Thomas Carr Western Interstate Energy Board ColumbiaGrid Planning Meeting August 1, 2013 Grid Tracker: A web-based tool to analyze historic transmission.

Slides:



Advertisements
Similar presentations
WECC/TEPPC Response to DOE Funding Opportunity Status Update June 29, 2009 Bradley Nickell Renewable Integration and Planning Director.
Advertisements

2007 Goals. Introduction Western Electricity Coordinating Council (WECC) will be primarily defined throughout the 2007 year by Electric Reliability.
1 ColumbiaGrid Update June 27, Activities Planning OASIS Redispatch 2.
WGA West-wide Renewable Energy Zone (WREZ) Project.
1 Bradley Nickell Director of Transmission Planning 10-Year Regional Transmission Plan WECC Overview September 2011.
Reliability Subcommittee Report Vishal C. Patel Chair – Reliability Subcommittee March 2014.
Liaison Report CREPC Liaison Report Lou Ann Westerfield Idaho Public Utility Commission Market Interface Committee March 6-7, 2008.
Study Results Southwest Firmed Resource Option This slide deck contains results from the 2012 TEPPC Study Program related to the Southwest Firmed Resource.
March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
GPA Renewable Energy Resource for Guam Power Authority
Technical Conference Avoided Cost Modeling January 6, 2015.
Ad Hoc West-wide Resource Assessment Team (WRAT) : Assessment of Western System Adequacy in the Short-term Jeff King Northwest Power Planning Council Presentation.
Montana Energy Summit Transmission Planning Process April 22, 2008.
Michael Bailey, PE Energy Planning & Policy Analyst LTPT Update to EDTF January 23, 2015 WECC Webinar.
Arizona Corporation Commission 2010 Biennial Transmission Assessment Workshop June 3 & 4, 2010 Brian K. Keel Manager, Transmission System Planning Salt.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
Preliminary Analysis of the SEE Future Infrastructure Development Plan and REM Benefits.
WGG Coal Retirement Case Transmission Repurposed for Renewables.
1. PROJECT GOAL Our final product will be an interactive public website which will allow the user to view various aspects of our current and future infrastructure.
Long Term Study Task Force Update to ETWG ERCOT Long-Term Study: Scenarios, New Software, and Emerging Technology Assumptions January 27, 2012.
Study Results Drought Scenario Study This slide deck contains results from the 2011 TEPPC Study Program. This study shows the impact in the interconection.
Debra Lew NREL WestConnect Planning Meeting Western Wind and Solar Integration Study Update.
Lynn Coles, PE National Wind Technology Center National Renewable Energy Laboratory Golden, Colorado USA 10 FAQ’s (Frequently Asked Questions) About Wind.
Western Wind Integration Study Kevin Porter – Exeter Associates, Inc. Brian Parsons, Michael Milligan, Debbie Lew – NREL DOE Wind Program Peer Review July.
Approach to the Wind Resource Assessment for the Sixth Power Plan Northwest Power & Conservation Council Generating Resources Advisory Committee August.
2013 Calendar Year Customer Survey Results
Western Wind Integration Study Debbie Lew NREL. Goal To support multi-state interests in understanding the operating and cost impacts due to the variability.
Past Studies and Resource Diversity Western Renewable Energy Zones, a joint initiative of the Western Governor’s Association and the U.S. Department.
1 Bradley Nickell Director of Transmission Planning Incorporation of Water in Transmission Planning April 2, 2013.
Successful Transmission Planning & Development in the West Kelly Barr Manager, Regulatory Affairs & Contracts Salt River Project Phoenix, Arizona June.
WestConnect Activities Charles Reinhold WestConnect Project Manager 2008 ACC BTA Workshop Phoenix, AZ May 22, 2008.
Capacity Forecast Report Sean Chang Market Analysis and Design Suresh Pabbisetty CQF, ERP, CSQA Credit CWG/MCWG September 16, 2015 ERCOT Public.
Net Metering Technical Conference Docket No PacifiCorp Avoided Costs October 21, 2008 Presented by Becky Wilson Executive Staff Director Utah.
Net Metering and Embedded Generation NB Climate Action Change Hub Advisory Committee Meeting – October 1, 2008 Saint John, NB Linda Berthelot.
Icfi.com © 2006 ICF International. All rights reserved. Wyoming Collector and Transmission System Project – Status Report Presented to: Wyoming Infrastructure.
Western Renewable Energy Zone Project October 29, 2009 John Savage Oregon Public Utility Commission.
Study Results High EE/DG/DR Study This slide deck contains results from the 2011 TEPPC Study Program. This study shows the results of an increase of EE/DG/DR.
Hydropower Vision Team May Advisor: James McCalley Members: ● Alex Tillema - Team Leader ● Nicholas Jones - Communication Leader ● Kyle Kraus - Key.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
Western Renewable Energy Zone (WREZ) Concept (as of 11/27/07)
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
Peter Larsen and J.P. Carvallo Lawrence Berkeley National Laboratory Data Working Group ■ August 4, 2015.
HMTF Update TAS Nov 3-4, 2015 Kevin Harris, ColumbiaGrid TEPPC\Hydro Modeling Work Group - Chair.
TEPPC Meeting May 6-7, 2015 Salt Lake City, UT Thomas Carr Western Interstate Energy Board State-Provincial Steering Committee Update.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
Analysis of Demand Response Modeling in GridView Andy Satchwell and Sarah Smith Modeling Work Group December 21, 2015 The work described in this presentation.
ERCOT TAC11/2/ CREZ Study Update ERCOT TAC 11/2/2006.
Northwest Wind Integration Forum Technical Work Group Meeting October 29, 2009.
Resource Analysis. Objectives of Resource Assessment Discussion The subject of the second part of the analysis is to dig more deeply into some of the.
NW Loss of Load Probability James Gall Power Supply Analyst
Role Of ERC in the WESM To enforce the rules and regulations governing the operations of the WESM and monitors the activities of the Market Operator and.
Long Term Transmission Integration Planning at the California ISO Intermittency Analysis Project (IAP) Energy Commission Staff Workshop February 13, 2007.
Capacity Forecast Report Fall Update Sean Chang Market Analysis and Design Suresh Pabbisetty CQF, ERP, CSQA Credit CWG/MCWG December 16, 2015 ERCOT Public.
RFPEG2013 PRE-BID MEETING RFPEG2013 – Pre-Bid meeting January 9, 2014 Presentation by Derek Davis – Public Utilities Commission.
Renewable Energy Transmission Initiative 2.0 Plenary Group Meeting April 18, 2016 Sacramento, CA Thomas Carr Western Interstate Energy Board TEPPC’s Resource.
Regional Transmission Expansion Project Staff Council Briefing Tom Kaiserski (MT) Program Manager February 15, 2011 Governor’s Office of Economic Development.
CREPC/WIRAB Meeting April 27, 2016 Salt Lake City, UT Thomas Carr Western Interstate Energy Board Evolution of Grid Planning in the West.
Northern Tier Transmission Group Report to Columbia Grid Planning Committee February 9, 2012 “To ensure efficient, effective, coordinated use & expansion.
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
Nader Samaan Xinda Ke Pacific Northwest National Laboratory (PNNL)
TAS Quarterly Meeting November 2-3, 2016 Michael Bailey, P.E. WECC
SPSG Meeting August 17, 2016 Salt Lake City, UT
Planning Tools Overview
BPA Overview BPA is part of the U.S. DOE, but it is self-funded and covers all of its costs by selling products and services. Congress created BPA in 1937.
TAS Quarterly Meeting November 2-3, 2016 Michael Bailey, P.E. WECC
WREZ Model Demonstration: Pacific Northwest
Planning Tools Overview
Nader Samaan Xinda Ke Pacific Northwest National Laboratory (PNNL)
TEPPC Meeting May 6-7, 2015 Salt Lake City, UT
Study Results Drought Scenario Study
Presentation transcript:

Thomas Carr Western Interstate Energy Board ColumbiaGrid Planning Meeting August 1, 2013 Grid Tracker: A web-based tool to analyze historic transmission flows over paths in the Western Interconnection

Agenda 1.Purpose and background of Grid Tracker 2.About Grid Tracker 1.Database information 2.Types of analysis 3.User assistance mechanisms 3.Interesting Findings 2

Purpose and Background of Grid Tracker 3

Purpose: Develop an internet-based tool that allows users to understand historical use of the transmission grid and identify opportunities to improve grid efficiency. 4

Functions and Uses of Grid Tracker Search and analyze trends in power flow, Available Transfer Capacity (ATC), and schedules for transmission paths in the Western Interconnection, and display results in a graphical format Incorporate data on hydro flow and renewable energy zones to analyze correlations between resources and grid utilization Identify where there is under-utilized transmission capacity Inform decisions on locating new generation without new lines Explore whether the current open access transmission system leads to an efficient use of the grid 5

Background on the Project April 4, 2012 – SPSC approved project funding ($50K) at San Diego meeting Dec. 5, 2012 – RFP issued Feb – SPSC’s Evaluation Committee selected Atkins North America, Inc. as contractor to build the tool from pool of 7 bidders Dean Perry hired for technical support to WIEB Feb. to March – 8 meetings with Atkins, WIEB staff, Dean Perry, and WECC staff to build Grid Tracker prototype April 4 – Pre-meeting webinar for Grid Tracker April 10 – Demonstration at SPSC/CREPC meeting in Boise; SPSC approved of $25K for public outreach and education June 14 – Final product delivered; Grid Tracker fully deployed August – September – Public outreach and education 6

About Grid Tracker 7

Database Information Within Grid Tracker WECC Transmission Paths: All available historical Western Electricity Coordinating Council (WECC) Path power flow, Operating Transfer Capacity (OTC), schedule and ATC data from Intend to update over time with new data years for WECC Path power flow and OTC data Hydro Power: Historical Columbia River hydro discharge data at The Dalles, Oregon Representative of hydro generation potential in the Northwest 8 Renewable Energy: Power generation data from a variety of proxy renewable energy plants (wind, solar, biomass, and geothermal) Based on WECC’s Transmission Expansion Planning Policy Committee (TEPPC) 2022 Common Case Proxy plants are located within the Western Governors’ Association and U.S. DOE’s Western Renewable Energy Zone Initiative Hubs

9 Interesting Findings shows recent analyses, give interpretations of results, and show you how to build the analysis. Basic Analysis allows you to select from a suite of standard analyses. Web-based You can open and run the Grid Tracker in all of the major web browsers. Advanced Analysis Allows you to create complex custom analyses. Map-based: The map presents the various power datasets and allows you to select which data you’d like to analyze

10 1.Click on any Path, Hydro discharge point, or WREZ Hub on the map. 2.Select a time series from the pop-up. 3.Click chart to view the data. 4.Download the data for analysis in excel. Point and Click Data Access

The Data Analysis Tree Allows for building custom analyses in the Advanced Analysis Tab. Incorporates data from the various databases as input nodes in a link-node network. Adds nodes from the tool box to conduct analysis on the data 11

Types of Analysis Basic Time Series Analysis Statistics (Mean, Min, Max, 90 th /95 th /99 th Percentile, St. Dev) Hourly Statistics – statistic for each hour of the day Aggregating Time Series (hourly, daily, seasonal, hydro year) Grid Capacity Analysis Calculation of maximum FIRM and NonFIRM ATC Calculation of Unused/Unscheduled Capacity Combining multiple Paths in series or in parallel Statistical Analysis Probability curves Correlation Simulation Simulates proxy plant power generation with adequate transmission capacity Allows the user to adjust the output of the proxy power plant 12

User assistance mechanisms Pop-ups to explain terms and particular functions Warnings if an analysis cannot be done because there are gaps in the data Step-by-step instructions on how the interesting findings case study results were created Allows the user to upload additional data for analysis 13

Interesting Findings 14

Northwest hydro in comparison to Montana power flow Using multiple years of data, there is a Pearson correlation coefficient between the two daily time series, indicating a strong inverse correlation. 15 Columbia River discharge vs. Path 8 (Montana to Northwest) power flow

16 Moving power from Arizona to California The clear bottleneck in transmitting power to California is Path 49 (east of the Colorado River), which has significantly less unused transmission capacity than Path 46 (west of the Colorado River). Unused transmission capacity is either the calculated unused/unscheduled capacity or the calculated maximum of FIRM and NonFIRM ATC.

17 Path 49 (east of Colorado River) unused transmission capacity Path 46 (west of Colorado River) unused transmission capacity Moving power from Arizona to California

18 Moving power from Arizona to California 95% of the time, the level of unused transmission capacity stays fairly constant at approximately megawatts (MW) the entire day. The only exception is the last hour in the day, 11 pm – midnight, when the value drops to approximately 120 MW.

19 Paths 46/49 unused transmission capacity, minimum hourly Paths 46/49 unused transmission capacity, average hourly Paths 46/49 unused transmission capacity, maximum hourly Paths 46/49 unused transmission capacity, 95 th percentile Moving power from Arizona to California

Sizing a solar energy project 83% of the time in the analysis year (2008), there is adequate transmission capacity for 360 MW from a415 MW proxy plant in Western Arizona to serve the California market via Paths 46 and 49 ; the remaining 17% of the time, there may or may not be adequate transmission capacity. 20

21 83% of the time in the analysis year, there is adequate transmission capacity for 360 MW from the proxy plant. Paths 46/49 unused transmission capacity probability curve AZ_WE Hub proxy solar plant power generation probability curve Sizing a solar energy project

The statistics for the proxy plant generation in comparison to the statistics for the Path 46/49 unused transmission capacity indicate transmission capacity sufficiency. 22

23 Paths 46/49 unused transmission capacity, minimum hourly Paths 46/49 unused transmission capacity, average hourly Paths 46/49 unused transmission capacity, maximum hourly Paths 46/49 unused transmission capacity, 95 th percentile AZ_WE Hub proxy solar plant generation, minimum hourly AZ_WE Hub proxy solar plant generation, average hourly AZ_WE Hub proxy solar plant generation, maximum hourly AZ_WE Hub proxy solar plant generation, 95 th percentile Sizing a solar energy project

The power generation and transmission simulator, which simulates the correlation between power generation and transmission on an hourly basis, shows that at the proxy plant’s current size (415 MW), there is adequate transmission capacity for 97% of the plant’s generation in the analysis year. If the plant’s capacity is increased to 6,500 MW, there is adequate transmission capacity for 15% of the plant’s generation in the analysis year. 24

25 As the plant capacity increases, adequate transmission capacity decreases. If the plant’s capacity is increased to 6,500 MW, there is adequate transmission capacity for 15% of the plant’s generation in the analysis year. At the proxy plant’s current size (415 MW), there is adequate transmission capacity for 97% of the plant’s generation in the analysis year. % Plant generation transmitted vs. plant capacity Sizing a solar energy project

Contact Information Grid Tracker website: Please send questions/comments to: Tom Carr, WIEB (303) x3 Suzanne Leta Liou, Atkins (503)