application of strategic planning in public administration, risk monitoring and risk management.

current situation desirable situation  Modelling and simulation of alternative solutions;  Implementation of measures for simplification and increasing effectiveness of public administration;  Planning and systematic realisation of changes in public administration;  Reflection of functioning structures of new processes in public administration in connection with strategic objectives. PROJECT KICK-OFF RE-ENGINEERING AND RE-DESIGN OF PUBLIC ADMINISTRATION PROJECT IMPLEMENTATI ON CONTROL AND EVALUATI ON

QUESTIONS

THANK YOU FOR YOUR ATTENTION Daniel Trnka Director of the Department of Regulatory Reform and Quality of Public Administration