Aquatic Facility Evaluation Date: 5/7/15 Kyle McCawley, P.E. City of Merriam.

Slides:



Advertisements
Similar presentations
Aubrey Green Community Meeting Issues and Opportunities Vandalism Safety Community Image Community Opportunities and Renewal Who is here and Why PW - Parks.
Advertisements

The Greenwood Apartments a partnership between Banc of America Community Development Corporation and Clearwater Neighborhood Housing Services, Inc.
PARKVIEW APARTMENTS 20 Unit Rehabilitation & Site Work ISLA VISTA, CA. Joint Cities-County Affordable Housing Task Group October 23, 2008.
Welcome Overview: Property Maintenance Code Requirements
BOLTON RESERVOIR 2012 BOLTON RESERVOIR CLEANING AND INSPECTION.
Common problems you will find in roofing systems Common problems you will find in roofing systems.
1 Low Conductivity Water (LCW) Connection Training Environmental Energy Technologies Division Safety Topic January 9, 2012.
Cooling Tower Maintenance Training.
FORT PIERRE & PIERRE COMMUNITY MOPTF (MAYOR’S OUTDOOR POOL TASK FORCE) APRIL 21, 2008.
ASPHALT & CONCRETE FOR INDOOR FACILITIES Presented by Tom DeRosa.
Finance and Facilities. DuPage County, IL EAV Growth History (Five Year Average: -2.15%)
Accessibility.  A building code is a set of rules that specify the minimum acceptable level of safety for buildings. The main purpose of building codes.
October 2009 Construction Progress. University City School District Bond Wolfe Architects – architect McCarthy Construction – construction manager Barbara.
Federal Aviation Administration Project Status Update: R90 Tracon, STL ATCT, MCI ATCT, mold and moisture issues Presented to : CSA Terminal and Technical.
Investigate the future of Breese Stevens Field though a focused neighborhood planning process Determine if present uses can be better served at an alternate.
AT 201 Introduction to Architecture
Eldred Central School District Five Year Capital Facilities Plan September
Global Lift Corp Understands that there will many questions Asked in regards to ADA Laws, this will guide you along The way of.
Gas Transmission Pipelines
Trestle Rebuilds The Continuing Quest to Fill the Gap
Global Lift Corp ADA Laws & Commercial Series Lifts.
Fox Point Homeowners Association October 30, 2013.
Unit 6.2. Mechanical and mixed mode ventilation TB Infection Control Training for Managers at National and Subnational Level.
Recycle North Building Renovation and Design Senior Capstone Design Project Civil and Environmental Engineering Scott Hamshaw Presenting.
Hays Street Bridge Rehabilitation Patrick Sparks, P.E. Approaches to Historic Bridge Rehabilitation Case Study #1 1.
Experience the verve of living by the banks and drift through the historic and scenic beauty of Pasig River. Project lot area composed of 14,000 square.
ACQUATICS FACILITY STUDY City of Vincennes Department of Parks & Recreation.
Shop Safety and Conduct By: Mr. Beese. Safety In The Work Area Keep Work Area Clean Tools Put Away Fire Hazards can be avoided Shop Floor.
Health Onboard Manual NI 516 DCM R00 E Ships in Service Training Material Safety Risk Factors 2009.
Draft Rancho Colorados Swim & Tennis Club Master Plan Overview.
Approaches to Historic Bridge Rehabilitation Case Study #4
Building Technologies Energy and Infrastructure Upgrade Program Utilizing National Grid Incentives Rensselaer County Office Building.
Construction Update August 18, 2010 Rob Gaertner, P.E. Director of Facilities.
Facilities Condition Assessment Initiated: February 2004 Consultant: ISES Corporation Stone Mountain, GA Scope: Identify the conditions of our facilities,
Klein High School Original building built in 1963 Move KHS to HS #5 in 2011 Move back to renovated KHS in 2013.
Aquatic CEU Workshop Authorized by Iowa Parks and Recreation Association Presented by Pool Tech Midwest, Inc. Copyright – Pool Tech Midwest, Reference:
COGNIZANT TECHNOLOGY SOLUTIONS PRIVATE. LTD Monthly Review Meeting – August 2008.
Wet Area Linings Part 3 – Flooring & Other Details M. Martin Feb, 2005 Reviewed Feb, 2006 & 2007 M. Martin Feb, 2005 Reviewed Feb, 2006 & 2007.
Pool Project SWIMMING POOL 3500sq ft. DECK AREA 7000sq ft. SHELTER400sq ft. EQUIPMENT ROOM/STORAGE SHELTER 1400sq ft.
Housing Service Review Plan for the coming period 24 November 2014.
CHATSWORTH HIGH SCHOOL. LOCNSNAMTASK_NAME 8583CHATSWORTH HSPURCHASE & INSTALL MODULAR BUILDING AT GIRLS SOFTBALL FIELD CHATSWORTH HSChatsworth.
Return site to its rightful glory with cleaner water and more enjoyable experience Propose appropriate additions and renovations to pool, buildings and.
Energy Huntsville Opportunity Report and Government Collaboration February 2016.
HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO, ILLINOIS High School Building Project.
MTH16_MTE1_Review.pptx 1 Bruce Mayer, PE Mathematics 16: Applied Calculus-II Bruce Mayer, PE Licensed Electrical & Mechanical.
TRUMAN MIDDLE SCHOOL Presented by Counsilman ▪ Hunsaker Facility Audit.
Facility Committee June 17, Othello Community Pool Features: Leisure amenities: including a 2,800-square-foot leisure pool, lazy river and spray.
2016/2017 CEO Capital Projects Plan July Capital Project Planning  We started 2015 with 40 new Capital Projects + 19 carry forward projects from.
CITY COUNCIL OCTOBER 18, 2011 Central Park Gazebo Replacement.
Chapter 6 6 Maintenance C H A P T E R Brent Beggs.
Big Cypress Basin Capital Project Update Jeffrey Kivett, P.E., Director Operations, Engineering and Construction Division Jeffrey Kivett, P.E., Director.
Department of Public Works FY Capital Improvement Program (CIP) Budget Adoption & Amendments to FY 16 CIP May 16, 2016.
De Pere Aquatic Presentation
TECHNICAL SPECIFICATION AND REQUIREMENTS
Standard Work Instruction: MHE Pre-Trip
Capital Improvements Plan
MHE Pre-Trip Inspection Standard Work
Southern Lehigh School District
Bill Good Chief Operations Officer
Minnesota Correctional Facilities Capital Investment
MONTHLY STATUS REPORT– May 2013
GM Dealer Equipment Program
Auto Upkeep Basic Car Care, Maintenance, and Repair (2nd Edition)
Welcome.
FILTRATION & WATER TREATMENT SPLASH PARKS & WATER PLAY PARKS

Council Agenda Item #5 February 4, 2019
Stoughton Public Library
Jones Island Water Reclamation Facility
Presentation transcript:

Aquatic Facility Evaluation Date: 5/7/15 Kyle McCawley, P.E. City of Merriam

Project Scope Pool basin/shell condition Perimeter deck and fence Play amenities Building structures Mechanical space Recirculation system Disinfection system ADA accessibility Safety concerns Aquatic Facility Evaluation

Bathhouse ItemConcernResolution ADA Access (Bathhouse) Current configuration does not meet standards - Water closets - Lavatories - Shower compartments Renovated the bathhouse Bathhouse skylightsCrackedReplace

Main Pool ItemConcernResolution ADA Access (Main Pool)Hose in accessible routeRelocate the hose connection, or install a pool lift with a battery ADA Access (Main Pool)Change in level for the stair accessInstall without a change in level Concrete deteriorationDeteriorating deep-end transitionReplace Gutter/deck joint (Main pool)Deterioration of concreteDevelop a long repair with a structural engineer Basin lifeDeterioration of concrete Replace within 6-10 years

Slide Pool ItemConcernResolution Slide tower deckingExcessive corrosionReplace Slide tower structural steelSurficial corrosionClean and recoat Slide tube seamsSeparationReseal Concrete deteriorationDeteriorating slide pool stepsReplace Basin lifeDeterioration of concrete Replace within 8-12 years

Wading Pool ItemConcernResolution ADA Access (Wading Pool) Current configuration does not meet standardsInstall a pool lift Wading pool slide pumpOverheatingInstall ventilation system Drain pipingCorroded at the slide pool and the wading poolReplace Deck railingCorroded at the wading poolReplace

Mechanical Room ItemConcernResolution Filtration systemDeteriorating due to - Age of system - Excessive corrosion Replace Electrical panelsSurficial corrosionClean

Implementation Plan Year 0 to 2 Item TasksEstimated Cost Slide tower deckingReplace$25,000 to $50,000 Slide tower structural steel -Clean and recoat -Replace compromised components $5,000 to $20,000 Filtration systemReplace$75,000 to $125,000 ADA Access (Wading Pool) Install a pool lift$5,000 to $10,000 ADA Access (Main Pool) Install a pool lift with a battery$5,000 to $10,000 ADA Access (Main Pool) Install without a change in level$2,500 to $5,000 Wading pool slide pumpInstall ventilation system$2,500 to $5,000 In-pool lightingReplace$5,000 to $10,000

Implementation Plan Year 3 to 4 Item TasksEstimated Cost Concrete deterioration -Repair main pool deep end transition -Repair slide pool steps $2,500 to $5,000 Basin CoatingRecoat$25,000 to $50,000 Gutter/deck joint (Main pool) Develop a long repair with a structural engineer $25,000 to $50,000 Cracked skylightsReplace$5,000 to $10,000 Slide tube seamsReseal$1,000 to $2,000 Electrical panelsClean$500 to $1,000

Implementation Plan Year 5 to 6 Item TasksEstimated Cost ADA Access (Bathhouse) Renovation$400,000 to $500,000 Drain pipingReplace$10,000 to $20,000 Deck railingReplace$2,500 to $5,000 Deteriorating basinsReplace$1,500,000 to $2,500,000

Questions?