Doc.: IEEE 802.19-14/0085r0 Submission November 2014 Hyunduk Kang, ETRISlide 1 November 2014 IG CUB Closing Report Notice: This document has been prepared.

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0072r0 Submission September 2014 Hyunduk Kang, ETRISlide 1 September 2014 IG CUB Closing Report Notice: This document has been prepared.
Advertisements

Doc.: IEEE /0045r0 Submission July 2014 Hyunduk Kang et al, ETRISlide 1 Status of ISM Bands Notice: This document has been prepared to assist.
Doc.: IEEE /0803r1 Submission July 2005 TK Tan, Philips Slide 1 WNG SC Closing Report Notice: This document has been prepared to assist IEEE
Doc.: IEEE /0094r0 Submission November 2009 Steve Shellhammer, QualcommSlide 1 Comments on PAR Notice: This document has been prepared.
Doc.: IEEE /0054r0 Submission May 2011 Slide 1Hyunduk Kang, et al, ETRI Discussion on mode of management service Notice: This document has been.
Doc.: IEEE /1212r0 Submission TGT and MEF Liaison Notice: This document has been prepared to assist IEEE It is offered as a basis for.
Coexistence Lessons Learned – Update
[ Interim Meetings 2006] Date: Authors: July 2005
IEEE WG Status Report – July 2005
LB73 Noise and Location Categories
Call for Contribution to IG CUB
Call for Contribution to SG CUB
LB73 Noise and Location Categories
SG CUB Tentative Timeline
Waveform Generator Source Code
March 2014 Election Results
Attendance and Documentation for the March 2007 Plenary
Attendance and Documentation for the March 2007 Plenary
[ Policies and Procedure Summary]
November Opening Report
Motion to accept Draft p 2.0
Motions Date: Authors: January 2006
Decision Topology Definitions
TGp Closing Report Date: Authors: May 2007 Month Year
Decision on SG Formation
November Opening Report
July Opening Report Date: Authors: July 2009
Reflector Tutorial Date: Authors: July 2006 Month Year
TGv Redline D0.07 Insert and Deletion
TGv Redline D0.06 Insert and Deletion
July 2014 Opening Report Date: Authors: July 2014
July 2012 Opening Report Date: Authors: July 2012
November 2014 IG CUB Closing Report
July 2015 SG CUB Opening Report
TGu Timeline Date: Authors: July 2005 July 2005
Spectrum Sensing Tiger Team
TGu-changes-from-d0-01-to-d0-02
Discussion on SG Formation
Decision on SG Formation
September Opening Report
EC Summary of PAR Development
TGy draft 2.0 with changebars from draft 1.0
January 2015 SG CUB Closing Report
November 2014 IG CUB Opening Report
March 2015 SG CUB Opening Report
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
Redline of draft P802.11w D2.2 Date: Authors:
TGp Closing Report Date: Authors: March 2007 Month Year
November Opening Report
TGu-changes-from-d0-02-to-d0-03
[ Policies and Procedure Summary]
March Opening Report Date: Authors: March 2011
Liaison Report From Date: Authors: Month Year
November 2012 Opening Report
September 2012 Opening Report
Questions to the Contention-based Protocol (CBP) Study Group
January Opening Report
EC Motions – July 2005 Plenary
Motion for Study Group on TV White Space Coexistence
July 2015 SG CUB Opening Report
July 2015 SG CUB Closing Report
TGu-changes-from-d0-03-to-d0-04
TGu Timeline Date: Authors: January 2005 January 2005
TGu Timeline Date: Authors: May 2005 May 2005
TGu Timeline Date: Authors: July 2005 July 2005
July 2014 Opening Report Date: Authors: July 2014
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
November 2014 Opening Report
TGu Timeline Date: Authors: July 2005 July 2005
WNG SC Closing Report Date: Authors: July 2006 July 2006
Presentation transcript:

doc.: IEEE /0085r0 Submission November 2014 Hyunduk Kang, ETRISlide 1 November 2014 IG CUB Closing Report Notice: This document has been prepared to assist IEEE It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures, including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the TAG of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE TAG. If you have questions, contact the IEEE Patent Committee Administrator at. Date: Authors:

doc.: IEEE /0085r0 Submission Abstract This is IG CUB closing report from November 2014 plenary meeting in San Antonio, U.S.A. November 2014 Hyunduk Kang, ETRISlide 2

doc.: IEEE /0085r0 Submission Results of the Week Technical contribution –Overview of EU LBT and its Effectiveness for Coexistence of LAA LTE and Wi-Fi (19-14/0082r0) Discussion on SG formation –Study items –Target unlicensed frequency bands –Target system Decision on SG formation –Decision on SG Formation (19-14/0084r1) –Straw poll passed November 2014 Hyunduk Kang, ETRISlide 3

doc.: IEEE /0085r0 Submission Participants During 3 sessions, 20 participants attended. Affiliations are –CableLabs –ETRI –Samsung –ZTE –Amerisys –Ericsson –ATR –Qualcomm November 2014 Hyunduk Kang, ETRISlide 4

doc.: IEEE /0085r0 Submission Teleconferences November 2014 Hyunduk Kang, ETRISlide 5 DayDateStart TimeEnd TimeCall Host WednesdayDecember 3 6:00 PM Eastern Standard Time 7:00 PM Eastern Standard Time Hyunduk Kang WednesdayDecember 17 3:00 AM Eastern Standard Time 4:00 AM Eastern Standard Time Hyunduk Kang

doc.: IEEE /0085r0 Submission January 2015 Interim Objectives CUB SG is going to have the first face-to-face meeting CUB SG starts to study –Coexistence scenario and use cases –To define necessary information to be exchanged between different systems to mitigate coexistence problems –How to exchange messages among entities –Methods for improving coexistence among wireless dissimilar systems in unlicensed bands –To demonstrate potential coexistence improvements from shared information –Other issues related to enhance coexistence in unlicensed bands November 2014 Hyunduk Kang, ETRISlide 6

doc.: IEEE /0085r0 Submission Tentative IG CUB Timeline 1 st IG F2F meeting: July nd IG F2F meeting: September rd and the last IG F2F meeting & decision on SG formation: November st SG F2F meeting: January 2015 November 2014 Hyunduk Kang, ETRISlide 7