MuTrg/Mutr Optimization Yoshi-mitsu Imazu. ● Mutr Lv1 timing scan Adjustment of Lv1 timing Online/Offline shape cut values ● Mutrg threshold scan → Better.

Slides:



Advertisements
Similar presentations
Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1.
Advertisements

Post Run13 MuTR/MuTrig Maintenance 1. Cathode Cable in mis-contact : South Station-1 Oct-5, Gap-2 2.
H/Abb -> 4b’s process & Multi-Et-Threshold Study for 4jet Trigger Kohei Yorita Young-Kee Kim University of the FTK Meeting on July 13 th, 2006.
MWPC Commissioning: A Status Report What the MWPC’s do and how Data taking Jan-Feb 2000 Results from the Analysis.
27/02/2002M.D.P. - ATLAS Muon Week1 First results of Atlas RPC cosmic rays test Massimo Della Pietra Atlas RPC Group Napoli ( M. Alviggi, V. Canale, M.
Report ~first collision Kotaro Kijima 2010/01/25 Local lab meeting.
MuTRG for Run12 RIKEN/RBRC Itaru Nakagawa 1. Run12 Schedule 14 Cryoweeks -> Mid Jan. ~ End of April GeV pp (2+3 weeks) GeV pp (1+6 weeks)?
MuTr/MuTrig Performance of Run13 RIKEN/RBRC Itaru Nakagawa 1.
ADTX Threshold Scan RIKEN/RBRC Itaru Nakagawa 1. Run13 ADTX Threshold Scan March 3, 2013 MUID1D HV=Run12 Nominal Setting MuTrig e-Log entry=#
EH1 (AD 1&2, IWS, OWS) PMT Jul. 30 – Aug. 20 RollingGain Calibration Summary Zhe Wang (BNL) and Qing He (Princeton) Aug. 22, 2011.
SPD commissioning Ricci, Míriam, Daniel, Edu, Hugo et al. from 1.
ARA Testbed Efficiency (Rough Cut) November 29 th Ben Rotter.
Update FTK Meeting 07/13/06 Erik Brubaker U of Chicago.
Octal ASD Certification Tests at Michigan J. Chapman, Tiesheng Dai, & Tuan Bui August 30, CERN.
Andrea Giammanco CMS Tracker Week April DS ROD Prototype: “final” optohybrids “final” CCUM integrated in the rod with new FEC_to_CCUM adapter (Guido.
Run10 Preparation Status and Issues Itaru Nakagawa RIKEN/RBRC.
W trigger upgrade simulation Kazuya Aoki Kyoto Univ. Muon Physics and Forward Upgrades Workshop Santa Fe, June 2004.
The Transverse detector is made of an array of 256 scintillating fibers coupled to Avalanche PhotoDiodes (APD). The small size of the fibers (5X5mm) results.
MuTr HV Optimization RIKEN/RBRC Itaru Nakagawa 1.
Tracking at LHCb Introduction: Tracking Performance at LHCb Kalman Filter Technique Speed Optimization Status & Plans.
14/02/2007 Paolo Walter Cattaneo 1 1.Trigger analysis 2.Muon rate 3.Q distribution 4.Baseline 5.Pulse shape 6.Z measurement 7.Att measurement OUTLINE.
Oct C. Smith - PCAL/EC Commissioning 1 PCAL/EC Commissioning Document
Run11 MuTrig-FEE Summary RIKEN/RBRC Itaru Nakagawa 1.
Performance of PHENIX High Momentum Muon Trigger 1.
Outrigger Timing Calibration & Reconstruction Milagro – 11/17/03 Shoup – 1 Purpose: To incorporate outrigger hits in event angle fitting Additionally incorporated.
High School Cosmic Ray Projects and Training Basalt High School Math and Science Club October 14, 2004.
Chris Parkes for VELO software Group VELO Software Overview & Shutdown Planning Organisation Milestones 3 Critical Areas.
South SG1 Trigger High Rate Sanghwa Park, Katsuro Nakamura, Yoshimitsu Imazu, and Itaru Nakagawa 1.
South SG1 Trigger High Rate Sanghwa Park, Katsuro Nakamura, Yoshimitsu Imazu, and Itaru Nakagawa 1.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
QGP France sept 2010Sanjoy Pal Performances of the tracking Chambers of the ALICE MUON Spectrometer 1.
Timing Counter Report of Feb 20th, 2008 F.Gatti. Final Construction Phase of TC TC with fibers exposed TC upside down for Fiber APD gluing High reflectance.
NA62 Gigatracker Working Group Meeting 23 March 2010 Massimiliano Fiorini CERN.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
Introduction to High Momentum Trigger in PHENIX Muon Arms RIKEN/RBRC Itaru Nakagawa 中川格 1.
1 The PHENIX Muon Identifier Front End Electronics Andrew Glenn (University of Tennessee), for the PHENIX collaboration Andrew Glenn 5/1/01 April APS Meeting.
HBD electronics status All the ADC and XMIT boards are installed. –Top 3 crates are for the ADC, XMIT boards –Bottom crate is for test pulse boards/future.
Time Meeting 3/10/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
1 EMC Trigger Summery from RunII and discussion for RunIII H.Torii, Kyoto Univ. ERT Lvl-1 meeting.
Performance of the PHENIX Muon Identifier Introduction Calibration with cosmic rays Performance in Au+Au collisions Summary Hiroki Sato, Kyoto University.
Performance of PHENIX High Momentum Muon Trigger.
High Multiplicity Trigger Operation Status RIKEN/RBRC Itaru Nakagawa On behalf of Toru Nagashima, Aaron Key, SeYoung Han, Shoichi Hasegawa 1.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
1/27/2016 R.Seidl: status of simulation1 W muon analysis in PHENIX Status of the background understanding, signal, smearing and asymmetries R.Seidl (RBRC)
1 Plans for first beams - - triggers from the BRM group (BSC, BPTX) Gábor Veres for the BRM group CMS Trigger Technical Coordination Meeting 8 October,
1 Onsite Status Itaru Nakagawa RIKEN/RBRC. 2 Schedule.
Recap Clamp for MuTr Station-3 Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration Especially credit to: Tsutomu Mibe (KEK) Yoshinori Fukao.
Performance of PHENIX High Momentum Muon Trigger.
Analysis for QA (temporary) Hideyuki Sakamoto 1 st October 2007 MICE Tracker Phone Meeting.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
MuTrig-FEE Install Status RIKEN/RBRC Itaru Nakagawa 1.
Run11 MuTrig Performance RIKEN/RBRC Itaru Nakagawa 1.
1 Report on PHENIX work in Apr/May/Jun Kotaro Kijima 大西洋~
06/22/04J. Lajoie – Santa Fe Muon Workshop1 Level-1 Triggers for Run-5 Outline –Vertex Triggers : BBC, ZDC (not discussed here) BBC will have ability.
Jamaica 11 Jan.8, 2009 Muon Trigger Upgrade at PHENIX RIKEN/RBRC Itaru Nakagawa RIKEN/RBRC Itaru Nakagawa.
A. Tsirigotis Hellenic Open University N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch Reconstruction, Background Rejection Tools.
Evelyn Thomson Ohio State University Page 1 XFT Status CDF Trigger Workshop, 17 August 2000 l XFT Hardware status l XFT Integration tests at B0, including:
Quark Matter 2002, July 18-24, Nantes, France Dimuon Production from Au-Au Collisions at Ming Xiong Liu Los Alamos National Laboratory (for the PHENIX.
FVTX Trigger Toru Nagashima, Yomei Fukushima (Rikkyo University) Shoichi Hasegwa (J-Parc) Itaru Nakagawa RIKEN and FVTX Group 1.
Proposal for the after-pulse effect suppression  Observation of pulses and after-pulses  Shape measurement  Algorithm  Results  Efficiencies for after-pulse.
Muon Trigger Performance Run12 PP510GeV Sanghwa Park (SNU/RIKEN)
EZDC spectra reconstruction and calibration
FVTX High Multiplicity Trigger for Run15
CLAS12 software workshop
Roberto Chierici - CERN
Design of Digital Filter Bank and General Purpose Digital Shaper
Maki KUROSAWA VTX Group 2014 Feb 20
11th Pisa meeting on advanced detectors
Eduardo do Couto e Silva Feb 28, 2006
Presentation transcript:

MuTrg/Mutr Optimization Yoshi-mitsu Imazu

● Mutr Lv1 timing scan Adjustment of Lv1 timing Online/Offline shape cut values ● Mutrg threshold scan → Better noise suppression (noise vs charge efficinecy) DCM (Online) lower bound release going to applied? → Better Hit distribution (charge eff. & reconstructed position) Tools: Private Tree, or QA hist → READY Tools: Noise Data & Private Tree (charge efficiency) → READY ● Rough GTM scan → Better trigger efficiency (more hit in 3 window) Order Acceptable noise rate (SG1) Plane Noise Rate Trigger Rate consistency check Tools: Mutrg Hit Histo (MutrgCalibAna) & Analysis → READY Sample: ~500k MuID per Lv1 Sample: ~500k MuID per thresh., Mutrg: LOGIC=OR and AND2 in st0 Width=1? Sample: 200k MuID per point., Mutrg: LOGIC=OR and AND2 in st0 Width=3(1) Note relative ratchet timings (backup)

Lv1 = 4, 5, 6, 7, 8 Sample: ~500k MuID per Lv1 Lv1=5Lv1=7 Plane1 (Non-stereo) Plane0 (Stereo) Plane1 (Non-stereo) Plane0 (Stereo) [BCLK] ● ~2 BCLK difference between stereo and non-stereo planes Pkstrip in TrkAss Clstr, South [oct summed, no cut on trk] (Run11 Commissioning) Timing Distribution: NOT IN QA plots NOT IN QA plots ● Mutr Lv1 timing scan (run12: elog 952)

(ADC2 – ADC0)/ADC2 for Pkstrp in TrkAss Clstr, South [oct summed] Plane1 (Non-stereo) Plane0 (Stereo) (Run11 Commissioning) Lv1 = 5 Lv1 = 6 Lv1 = 7 Lv1 = 8 Lv1 = 9 Note: Non-stereo plane 1-2 BCLK DELAYED against stereo plane by Mutrg FEE installation Upper cut Lower cut Upper cut Lower cut Tuned for non-stereo (Red) (Run11-12 setup) Sampling timing: Pushing Backward Sampling timing: Pushing Forward → Shape recovery by pushing lv1 backward → Recovery from lower edge IN QA plots

“Pkw” of TrkAss Clstr, South [clsz>1, oct summed, no cut on trk] (Run11 Commissioning) Lv1 = 5 Lv1 = 6 Lv1 = 7 Lv1 = 8 Lv1 = 9 pl0 pl1 pl0 pl1 pl0 pl1 pl0 pl1 pl0 pl1 Looks like ~2BCLK diff btw pl0 & pl1 (# pl0 / # pl1 = 0.95) (# pl0 / # pl1 = 0.85) (# pl0 / # pl1 = 0.65) (# pl0 / # pl1 = 0.40) (# pl0 / # pl1 = 0.30) ● Non-stereo stereo diff. explained by Timing diff (or impact of shape cut1) ● Lv1 should be optimized on stereo plane (earlier signal) as far as non-stereo kept away enough from upper bound (impact on Q ~ few % only) IN QA plots

“Clsz” of TrkAss Clstr, South [oct summed, no cut on trk] (Run11 Commissioning) Lv1 = 5Lv1 = 8 pl0 pl1 pl0 pl1 (# pl0 / # pl1 = 1.00) (# pl0 / # pl1 = 0.70) Lv1 = 6 Lv1 = 7 Lv1 = 9 pl0 pl1 pl0 pl1 pl0 pl1 Looks like ~2BCLK diff btw pl0 & pl1 (# pl0 / # pl1 = 1.00) (# pl0 / # pl1 = 0.95) (# pl0 / # pl1 = 0.50) ● Non-stereo stereo diff. explained by Timing diff (or impact of shape cut1) ● Lv1 should be optimized on stereo plane (earlier signal) as far as non-stereo kept away enough from upper bound (impact on Q ~ few % only) IN QA plots

● Zero Suppression off data for parameter adjustment? ● Zero Suppression off noise data for recap effect? Few minutes with clock trigger At various BBC rate circumstances Sample: ~500k MuID at a (optimized) Lv1 Ex. run328750

● Mutrg threshold scan (run12: elog 971) Sample: ~500k MuID per thresh., Mutrg: LOGIC=OR and AND2 in st0 Width=1 All OR: 10mv 20mv 30mv 40mv 50mv 60mv 80mv AND2 in St0 + Others OR: 10mv 20mv 30mv 40mv 50mv 70mv 90mv Main Targets Avoid This! Hit Timing Dist. (MuID cosmic sample) Large Baseline Contrigution: Threshold too low → provide non zero hit rate even at BBC=0

● Rate suppression has priority ● Chrg. Eff./Hit Rate → Constant as threshold goes infinite? ● Better plots will be from Minjung

● Rough GTM scan (run12: elog 939) Scan over 0, 20, 40, 60, 80, (100) [ns] Mutrg at optimized logic/thresholds Width=3 or Width=1 -> 3 offline Latency=32, trigdelay=10, (MRG reset) delay = 1(North), 2(South) No fiber! rdel_s cdel_s rdel_n cdel_n Delay[nsec] Check stability of LL1/GL1 efficiency After final timing adjustment with fiber (remember south behavior last year)

backup

Black: Lv1 Delay 7 Red: Lv1 Delay 6 Green: Lv1 Delay 8 ADC height ∝ ΔE Lv1 Delay (BCLK) MuTr/MuTrg GTM GL1 MuTr Latency (fixed)

Picked up #emu per 5k MuID (~100s) sample Survey its time development over run by segmenting data into 5k MuID samples

South Oct2 (0 origin) ● ~0.03Hz ave. → more less accidental rate of SG1_S & MuID (~0.05-6Hz) ● South Oct2 one of dominant source of SG1_S fire? ~0.03Hz ● Looks no obvious spikes