UnionPay Card Manufacturer Certification Introduction.

Slides:



Advertisements
Similar presentations
What it takes to sign your contract Heather Kelley Contracts & Administrative Services Manager.
Advertisements

Institutional Animal Care and Use Committee (IACUC)
Training Presentation E-Learning Test Request. Objective Provide Test Center staff members with information about the e-learning test request process.
U.S. Pretrial Services and Probation Office Northern District of Ohio.
PROCURING LOCALLY GROWN PRODUCE. Why Choose Locally Grown  Freshness  Holds longer in storage  Shipping costs may be lower  It can help your community.
Treasurer’s Meeting Business Services Kyle Bowman, Business Services Manager.
COMPLYING WITH HIPAA PRIVACY RULES Presented by: Larry Grudzien, Attorney at Law.
Our Vision – Healthier Kansans living in safe and sustainable environments.
“MED P ROGRAMME ” Z ERO C O (2) Z ERO EMISSION CO MMUNITIES F INANCIAL MANAGEMENT SYSTEM K ICK O FF M EETING J UNE 17° 18° 2010.
1 The 2 nd Annual Client Conference October 16 th & 17 th, 2006 Welcome to the Network “Credentialing” Leona Roach, CPMSM, CPCS.
Lecture 8. Quality Assurance/Quality Control The Islamic University of Gaza- Environmental Engineering Department Environmental Measurements (EENV 4244)
School Safety Training
Division of Child Care STARS Interim Report. What is an interim report? Programs participating in the STARS for KIDS NOW program must demonstrate continued.
Quality Assurance/Quality Control Policy
D. Keane June Internal Quality Audits (4.14) -ISO Requirements for Internal Audits -The Audit Process -Templates for Meeting Requirements.
HOLMES BEACH PROPERTY MANAGEMENT, LLC MANAGEMENT PLAN INDEX I. Administration of the Association A. Officers and Responsibilities B. Meeting Schedules.
Attention Promoting Instructors Important Kukkiwon Promotion Information The Dan office at USA Taekwondo provides a direct link between the United States.
Self-Certification under ASEAN Trade in Goods Agreement (ATIGA)
United States Army Combined Arms Center Army Training Support Center Training Service Support Contract TITLE Task Order Kick-Off Information Briefing DAY,
Visit us at usacac.army.mil AMERICA’S ARMY OUR PROFESSION – STAND STRONG 1 U.S. Army Combined Arms Center Training United States Army Combined Arms Center.
BRIEFING on e-TESDA UTPRAS for TVET PROVIDERS
1 Begin the E Signature Process Here. 2 OPTION 1: Send a secure to the Insured to E-Sign and Pay Online This is a copy of the your Insured.
Financial Matters Ron Ferrill, District Treasurer 2011 PETS.
STUDENT FEDERAL WORK-STUDY ORIENTATION.
STUDENT ASSOCIATION BUDGET WORKSHOP Please sign in at the front of the room.
1 Module 4: Post-Award Administration of Sponsored Projects (Part 1) Office of Research and Sponsored Programs The University of Mississippi 100 Barr Hall.
Tier 4 Visa Maintenance Requirements
PUBLIC PROCUREMENT OPERATIONS Dr. Fred Mugambi Mwirigi JKUAT 1.
INTRODUCTION TO AUDITING
Procedures and Forms 2008 FRCC Compliance Workshop April 8-9, 2008.
MABS Learning Centers and Standard Toolkit for Bank Hosting Activities MABS Learning Centers Training Workshop.
® © 2009 Open Geospatial Consortium, Inc. Starting an Interoperability Experiment David Arctur, OGC Director, Interoperability Programs December 8, 2009.
General Condition THE EMPLOYER Construction Law Supervised By : Dr. Kamalain Shaath Prepared By : Eng. Fawzy El.farra.
Contract Training Class I
Preseason Coaches Meeting. When faced with a question or concern regarding NCAA rules and regulations, the following process should be followed: Step.
1 MANDATORY OUTPATIENT TREATMENT Jane D. Hickey Office of the Attorney General June 5, 2008.
Financial reporting Linda Wormö, MA Per Dahlström, MA 1st October,2015 Kuopio, Finland.
Mandatory Outpatient Treatment Following Involuntary Inpatient Admission Allyson K. Tysinger Office of the Attorney General May 2010.
 Definition of a quality Audit  Types of audit  Qualifications of quality auditors  The audit process.
VETERANS BENEFITS ADMINISTRATION Compliance Surveys October 6, 2015.
San Marino Unified School District Contracts Presentation Presented by: Wesley Lee, Budget Analyst October 28, 2015.
Compliance Monitoring and Enforcement Audit Program - The Audit Process.
Chartered Club Officer’s Meeting THURSDAY, MARCH 19, 2015.
organization – status 2015 – scheme – integrity program – strategy
PY 2005 Grant Officer Overview U.S. Department of Labor Employment and Training Administration Office of Grant and Contracts Management.
OBSERVAL CONTRACT 25/01/2008 2/10/ Summary 2/10/ Agreement & its annexes First pre-financing payment Progress report 2 nd pre-financing payment.
CABLING SYSTEM WARRANTY REGISTRATION. PURPOSE OF CABLING REGISTRATION.
Office of Research & Development (ORD) Local Accountability of Research 2009 Baltimore, Maryland January 13-14, 2009 “Meeting the Current Challenges of.
(A) LIFE INSURANCE : Term Life Insurance Permanent Life Insurance (B) GENERAL INSURANCE Fire Insurance Marine Insurance Accident Insurance (C) HEALTH.
Thank you for your interest in establishing a new Scarlet & Gold Event Committee in your region to raise funds to support the Marine Corps Scholarship.
May 5, 2016 May 5, Reporting obligations for  Investment banks,  Stockbrokers and dealers  FM and Investment advisers 2. Publication financial.
Contract Compliance Training. Department Personnel Office of the General Counsel (OGC) Mario K. Castillo General Counsel John Guest Deputy General Counsel.
ITRI Industrial Technology Research Institute The Audit Process of Medical Device GMP for Domestic Manufacturers DOH Designated Auditing Organizations.
Inspection & Test Plan (ITP) / Manufacturing Process Quality Plan (MPQP) - training of suppliers to FMC Technologies, Norway QRL FMC Standard.
Consumer.vic.gov.au Becoming an incorporated association.
Cooling Tower Audit Nathan Maple City of Marion. Why do we undertake an audit and sampling? Regulation 15 South Australian Public Health (Legionella)
Financial Training Module # 2 Purchase Procedures Activity & Service Fee Business Office at the University of Central Florida
Part Approval / Compliance Data Submission via Jotform.com
Explorer Post Renewal Instructions
ISO/IEC
Sheridan RFP Proposal for the Purchase of Printers for HMC 1 & 2
The Federal programs department September 26, 2017
Managing your PhD: part time students and staff
Part Approval / Compliance Data Submission via Jotform.com
Facilities Maintenance Extension
What is the UL QFCP? FCIA Webinar Presenters:
Management Verifications & Sampling Methods
Initial Licensure Process, Survey Types & Licensure Action
OSU Controlled Substances Training Module for Researchers
Free-Standing Emergency Center (FSEC) Accreditation Program
Presentation transcript:

UnionPay Card Manufacturer Certification Introduction

Executive Summary Introduction UnionPay Card Manufacturer Certification Procedure Responsibility for UnionPay Card Manufacturer Certification Service for UnionPay Card Manufacturer Appendix

Introduction UnionPay provides four major types for UnionPay Card Production Manufacturer: ─ Card Manufacturing ─ Magnetic Stripe Personalizing ─ IC Embedding -Contact -Dual-face ─ IC Personalizing The application procedures are similar for the four types certificates, please refers to the following slides for more details.

Certification Procedure ── Time Schedule Note: 1.Time schedule here is the maximum number and may be less in the real case. 2. The schedule does not include the duration of 2nd onsite inspection, if card manufacturer failed at the first time. StepsOwner Duration (Week) 1 st Month2 nd Month3 rd Month4 th Month5 th Month6 th Month ) ApplicationManufacturer- 2) Application Review UnionPay Certification Office 4 3) Prepare Sample Card Manufacturer4 4) Sample Card Testing BCTC/FIME4 5) Onsite Investigation UnionPay Certification Office 12 6) Onsite Investigation Result UnionPay Certification Office 4 7) Issuing Certificate UnionPay Certification Office 1

Part I: Application-Documents Preparation 1. Application Form for UnionPay Card Manufacturer 2. Copies of business license or approved by the local regulator 3. Comprehensive introduction of the manufacturer including, but not limited to, profile, product scope, manufacturing facility and equipment, produce in capacity, staff and organization, product quality management policy, security management policy, packaging and delivery management policy, etc. 4. The allocation map of the entry control, monitoring equipment, fire protection and warning system 5. The audited annual reports of recent two financial years 6. The recommendations from least one local UnionPay Member 7. The quality certification or evidence of possessing sound quality assurance system issued by the institution approved by the nation or industry 8. Copy of the purchased liability insurance of manufacturer 9. Other documents required by the Certification Office

Part I: Application- Submit Documents Manufacturer submits application documents to UnionPay UnionPay Certification Office decides the acceptance or not Go to Part II Once the application is accepted, manufacturer shall pay the Application Fee

Part II: Application Review The Certification Office is responsible for the review of the application documents Certification Office receive the application documents Certification Office complete the application review (4 weeks) Go to Part III Certification Office issues Document Review Result of UnionPay Card Manufacturer Certification

Part III: Sample Card Test - Requirements The applicant shall submit sample cards to the Test Center for testing within one month upon receiving the notification (if the result is “passed”) Requirements for Sample Card Quantity : Requirements for Sample Card Appearance  Unless otherwise specified, the sample cards to be tested shall have placed UnionPay hologram, UnionPay logo, signature panel, magnetic stripe and etc on the surface Requirements for Sample Card Color  Card face and back  UnionPay Logo Card Manufacturing15 per kind for both debit and credit cards Magnetic Stripe Personalizing30 for Embossing and 15 for plane printing IC Embedding40 for contact and 20 for dual interface IC Personalizing2 pieces for each template Note: For more detailed test standards and card specification, please refer to Testing Guide from Lab and UnionPay Card Specification.

Part IV: Onsite Inspection The Certification Office is responsible for onsite inspection of the manufacturer Onsite inspection will cover the following features:  Internal rules and procedures for card manufacturing  Staff management  Security facilities management  Product quality management  Order management  Storage and delivery Note: For more detailed requirements on onsite inspection, please refer to UnionPay Card Manufacturer Security Management Guide and Security Guide of UnionPay Card Personalization Service Provider

Part V: Issuing Certificate The Certification Office shall generate certification result based on the results on application documents, sample card testing and onsite inspection The Certification Office will notify the applicant of the certification result by issuing Notification of UnionPay Card Manufacturer Certification The certified manufacturer shall sign The Holding Commitment of UnionPay Card Manufacturer Certificate with the Certification Office, and agree to accept supervision from the Certification Office at any time The Certification Office will provide Qualification Certificate for UnionPay Card Manufacturer to the certified vendor and make public notice Note: The manufacturer that fails to the certification is not allowed for second application within one year

Responsibility for UnionPay Card Manufacturer Certified UnionPay card manufacturer shall fully comply with UnionPay rules and procedures on whole process of UnionPay card manufacturing, and accept Certification Office’s Supervision and Penalties The certified manufacturer shall fill in the Monthly Report of Ordering and producing UnionPay Card, and submit the report for last month to the Certification Office within the 7 calendar day each month The certified manufacturer can only deliver the card to the ordering UnionPay member. Otherwise, the manufacturer shall obtain the prior approval from UnionPay and the ordering UnionPay member Result Notification of UnionPay Card Design Review issued by UnionPay must be needed before UnionPay card manufacturing The certified manufacturer shall submit card for testing timely to ensure the card quality The certified manufacturer must notify the Certification Office of the required scenarios, if happened

Certification Service for UnionPay Card Manufacturer Training for UnionPay card manufacturer certification rules and procedures Introduction of UnionPay card specification and test standards Contact Information: Name: Ms. Jing ZHAO Tel: (8621) Fax: (8621)

Appendix A - Fee Fees ProgramCertificatePrice Application Fee* N/AUSD 7,000 Annual Fee Card ManufacturingUSD 5,000 Magnetic Stripe PersonalizingUSD 3,000 IC EmbeddingUSD 2,500 IC PersonalizingUSD 1,800 *: Application Fee only applies to the manufacturer which has no UnionPay Certificate before. Additional testing fee may required by the Test Center which is not included in the application fee.

Appendix B – Supporting Documents UnionPay Card Manufacturers Certification Rule UnionPay Card Specification UnionPay Card Manufacturer Security Management Guide Security Guide of UnionPay Card Personalization Service Provider

Thank you