Village of Naples and Hazlitt 1852 Vineyards Sewer Feasibility Study.

Slides:



Advertisements
Similar presentations
Fayette County Wastewater Management Plan October 6, 2005.
Advertisements

Watershed Approaches and Community Based Planning
Wakulla County Sewer Project Eutaw Utilities Presentation April 7, 2011.
Lunenburg CWMP Phase II – Management Techniques and Alternatives Identification and Screening Lunenburg Comprehensive Wastewater Management Plan Workshop.
Berkeley Charleston Dorchester Water Quality Management (208) Program Vonie Gilreath, Regional Planner, BCDCOG Coastal Community Workshop February 7, 2006.
2010 PUBLIC INFORMATION MEETING MOVING OUR COMMUNITY FORWARD TOWARDS A SUSTAINABLE FUTURE.
Calaveras County Water District Capital R&R Program Funding Options March 25,
Floyd County Board of Commissioners Special Town Hall Meeting Topic: Update on status of Georgetown WWTP.
Cost Estimation System Tool
Wastewater Collection Options for Lakota Beach Area Sub-Basin Special Meeting June 27, 2001 John Bowman Lakehaven Utility District (253)
Article 41 Wastewater Planning Capacity Study To determine whether the Town will vote to adopt a resolution supporting the Town Manager’s allocation of.
Town of Plattsburgh Cumberland Head Sewer District Welcome To CUMBERLAND HEAD SEWER DISTRICT INFORMATIONAL MEETING JULY 2009.
1. The installations of grinder pumps and lines from residences on private property to M.D. collection lines is the final link in finishing a project.
Interfacing Initiatives Hometown Collaboration Initiative (HCI)  Expansion of leadership and civic engagement to capitalize on innovative strategies 
Project Bidding Procedures Enhancing Data and Presentation Skills for Engineers EDASPE Writing the RFP Training Courses – July 2004.
Enhancing Education Through Technology Round 9 Competitive.
Hide-A-Way Lake, Inc. Low Pressure Sewer System Prepared by Dungan Engineering, P.A.
Feasibility Study of Constructed Wetlands for Wastewater Treatment and Wildlife Habitat Luna County, NM Public Meeting November 10, :00 am Presented.
National Urban Waste Water Study (Covers catchments with a population equivalent of 2,000 or more outside the Greater Dublin Area) Department of the Environment,
Florida’s Water Management District Permitting Website – Phase II (Permitting Portal II)
Connecticut Department of Energy and Environmental Protection.
Effectively Managing Your Water System Project Rural Community Assistance Partnership Practical solutions for improving rural communities © 2012 All rights.
Money for Facility Projects of Any Size Presented By: Steve Craker – CESA 10 Preparing to ask for money -Planning, Planning, Planning!!!
Organization Mission Organizations That Use Evaluative Thinking Will Develop mission statements specific enough to provide a basis for goals and.
2015 Technical Assistance Funding Workshop 1/23/15.
Implementing the Municipal Separate Storm Sewer System Permit Stormwater Division General Services Department Board of Supervisors Work Session October.
System Planning- Preliminary investigation
WSNTG Annual Conference September 2006 Water Services National Training Group 10 th Annual Conference 7 th September 2006.
Water Supply Planning Initiative State Water Commission November 22, 2004.
Sunshine Coast Regional District Development Cost Charges July 3, 2014 Infrastructure Services Committee Bob Twerdoff.
ADOT Multimodal Planning Division Planning Assistance for Rural Areas (PARA) Program Overview December 4, 2013.
STATUS OF ECOLOGY’S DRAFT FLOW BLENDING POLICY WATER QUALITY PARTNERSHIP MEETING January 20, 2005.
1 Technical Assistance - PTAB Selecting and Hiring the Design Professional Dave Maxwell, P.E. Chairman, New Mexico Professional Technical Advisory Board.
Massachusetts Public Health Inspector Training Wastewater Certificate Program (MA PHIT WW) Session 2: Permits and Licenses.
Annexation 480 CHELSEA ROSE ANNEXATION PUBLIC INFORMATION MEETING AUGUST 11 TH, 2015.
BASICS IN IRRIGATION ENGINEERING 2.1. Planning Irrigation systems 2.2. soil-plant-water relation – over view 2.3. Crop water requirement 2.4. Base, delta.
Computers Are Your Future © 2008 Prentice Hall, Inc.
MORRIS MILL PROPOSED URBAN SERVICES DISTRICT Presentation to County Council September 17, 2013.
CDBG-CHIP Beginning to Write Your Application. Mission and Vision Statement Vision—every Georgia community offers a quality of life where people and businesses.
The SSMP Process 1. The Servicing and Settlement Master Plan A plan to encompass the community’s visions and ideas, while approaching planning and servicing.
2016 Technical Assistance Funding Workshop 10/14/15.
September 23, 2005 Local Hazardous Waste Management Program in King County Washington Program Funding.
Proposition 1 Workshop: the Grant Application Process July 2015.
Agenda  Review project scope and goals  Update project status  Review results of public surveys  Identification of capital projects  Draft capital.
Road Map to the Future: The Consolidation of Sewer Infrastructure in Rutherford County, NC November 16 th, 2015.
Ordinance Amending Chapter 37 Orange County Code Utilities Department October 21,
Coeur d’Alene Basin TLG Repository PFT meeting December 9, 2003.
Indian & Northern Affairs Canada March 10, 2010 On-Site Water and Wastewater Systems - First Nations Water Symposium Matthew Hough, P.Eng. Infrastructure.
A Software Engineering Model Based Curriculum Development Approach Leon Pan University of the Fraser Valley.
Planning Commission Study Session: Preferred Plan July 23, 2015.
HSM 220 MART Teaching Effectively/hsm220mart.com FOR MORE CLASSES VISIT
1 EASTERN MUNICIPAL WATER DISTRICT Cactus II Feeder Transmission Pipeline Joe Mouawad, PE Sr. Director of Engineering September 2, 2015.
Town of Enfield : Upgrading the Water Pollution Control Facility & Collection System Jay Sheehan, PE Michael Burns, PE.
1 | emwd.org MV 2060 Pressure Zone Potable Water Storage Tank and Transmission Pipeline Joe Mouawad April 6, 2016.
1 EASTERN MUNICIPAL WATER DISTRICT Quail Valley Sewer Improvements Sub-Area 9, Phase 1 Joe Mouawad, P.E. Sr. Director of Engineering October.
Strength through History & Innovation City of Beaumont Salt Mitigation Feasibility Study Summary of Findings.
Container Freight Station, Utilities and Drainage at Bayport Container Terminal (RFQ-148) Brenda Trevino, P.E. Project Manager October 11, 2016.
HOW TO WRITE PROJECT PROPOSAL – FORM AND STYLE
Quail Valley Subarea 9, Phase 1 Sewer Award of Construction Contracts
Case Road Sewer Joe Mouawad, P.E. October 27, 2016.
Management of Placement Area at Bayport Container Terminal (RFQ-147)
CITY OF MARSHALL CHLORIDE ISSUES September 26, 2017
Campus Locator – Definition Phase (May04-04)
CLINICAL INFORMATION SYSTEM
Article 41 Wastewater Planning Capacity Study
CITY OF MARSHALL CHLORIDE ISSUES NOVEMBER 22, 2016
Controlling Project Cost and Schedule
Environmental Requirements and planning grants
Village of Naples New Sanitary Sewer System Final System Layout
Dollars and Cents: Ways to Save and be More Resourceful
Presentation transcript:

Village of Naples and Hazlitt 1852 Vineyards Sewer Feasibility Study

Scope of Services The consultant will thoroughly evaluate the various collection systems for the Main Street area (including the school district properties) of the Village to determine the most appropriate collection system from both the short and long term installation/operation and maintenance cost perspective (including total lifecycle cost). The collection systems to be evaluated include: gravity/pump station, vacuum, STEP (septic tank effluent pump systems) and Environment One type grinder pump systems. Environment One and AirVac have both been contacted and will be providing a design and cost estimate utilizing their in-house software. Other appropriate systems may be evaluated and combinations of these systems may be evaluated to fit the needs of this area of the Village. In addition, the collection system must allow for future expansion into other areas of the Village.

Gravity Sewer/Pump Station

Septic Tank Effluent Pump System

Environment One- Grinder Pump Systems

Vacuum Type Systems

Scope of Services Cont. The consultant will also further refine the ultimate land area and parcels encompassing the collection system district (see cover page for approximate boundary) using the available LiDAR and raw survey data owned by the Village. Parcels and land area will be included based on the ease and cost of accessing the collection system, potential economic benefit to the community and cost effectively reaching the 50% residential user threshold for USDA, CDBG and EFC funding. The Village has water use figures for all parcels within the possible collection system district as well as other areas of the village where future expansion of the collection system may be considered.

Scope of Services Cont. The consultant will provide a plan map for the most appropriate route of the collection system. The consultant will utilize LiDAR, the raw survey data (owned by the Village) aerial images and field investigation to determine the most appropriate collection system routes for both sides of Main Street and the overall collection district. Back lots, side streets, Main Street and Main Street ROW are all viable options for the consultant to consider. The consultant will be expected to spend time in the field to assist in determining the most appropriate route for installing the collection system. The consultant will also be able to make a recommendation on whether trenchless pipe installation will work in the predominately gravelly soils of the Village. Steering Committee members will help facilitate these field visits.

Scope of Services Cont. The consultant will itemize both capital and O&M costs for the collection system alternatives and include an example rate structure for each system. The Engineering Report must also meet the requirements of the EFC/DEC CWSRF Engineering Planning Grant (see attachment), 10 States Standards and all other requirements to be considered an eligible community on the New York State Intended Use Plan list.

Scope of Services Cont. There will be a written evaluation of the Hazlitt Wastewater Treatment Plant by Tim McWilliams (Hazlitt Wastewater operator) and Bill Smith P.E., retired engineer. The report will review the plant’s capacity, SPDES permit requirements and ability to accept wastewater from the Village along with possible upgrades that will need to be factored into a reserve fund for the plant. The consultant will review this evaluation report and identify any issues or information gaps that need to be addressed in this evaluation in order to verify that the plant can handle these additional flows both from a quantity and quality perspective.

Scope of Services Cont. The consultant can expect to participate in (3) three public meetings and (6) six working sessions with the Steering Committee. Any meetings will require the consultant to provide visual presentations, photographs and drawings. The consultant should explain their approach to the public and the Village Board in order to receive feedback and build public support for the project.

Scope of Services Cont. The consultant will ask for all information that the Village and its partners might have to reduce the cost of the project and provide a more detailed final product. The project partners have a wide array of GIS resources including parcel data and maps, 2 foot LiDAR contours, aerial images, soils, and many other data sets. The Village also has water records, septic system information, and local knowledge of the area.

Scope of Services Cont. The consultant will also describe the next steps to move to final design and describe all the necessary information that will be needed to move to final design and installation, e.g., soil borings, cultural resources surveys, environmental review, etc… The Steering Committee and Village Board will be utilizing the Guide to Developing a Municipal Wastewater Project for small rural communities in NYS (2007) and the selected consultant should refer to this document as it goes through the design process and determines the next steps. The consultant will provide seven bound hard copies of the report and map plan and one digital copy of the report in.pdf format

Potential Sewer Collection Area South end (Grimes Creek)

Core Business Area

Mill St. to Dumond St.

Academy Street Area

Academy to Tobey St. and Hazlitt Winery

Main Street and Rt. 245

Comparative Sewer Rates

Evaluation Factors and Timeframe Major scoring items that the Village will incorporate include: similar projects/related work, experience of personnel, amount of work done in NYS, reputation and quality of work previously performed, experience of project team, proposal evaluation with an emphasis on the technical plan, interview and cost estimate. Anticipated cost should not exceed $20,000 The goal is to have the RFP complete by September 15, 2012 and receive proposals by October 10, The next phase would be to select the engineer, with the study start date of November 1, 2012 and be complete by May 1, 2013.