MSAD # 52 Energy Savings Performance Contract May 4, 2016 Upgrading our School Facilities and Reducing Energy and Maintenance Costs Utilizing Performance.

Slides:



Advertisements
Similar presentations
Energy Performance Contracts Chip Barnes. What is an EPC? Popular way to obtain infrastructure energy efficiency & operational improvements with: Popular.
Advertisements

STEPS TO SUCCESS WITH FCIP Ryan Freed Kansas Energy Office.
Presented by: Rod Meredith Assistant Director Public Works Riley County, KS Matthew Leaper Business Development Manager Johnson Controls, Inc. IMPLEMENTING.
Re-commission 5 Buildings Goal 2012 Lighting Upgrades VFDs Historic Weather Extremes Boiler Efficiency Free Cooling AHU Schedules.
New York Life Building 20 West Ninth Street Mike Thome Hoss & Brown.
Energy Performance Contracting November 3, 2009 Performance Contracting December 11, 2009.
Raymond School District Raymond School Facility Assessment Executive Summary September 16, 2013 Eppstein Uhen Architects Eric Dufek, Senior Design Architect.
Worldwide Applied Systems Group 1 Comprehensive Comfort Solutions Trane’s Global ESCO Strategy Don Anderson Global Process Owner.
How to Hit a Homerun Saving Energy and Updating Facilities Presented by Shirley McNutt.
PERFORMANCE CONTRACTING. WHY PERFORMANCE CONTRACTING? PERFORMANCE CONTRACTING ALLOWS YOU TO GREEN/UPGRADE YOUR FACILITIES AND PAY FOR THE UPGRADES WITH.
ENERGY EFFICIENCY FOR END-USERS.  CSU Chancellors office coordinates the efforts to accomplish the goals established by Assembly Bill 32 for green house.
Industrial Heating & Piping Co. Madawaska School Department Energy upgrades to the heating system at the Madawaska High and Middle School.
Franklin County Technical School Performance Contract Project.
RETScreen® Energy Efficiency Projects
ON IT 1 Con Edison Energy Efficiency Programs Sustaining our Future Rebecca Craft Director of Energy Efficiency.
Solar Energy Technology for Commercial Facilities John Archibald American Solar, Inc. Association of Energy Engineers Baltimore Chapter.
Energy Conservation & Performance Contracting
Bond Construction Update Citizens’ Oversight Committee Long Beach Community College District January 28, 2008 BUILDING  TOMORROW  TODAY Cordoba Corporation.
Charles F. Hurley Building Case Study B.J. Mohammadipour Bureau of State Office Buildings.
Utility Rebates Services and Funding to Help Build “Green” Restaurants and Hospitality Facilities Tom Coughlin Program Manager.
CNN Center John Hester Turner Properties, Inc.. CNN Center Built in ,583,000 square feet on 18 floors Five structures joined by a common atrium.
Siemens sans siemens sans bold siemens sans italic siemens sans italic bold siemens sans black siemens black italic Siemens Building Technologies.
Impact of Incentives: Driving Demand for Efficient Products Steven Nadel ACEEE.
Greening Affordable Housing on a Budget or Where There's a Will, There's a Way.
CenterPoint Energy Healthcare Energy Efficiency Program (HEEP) CenterPoint Energy Healthcare Energy Efficiency Program (HEEP) November 2013.
Auraria Higher Education Center Case Study John Ismert & Frank Ellis Auraria Higher Education Center Facilities Management.
Helping Massachusetts Municipalities Create a Greener Energy Future Energy Management Services Eileen McHugh Municipal Energy Coordinator
Green Schools How to Save Money and Improve the Learning Environment Power Point at
Partnering with California's Schools: The IOU Energy Efficiency Programs Gene Rodrigues, Southern California Edison Gillian Wright, Southern California.
Green Building Demonstration Project Adam Saling City of San Diego.
TowerWise.ca Energy savings in Multi-suite residential buildings: Case Studies.
Building Technologies Energy and Infrastructure Upgrade Program Utilizing National Grid Incentives Rensselaer County Office Building.
New Mexico State University EFFICIENT RESIDENTIAL ENERYGY Fahzy Cooperative Extension Service ______ County.
PASBO Building Considerations for Vo-Tech Education March 17, 2011 Pat Adams Dave Kramer Collin Sandifer.
Energy Efficiency in Industrial and Commercial Facilities 2003 Energy and Environmental Conference September 16, 2003.
Foothill College & Space Science Center Bill Kelly Viron Energy Services (510) ext 13,
Name of Building(s) or Project Speaker(s) Organization(s)
Facility Improvement Program Town of Shirley June 17, 2013 Robert Reddish ABM Building Solutions.
International Newspaper Group 2008 Gannett’s Green Campaign.
Marriott Corporate Headquarters
Energy and Air Quality Conference April 5, 2004 Innovative financing, support, and solutions for Implementing Energy Projects.
The Lean Green Machines Energy Efficiency in the Restaurant Franchise Model.
Week 6 The Energy Walk Through. Possible elements of a walk through Understand on-site information collection and listing of essential data for collection.
Overview for Local Energy Committees February 10, 2016.
Sustainability Summit – April 12, 2016 Beau Engman 825 North Jefferson, Suite 300 Milwaukee, WI 53202
Energy Conservation Building Upgrades Alma School District.
Town of Woodbridge Beecher Road School Infrastructure & Energy Upgrade Presentation to Board of Education December 17 th, 2012 AKF John B. Rice, PE, LEED.
Johnson Controls, Inc. — 1 1/6 2/6 4/6 5/6 1/4 3/4 1/2 WAHOO PUBLIC SCHOOL SENIOR/JUNIOR HIGH & ELEMENTARY ENERGY PERFORMANCE CONTRACT FEASIBILITY March.
1 Town of Dedham Energy Saving Performance Contracting.
2015 Statewide Collaborative December 1, 2015 Ameren Missouri and Laclede Co-delivered Residential Direct-Install Low Income Energy Efficiency Program.
SHELTON SCHOOLS OPERATIONS. Energy and Conservation Grant Measures Look at the three main areas of impact Replace HVAC units and Controls at SHS Better.
Comprehensive Energy Projects May 4, 2016 Andy Kelly Manager of Plant Engineering Central Production Facility Co-op & Northeast Hot Fill Co-op.
Saving with renewable energy Presentation to North East Bioresources and Renewables January 2014.
Energy and Environmental Solutions Company Confidential—Siemens Building Technologies 2008 SLS 242/342: Performance Contracting - Proposing Opportunities.
Cuba-Rushford CSD Capital Project
January 12, 2017.
Guaranteed Energy Savings Performance Contracting
Potomac Edison Preliminary Energy Efficiency and Conservation Programs
Energy Saving Bureau Industrial energy audits in coherence with Directive on the promotion of end-use efficiency and energy services.
UMCP Learning Objectives
Implementing Effective Energy O&M Strategies on a Limited Budget
The ESCO Retrofit Model Financing energy efficient HVAC improvements through ESCOs Stephane le Gentil - November 2017.
Energy Performance Contracting Services Under WI Act 32
UNION GROVE ELEMENTARY REFERENDUM
Facilities Modernization Program
Improving Energy Reliability & Performance
Improving Energy Reliability & Performance
Plug & Play CHP? Is Your Pocket About to be Picked?
Open Hearing Presentation March 18, 2019
Dixon Middle School Project Update
Presentation transcript:

MSAD # 52 Energy Savings Performance Contract May 4, 2016 Upgrading our School Facilities and Reducing Energy and Maintenance Costs Utilizing Performance Contracting

2 Energy related capital improvements paid from energy and operating cost savings How MSAD 52 Got here…..  March of 2014: Due to continued growth in facility deferment, and lack of funding, the MSAD 52 School Board sub committees collaborated to find a creative way to make much needed infrastructure improvements to their facilities, without an increase to current budgets, or a tax increase.  Through research, they found a financial vehicle known as Performance Contracting (PC) to make this happen. They reached out to many colleagues from other Towns and School Departments that have used PC as a tool to make improvements to their facilities. Unanimously, the Committee discovered that the PC process proved to be extremely successful, for every reference they checked.  April of 2014: The Committee collaborated to issue an advertisement for two weeks, for a competitive RFQ process. They then interviewed (2) qualified Energy Services Companies, and unanimously chose SIEMENS Industry. Project completion: April, 2016

Page 3 Yearly Guaranteed Savings $263,524 Total Project Cost $5,243,646 Efficiency Maine Incentive $595,317 ROI 16.8 Project Financial Summary:

LAHS, TMS, TES, TPS, GCS, LCS refrigeration controls upgrades. LAHS, TMS, TES, TPS, LCS, cooling upgrades HS high efficiency domestic hot water heater replacement, converting to gas. TMS new ventilation equipment to 1962 section, existing equipment original. LCS steam to hot water conversion. LCS new high efficiency gas fired boiler plant. GCS new high efficiency gas domestic and heating plant boiler replacements. HS Demand Control Ventilation on 15 Air handlers. Page 4 Finally utilize oversized HS Chip boiler by underground pipe to TMS & TES. Replacement of all antiquated pneumatic controls. Major LED lighting enhancements: Every external light converted, nearly all class room fixtures, Gymnasiums, library, cafeterias converted. TMS multi boiler room conversion to single boiler plant. 173 new windows to TMS. Over 200 windows at the HS to be fixed and reset. Major building envelope and insulation projects at all Schools. New heating and ventilation system for Central office facility. Project installed Measures

Siemens SMC EMCRTHEMAINE BOA Major contractors: PM: Kevin Stromgren Lead EE: Elmer Arbogast EE: Kerri Warms Sales: Tom Seekins Service: Lorien Mathieu PM: Kim Long Finance:Deb Roberts

6 Energy related capital improvements paid from energy and operating cost savings Interconnection of underground pipe to HS Chip Plant. ~3,400 feet of pipe.

7 Energy related capital improvements paid from energy and operating cost savings Major Boiler Room improvements at ALL Schools:

8 Energy related capital improvements paid from energy and operating cost savings Many existing small to large capital improvement plan measures removed from MSAD 52 list!

9 Energy related capital improvements paid from energy and operating cost savings Oil tank, Roof and Window improvements

The Process and Time-line  Review final project energy savings impact  Monitor ongoing energy use  Ensure savings goals are maximized  Mobilized to site  Delivered equipment  Accelerated install  Maximized summer break for critical installation  Started up New equipment  Completed installation  Signed off measures  Determined improvements that maximize impact  Completed detail engineering  Negotiated final project  Signed Contract  Determined District energy use  Identified areas to maximize energy savings  Delivered Preliminary Report Preliminary analysis Detailed analysis Delivery & installation Regular measurement & verification Our experts structured a comprehensive plan tailored to meet strategic and technical business goals. May 2014-Jul Jul Mar Apr Apr Ongoing over program term