GEF Third Biennial International Waters Conference Salvador, Bahia Brazil June 20-25, 2005 Thematic Breakout Session II: M&E Results: Programme Study Recommendations.

Slides:



Advertisements
Similar presentations
URUGUAY’s efforts to address synergies among the Conventions Workshop on synergies and cooperation with other conventions 2-4 July 2003 Espoo, Finland.
Advertisements

Progress Toward Impact Overall Performance Study of the GEF Aaron Zazueta GEF Evaluation Office Hanoi, March 10, 2010.
A Presentation by UNEP At the UNFCCC Workshop on the Adaptation Fund Fairmont Hotel Macdonald Edmonton, Alberta, Canada 3—5 May 2006.
How Country Stakeholders Get Involved Group Exercise June 2013 MONITORING AND EVALUATION IN THE GEF.
OPTIONS AND REQUIREMENTS FOR ENGAGEMENT OF CIVIL SOCIETY IN GEF PROJECTS AND PROGRAMMES presented by Faizal Parish Regional/Central Focal Point GEF NGO.
System of Environmental-Economic Accounting SEEA Implementation Guide and Diagnostic Tool Alessandra Alfieri UNSD.
1 Course Title: Ecotourism Course Code: (TM371) Lecture.
GEF Policies and Processes in GEF 4 Sub-regional Workshop for GEF Focal Points Europe and the CIS 7-8 March 2007, Istanbul.
Sub-Regional Workshop for GEF Focal Points in Asia Bangkok, Thailand 7-8 April 2009 Tracking national portfolios and assessing results.
The GEF in Mexico Integrating GEF Programmes and Strategies at Country Level Cape Town, August, 2006.
Fifth Overall Performance Study (OPS5).  Objective  Analytical framework  Key issues to be covered  OPS5 audience  Organizational issues  Group.
1 Capacity Building: Strategy and Action Plan GEF-UNDP Strategic Partnership Capacity Development Initiative.
Cross-cutting areas of Capacity Building and Adaptation UNDP Workshop for NIS Environmental Focal Points June 2004.
Strategic Partnership For The Mediterranean Brief overview of the Regional Component of the project and the current status of its implementation.
Preliminary theory of change for the South China Sea Project Cluster Neeraj Negi Reference Group Meeting Bangkok, Thailand September 27, 2010.
Initial thoughts on a Global Strategy for the Implementation of the SEEA Central Framework Ivo Havinga United Nations Statistics Division.
Contribution of the Territorial Cooperation Programmes to the EU Strategy for the Danube Region Kiril Geratliev, Director General “Territorial Cooperation.
Forging Partnerships in Europe and Beyond 1 Happy Earth Day! April 21, 2002.
Egyptian Environmental Affairs Agency National Capacity Self Assessment (GEF/UNDP) The Third GEF Assembly Side Event – 30 th August,2006 Cape town Integrating.
Global Task Team: Improving AIDS Coordination Among Multilateral Institutions and International Donors Briefing for Theme Group on HIV/AIDS 1 November.
Tracking of GEF Portfolio: Monitoring and Evaluation of Results Sub-regional Workshop for GEF Focal Points Aaron Zazueta March 2010 Hanoi, Vietnam.
European Commission Environmental cooperation in the Mediterranean June 2009.
Financing for National Communications UNFCCC Workshop, Manila Ravi Sharma United Nations Environment Programme – Global Environment Facility.
Country Presentation- GEF Operational Focal Point, Sri Lanka GEF Sub-Regional Workshop 2-3 December 2007, Bali, Indonesia Anura Jayatilake Director, Environmental.
The Global Environment Facility Leonardo A. Ramirez October 13th, 2005.
Sub-Regional Workshop for GEF Focal Points in West and Central Africa Accra, Ghana, 9-11 July 2009 Tracking National Portfolios and Assessing Results.
8 TH -11 TH NOVEMBER, 2010 UN Complex, Nairobi, Kenya MEETING OUTCOMES David Smith, Manager PEI Africa.
SESSION 3: FROM SETTING PRIORITIES TO PROGRAMMING FOR RESULTS.
Ministerul Mediului si Gospodaririi Apelor Session 6 - Enhancing National GEF Coordination, Communication and Outreach Developing the National Capacity.
M&E in the GEF Carlo Carugi Senior Evaluation Officer Expanded Constituency Workshop Dakar, Senegal - July 2011.
Training and Environmental Education By Munshimbwe CHITALU Environmental Council of Zambia Zambia.
History of the Project Dr Andrew MENZ Project Coordinator, LTBP.
Institutional Structure of the GEF GEF Expanded Constituency Workshop September 2011 Honiara, Solomon Islands.
Permitting and Inspection. 1. When is decentralization effective? Delegate most permit writing and inspection functions to lowest possible level to effectively.
Policies and Procedures for Civil Society Participation in GEF Programme and Projects presented by GEF NGO Network ECW.
Integrating GEF in Environment and Sustainable Development Plans and Policies - – Jamaica’s Experience GEF CSP Sub-regional Workshop for Caribbean Focal.
Introduction of the Study of the GEF Contributions to the South China Sea Sub-regional Workshop for GEF Focal Points Aaron Zazueta March 2010 Hanoi, Vietnam.
Tracking national portfolios and assessing results Sub-regional Workshop for GEF Focal Points in West and Central Africa June 2008, Douala, Cameroon.
Eurostat/UNSD Conference on International Outreach and Coordination in National Accounts for Sustainable Development and Growth 6-8 May, Luxembourg These.
GEF: Support for the Implementation of Article 8(j) and Related Provisions Informal Presentation at the Meeting of the Working Group on Article 8(j) Montreal,
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
Vito Cistulli - FAO -1 Damascus, 2 July 2008 FAO Assistance to Member Countries and the Changing Aid Environment.
Overall Objective of the Programmatic Approach To secure larger-scale and sustained impact on the global environment through integrating global environmental.
GEF-Assisted Integrated Ecosystem Management Project In The Trans- Boundary Areas Between Nigeria and Niger Republic.
Addressing adaptation under the Convention in a coherent manner Presentation by Juan Hoffmaister Co-Chair, Adaptation Committee.
FAO Turkey Partnership Programme (FTPP) FAO Final Evaluation of the FTPP Summary for FTPP Programming Meeting, 14 December
Workshop and Steering Committee Meeting Globally-important Ingenious Agricultural Heritage Systems (GIAHS) Project Rome, 7-9 June 2004 Components and Processes.
The Convention on Biological Diversity Progress report Marjo Vierros Secretariat Convention on Biological Diversity ICRI General Meeting Palau, 31 October.
Developing National GEF Strategies and Setting Priorities Nino Tkhilava GEF Operational Focal Point in Georgia Europe and CIS workshop for GEF Focal Points.
Sustainable Management of the Bay of Bengal Large Marine Ecosystem Rudolf Hermes Chief Technical Advisor, BOBLME 1 st Asia Pacific Regional Targeted Workshop.
Integrated Coastal and Watershed Management: The Caribbean SIDS Experience GEF 3 rd Biennial International Waters Conference Salvador, Bahia, Brazil 20.
PROGRESS IN THE IMPLEMENTATION OF THE LVEMP-I & THE PREPARATION OF THE LVEMP-II PAPER PRESENTED AT THE GEF THIRD BIENNIAL INTERNATIONAL WATERS CONFERENCE.
External Action: Thematic Programme For Environment and Sustainable Management of Natural Resources including Energy Structure: I- INTRODUCTION II - CONTEXT.
Capacity Building in: GEO Strategic Plan 2016 – 2025 and Work Programme 2016 Andiswa Mlisa GEO Secretariat Workshop on Capacity Building and Developing.
International Waters Program: New Opportunities for the World Bank June 2005.
Caspian Environment Programme (CEP) GEF 3rd Biannual International Waters Conference June Salvador.
Dr. Vladimir Mamaev UNDP Regional Technical Advisor Integrated Natural Resource Management in the Baikal Basin Transboundary Ecosystem Russian Federation.
Preliminary theory of change for the South China Sea Project Cluster
LAKE TANGANYIKA AUTHORITY
GEF governance reforms to enhance effectiveness and civil society engagement Faizal Parish GEC, Central Focal Point , GEF NGO Network GEF-NGO Consultation.
MONITORING AND EVALUATION IN THE GEF
ADAPTATION TO CLIMATE CHANGE
Statistics Governance and Quality Assurance: the Experience of FAO
Institutional Structure of the GEF
Evaluation in the GEF and Training Module on Terminal Evaluations
MONITORING AND EVALUATION IN THE GEF
MONITORING AND EVALUATION IN THE GEF
MONITORING AND EVALUATION IN THE GEF
Dr. Nguyen Van Tai GEF Viet Nam Operational Focal Point
MONITORING AND EVALUATION IN THE GEF
Presentation transcript:

GEF Third Biennial International Waters Conference Salvador, Bahia Brazil June 20-25, 2005 Thematic Breakout Session II: M&E Results: Programme Study Recommendations Thursday, June 23, 2005 Presentation Benoit Bihamiriza

I. Introduction We are impressed by the results reached by the M&E Team; We welcome the recommendations made and would like to see them put into practice; We would like to express our gratitude to GEF for organizing this major event and for inviting us to share IW experiences & lessons.

II. Brief Recall of GEF Interventions for Lake Tanganyika and its Results 1995 – 2000: Lake Tanganyika Biodiversity Project (LTBP): ‘’Pollution Control & Other Measures to Protect Biodiversity of Lake Tanganyika’’. Funded by GEF through UNDP; implemented through UNOPS by

Lake Tanganyika Project Results (Continued 1) NRI (Natural Resources Institute) in collaboration with MRAG (Marine Resources Assessment Group Ltd) & IFE (Institute of Freshwater Ecology).

Lake Tanganyika Project Results (Continued 2) Results of LTBP intervention: –Numerous scientific studies. –Lake Tanganyika TDA –Lake Tanganyika SAP –Draft Convention on the sustainable management of Lake Tanganyika; All conducted through an in-depth stakeholders participation process.

Lake Tanganyika Project Results (Continued 3) 2002 – 2004 : Lake Tanganyika Management Planning Project (LTMPP) PDF-B: ‘’Developing Detailed Regional and National Project Proposals and Financing Mechanisms to Implement the Lake Tanganyika Strategic Action Program)’’. Funded by GEF through UNDP; Executed by UNOPS.

Lake Tanganyika Project Results (Continued 4) Results of this PDF-B intervention: –Detailed regional and national projects to implement the SAP; –Financing mechanisms to implement the SAP; –Leveraged about US$ 80 million through an increased Partnership of GEF/UNDP with AfDB, EU/COMESA, NDF, IUCN, FAO and riparian countries;

Lake Tanganyika Project Results (Continued 5) –Signing of the Convention by all four riparian countries (June 12, 2003); –Ratification of the Convention by two countries; –Lake Tanganyika Management Authority ready to be established; –The Authority will coordinate the implementation of the SAP, the FFMP and the Convention.

Lake Tanganyika Project Results (Continued 6) Impact: Environmental impact may take long, but TDA, SAP and the Convention are regionally and nationally felt as ownership. The Convention and the Authority are offering opportunities for regional cooperation, peace building and maintenance as well as conflicts prevention and resolution over the use of the Lake Basin shared resource.

Lake Tanganyika Project Results (Continued 7) The Convention and the Authority to be established attracted an impressive partnership for the sustainable development of the Lake Tanganyika Basin; Private sector is also interested in being part of the process and is funding some of the management interventions (ex. Waste water pre-treatment in Bujumbura).

III. M&E Results, Programme Study Recommendations Priority Criteria : Coherent, transparent, and practicable design; Achievement of global benefits. Country ownership and stakeholder involvement. Replication and catalysis.

Priority Criteria (Continued 1) Cost-effectiveness and leverage. Institutional sustainability. Incorporation of monitoring and evaluation procedures. All criteria are important, but if we have to give further priority, coherence and practicable project design; country ownership and stakeholders involvement;

Priority Criteria (Continued 1) Institutional sustainability; and Incorporation of monitoring and evaluation procedures can reflect all the other and are the guarantors of project success (cf.explanation).

M&E Results, Programme Study Recommendations Recommendation 1: Production and use of an accessible GEF international waters focal area manual. We think this would be an important step towards improving project formulation and implementation;

Recommendation 1 (Continued 1) The suggestion to make it accessible and to translate it into all U.N. languages would help better understanding and communication Language has in fact proved to be a major communication problem in Lake Tanganyika;

Recommendation 1 (Continued 2) Projects formulation would improve, projects start-ups would accelerate and implementation would pose less difficulties. We welcome the recommendation that the manual should include clearer descriptions of the operational Programs;

Recommendation 1 (Continued 3) People in our case tended in fact to confuse the Concepts of global and local benefits, and had difficulties to apprehend the concepts of incremental Costs, leverage, etc. IW program focal areas should be clearly explained and the relationship with programs in other focal areas.

Recommendation 1 (Continued 4) At Lake Tanganyika, we agreed that management of the Lake could not be separated from the management of the entire basin. In the designing of new projects, we therefore would need to have clear explanation of IW programs focal areas and the relationship between especially biodiversity and Land degradation, but also climate change.

Recommendation 1 (Continued 5) Illustration by current project examples, demonstration projects, inclusion of a glossary of terms and a guide to the implementing agencies are all very important. Adaptive management is a useful tool in changing situations; without it, we won’t have overcome huge challenges in Lake Tanganyika region.

Recommendation 1 (Continued 6) Training of GEF project staff, particularly new staff should be introduced in all IW Projects and should be adapted to changing situations. It should include exchange visits with similar IW projects. Such training would improve project designing and implementation and will forge a GEF family identity.

Recommendation No. 2: Developing a comprehensive M&E system for IW projects that ensures an integrated system for information gathering and assessment throughout the lifespan of a project The M&E system should be an integrative part of all IW projects.

Recommendation 2 (Continued 1) The system should include details of monitoring of project progress, stress indicators, and projects results/ achievements; Systematic assessment of current indicators has to be conducted before undertaking their harmonization.

Recommendation 2 (Continued 2) M&E tools should be aimed at helping to improve management decision- making by providing information and data to projects managers and partners on all projects implementation aspects. M&E tools should be common and accessible to all IW projects.

Recommendation 3: The incorporation of a regional- level coordination mechanism for IW projects. The new mechanism could be of great assistance to project coordinators and stakeholders as it would be closed to them.

Recommendation 3 (Continued 1) The mechanism would enable and enhance synergies between IW projects and their focus on global benefits; It would enable the M&E system to be strengthened at a regional level; and Would assist IAs, EAs and Donors to monitor progress and recommend corrective measures if necessary in time.

Recommendation 3 (Continued 2) It should also involve National GEF Focal Points to ensure enhanced national support. However does this means the creation of a new distinct project as a regional coordinating body to lead other projects in each cluster in a same natural boundary? Will it coexist with the current GEF regional coordination/facilitator offices, or Will it reinforce them to service this arrangement?

Recommendation 4: The redefinition of the GEF International Waters Task Force Should enhance their technical backstopping and supervision; and Should be available to the projects whenever needed, as failure in project effective supervision leads to difficulties in projects formulation & implementation.