17-18 December 2013 LARP VTF Workshop BNL Proposal 1 A.Marone 12-12-13.

Slides:



Advertisements
Similar presentations
February 17-18, 2010 R&D ERL Roberto Than R&D ERL Cryogenics Roberto Than February 17-18, 2010 CRYOGENICS.
Advertisements

EXPERIENCE FROM KEK Norihito Ohuchi 2009/11/9-101 Workshop on cryogenic and vacuum sectorisations of the SPL.
1 Preparation for MQXF Short Model Tests G. Chlachidze Fermilab.
Raffael‘s Sixtinische Madonna in der Galerie Alte Meister in Dresden.
Current status Arkadiy Klebaner November 21, 2012
Engineering and Design Group Fermi National Accelerator Laboratory Cryogenic Department AAC Review, May , 2005 Jay Theilacker HPTFCRYOGENICS.
CASIPP Design of Cryogenic Distribution System for CFETR CS model coil Division of Cryogenic Engineering and Technical Institute of Plasma Physics Chinese.
LHC Experimental Areas Forum - 03/07/ ATLAS Helium Cryogenics Nicolas Delruelle on behalf of the AT / ECR group.
Large-capacity Helium refrigeration : from state-of-the-art towards FCC reference solutions Francois Millet – March 2015.
Cryogenic cavern in Asian site Conceptual design of the cryogenic system Layout of the cryogenic plant for site A & B New layout of the cryogenic system.
Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Page 1.
LARP LQX and MQX Magnets Cryogenic Testing at Fermilab’s Industrial Building 1 Roger Rabehl Technical Division/Test & Instrumentation Department.
SOFT 2004 OVERVIEW OF CRYOGENIC TECHNOLOGY FOR THE THERMONUCLEAR FUSION P. DAUGUET, M. BONNETON, P. BRIEND, F. DELCAYRE, B. HILBERT, A. RAVEX Air Liquide.
Conceptual Design Study - Cryogenic Requirements How to decide the layout of ILC cryogenic system Conceptual design of cryogenic system Layout of cryogenic.
24 January 2014 LARP VTF Follow-up Meeting P. Kovach VTF 1 LARP Vertical Test Facility Vertical Dewar Design, Magnet Prep And Installation Paul Kovach.
April, 2009 ERL SRF CRYO MODULES AND CRYOGENIC SYSTEM.
IHEP 1.3 GHz Cryomodule and Cryogenics IHEP Cryogenic group 2nd Workshop of the IHEP 1.3 GHz SRF R&D Project Dec 2 nd, 2009.
Cryo AIP Muon Campus AIP Review Arkadiy Klebaner January 23, 2012.
Arnaud Vande Craen (TE-MSC) 27/02/20131 EUCARD : ESAC Review – CEA Saclay.
Cryogenic update before Fermilab meeting (and after the helium tank review) Coordination meeting 6 th May 2015 K. Brodzinski HiLumi-LHC-CC-Cryo-PPT-18_v1.
Preliminary Design for the Coupling Coil Cryostat in MICE
April 19, 2006A.Klebaner Cryogenics for ILC TA Current Status Plans and issues.
Project X RD&D Plan Cryogenics Arkadiy Klebaner AAC Meeting February 3, 2009.
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
G-2 Cryogenic System Restoration of G-2 Refrigerator for Proposed E969 Experiment WBS 1.11 Tony Nicoletti 2/8/06.
1 Small Coolers for MICE Michael A. Green University of Oxford Department of Physics Oxford OX1 3RH, UK MICE Collaboration Meeting RAL.
CRYOGENICS FOR MLC Cryogenic Principle of the Module Eric Smith External Review of MLC October 03, October 2012Cryogenics for MLC1.
Heat loads and cryogenics L.Tavian, D. Delikaris CERN, Cryogenics Group, Technology Department Accelerators & Technology Sector Friday, October 15, 20101HE-LHC'10.
MAGNET#1MAGNET#2MAGNET#3 SATELLITE VB#1 SATELLITE VB#2 SATELLITE VB#3 PRECOOLER#1PRECOOLER#2 DISTRIBUTION VALVE BOX DVB CP#1CP#3CP#2 BUFFER DEWAR LHe 5m.
RESEARCH AND DEVELOPMENT FOR FUTURE LHC SUPERCONDUCTING MAGNETS POINT SUR LA STATION D’ESSAIS préparé par Jean-Marc Gheller Steering committee –September.
PIP-II Cryogenics Arkadiy Klebaner and Jay Theilacker PIP-II Collaboration Meeting 9 November 2015.
1 BNL LHC Hi-Lumi QXF Vertical Test Facility Status Update M. Anerella, H. Hocker, P. Joshi, P. Kovach, A. Marone March 28, 2016.
NML Cryogenic System Arkadiy Klebaner Cryomodule One Commissioning June 3, 2011.
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
PXIE Cryogenics Concept Arkadiy Klebaner Session 5 / WG1 (CW Linac and PXIE) October 26 th, 2011.
1 BNL LHC Hi-Lumi QXF Vertical Test Facility Status Update M. Anerella, H. Hocker, P. Joshi, P. Kovach, A. Marone September 25, 2015.
Project X Workshop - Cryogenics1 Project X CRYOGENICS Arkadiy Klebaner.
BNL MAGNET TEST FACILITY FOR MQXF Q1/Q3
1 Young-Ju Lee Vacuum & Cryogenic Engineering Team National Fusion Research Institute Young-Ju Lee Vacuum & Cryogenic Engineering Team National Fusion.
TDR Cryogenics Parameters Tom Peterson 28 September 2011.
ESS | Helium Distribution | | Torsten Koettig Linac – Helium distribution 1.
Final Design Cryogenic and mechanical configurations
LCLS-II Technical Requirements
ILC Cryogenics: Study of Emergency Action and Recovery - in progress -
Mike Anerella December 17, 2013
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
FRIB Cryogenic Support
Cryogenic behavior of the cryogenic system
HFM Test Station Main Cryostat
Cryoplant Installation Scope
N. Hasan1, P. Knudsen2 and V. Ganni2
LARP Vertical Test Facility
Hongyu Bai LCLS-II 2 K Cold Box FDR March 9, 2017
Small Coolers for MICE MICE Collaboration Meeting RAL Michael A. Green
CEPC Cryogenic System Jianqin Zhang, Shaopeng Li
ESS Target Cryogenic System European Cryogenic Days CERN
Cryostat design Mechanical design: Thermal screens: Specifications:
SHMS Cryogenics and Q2(Q3Dipole) Cool Down
Operation experience of cryogenic system and cryomodules for the superconducting linear accelerator at IUAC, New Delhi. T S Datta ( On behalf of Cryogenics.
FRESCA Cryostats Outer cryostat during pressure test at the manufacturer Top plate and lambda plate for the outer cryostat Inner cryostat during reception.
Cryo-ops 2018,Beijing,IHEP
ILC Experimental Hall Cryogenics An Overview
ESR 2 Presented to Joint Hall A/C Summer Meeting
SNS Cryoplant Commissioning Past Experiences
CTF Users’ Perspective
Cryogenic behavior of the magnet
ESR2 Process Cycle Design
Conceptual design of the Cryogenic System of Comprehensive Research Facility for Key Fusion Reactor Core Systems Liangbing Hu Sep.4.
ESR2 Process Cycle Design
Presentation transcript:

17-18 December 2013 LARP VTF Workshop BNL Proposal 1 A.Marone

 Existing cryogenic components to be used.  He recovery equipment.  System description.  1.9 K heat load summary.

17-18 December 2013 LARP VTF Workshop BNL Proposal 3 Existing Cryogenic Equipment 1.CTI Model 4000 helium refrigerator. —Capable of producing 320 Liters/hr of liquid helium in conjunction with the wet expander. 2.Koch Model 1600 wet expander. 3.Mycom 800hp. 2 stage helium compressor ACFM vacuum pump (2 stage) K Service Cryostat. —(Designed for ILC 100W heat load through 10M transfer line.) 6.10,000 L liquid He storage dewar mm dia, Vertical test dewar (6.1m long).

BNL MAGNET TEST FACILITY 4 CTI MODEL 4000 REFRIGERATOR/LIQUEFIER Primary source of liquefaction 1500 W at 4.5K Two reciprocating expansion engines rated at 250 rpm. He liquefaction: 320 L/hr (with both expansion engines and a Koch Model 1600 Wet Expander) Recently upgraded with a new LiN 2 heat exchanger and diagnostics for expanders BNL CRYOGENICS SYSTEM

BNL MAGNET TEST FACILITY 5 BNL CRYOGENICS SYSTEM Koch Model 1600 Wet Expander Largest in world Has two cylinders 7.6 cm bore; 5.1 cm stroke 60 rpm Low maintenance

BNL MAGNET TEST FACILITY 6 Nash- Kinema Vacuum Pump 2 stage (100hp each) 2.7 bar (1.8K)

17-18 December 2013 LARP VTF Workshop BNL Proposal 7 He Recovery Equipment 1.Brand new Revelle Model 5236 helium compressor. —150 inlet. 2.Brand new Linde Model 500 helium purifier. 3.Brand new Bauer 50hp high pressure compressor.

17-18 December 2013 LARP VTF Workshop BNL Proposal 8 System Description 1.The refrigerator (along with the Mycom compressor and the wet expander) will be used to supply the test dewar and service cryostat with 4.5 K liquid helium. 2.The 1.8 K heat exchanger is contained in the service cryostat, this is connected to the test dewar by a 6 meter long transfer line. 3.The vacuum pump is connected to the service cryostat to provide a 2.7g/s bar. (1.8 K).

17-18 December 2013 LARP VTF Workshop BNL Proposal K Heat Load Summary (Service cryostat) 1.Existing instrumentation wires… 1.37 W 2.Instrumentation wire tube W K Vacuum tube….135 W 4.Existing superconducting leads….034 W 5.Hanging straps….008 W 6.Level probe leads & tube…..28 W Estimated Heat Load… W All 1.9 K surfaces have a 4.5 K heat shield Radiation heat is negligible. Internal 1.5 sq. meter heat exchanger 50w temp. rise 1.8K

17-18 December 2013 LARP VTF Workshop BNL Proposal K Heat Loads (Transfer line & Dewar) 1.Transfer line supports…..042 W 2.Instrumentation wires —(376) 28ga. and (8) 18ga…..664 W 3.Superconductors through lambda plate…..136 W 4.Lambda plate… 1.39 W 5.1.9K vessel ring… 2.38 W 6.Relief valve….541 W 7.1.9K transfer line termination….222 W 8.Magnet hanging clevis….098 W 9.Fill lines….003 W 10.Splice resistance (powered only)… W Estimated Heat Load… W (S.S) 7.326W (powered)

17-18 December 2013 LARP VTF Workshop BNL Proposal 11 Transfer Line Temperature Rise Using the method demonstrated in LHC Project Report 125 (Superfluid Helium As A Technical Coolant) the temperature rise (above 1.8K) through the transfer line was calculated. 1.For a 10W heat load at the dewar the temp. rise would be <.003K 2.For a 40W heat load at the dewar the temp. rise would be.16K

17-18 December 2013 LARP VTF Workshop BNL Proposal 12 Summary The total estimated heat load to 1.9K 1.97W W = Watts (steady state) Watts (dynamic) This is well within the capacity of our existing equipment which would be about 40 Watts.

17-18 December 2013 LARP VTF Workshop BNL Proposal 13 S.C. Instrumentation Wires

17-18 December 2013 LARP VTF Workshop BNL Proposal 14 S.C. Vacuum Tube & Existing Leads

17-18 December 2013 LARP VTF Workshop BNL Proposal 15 Transfer Line Supports

17-18 December 2013 LARP VTF Workshop BNL Proposal 16 Instrumentation & Containment Ring

17-18 December 2013 LARP VTF Workshop BNL Proposal 17 Lambda Plate

17-18 December 2013 LARP VTF Workshop BNL Proposal 18 Relief Valve

17-18 December 2013 LARP VTF Workshop BNL Proposal 19 Relief Valve cont’

17-18 December 2013 LARP VTF Workshop BNL Proposal 20 Superconductor Through Lambda Plate

17-18 December 2013 LARP VTF Workshop BNL Proposal K Transfer Line Termination

17-18 December 2013 LARP VTF Workshop BNL Proposal 22 Hanging Clevis

17-18 December 2013 LARP VTF Workshop BNL Proposal 23 Transfer Line Temp. Drop

17-18 December 2013 LARP VTF Workshop BNL Proposal 24 Transfer Line Temp. Drop (con’t)