Lean Six Sigma for Service Dirk Barth, NC State CSSMBB, ASQ SSBB #927.

Slides:



Advertisements
Similar presentations
Demystifying 6.
Advertisements

© 2009 Factory Strategies Group LLC. All rights reserved. Lean Sales Lean Enterprise Series.
© Copyright Richard W. Selby and Northrop Grumman Corporation. All rights reserved. 0 Process Synchronization and Stabilization February 2007 Rick.
Dr. Ron Lembke SCM 462.  Financial return  Impact on customers and organizational effectiveness  Probability of success  Impact on employees  Fit.
Telecom Lifecycle Management Solutions for Sales Partners.
Principles of Six Sigma
QMS, ISO and Six Sigma It’s all related….. QMS Any Quality Management System must satisfy four requirements: Processes must be defined and their procedures.
Overview of Lean Six Sigma
Barry Murash MBBit Nortel 2007
SIX SIGMA. What is six sigma? Sigma is a measure of “goodness: the capability of a process to produce perfect work. A “defect” is any mistake that results.
Genelco Software Solutions © 2007 IBM Corporation “Innovations In Action” Awards.
TEAM MORALE Team Assignment 12 SOFTWARE MEASUREMENT & ANALYSIS K15T2-Team 21.
1. 2 What is Six Sigma? What: Data driven method of identifying and resolving variations in processes. How: Driven by close understanding of customer.
Six Sigma By: Tim Bauman April 2, Overview What is Six Sigma? Key Concepts Methodologies Roles Examples of Six Sigma Benefits Criticisms.
Cytec Engineered Materials Business Confidential and Proprietary Applications of Six Sigma In The Composite Materials Industry 12 th IAQG General Assembly.
MANAGING FOR QUALITY AND PERFORMANCE EXCELLENCE, 7e, © 2008 Thomson Higher Education Publishing 1 Chapter 10 Principles of Six Sigma.
1 Industrial Design of Experiments STAT 321 Winona State University.
“Safety is a Measure of Success”
ENGM 620: Quality Management 26 November 2012 Six Sigma.
Lean Six Sigma Kick-Off Meeting Template
High-Speed, High Volume Document Storage, Retrieval, and Manipulation with Documentum and Snowbound March 8, 2007.
Calling for More Than Quality Assurance By: Eyal Rudnik, Product Marketing NICE Systems.
High Impact Global Product Engineering Solutions ® ©2007 Symphony Service Corp. All Rights Reserved. Symphony Services is a registered trademark of Symphony.
©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster The Accountant’s Role in the Organization Chapter 1.
Six Sigma at Boston Scientific Tuesday 12 September 2006 Steve Czarniak BSC Six Sigma: ASQ Meeting – 12 September 2006.
Chapter 9 Hypothesis Testing: Single Population
1 Project Name Team Lead Location Month XX, Year.
Welcome to Lean Six Sigma Green Belt Training
LeanSigma® Fundamentals
By: Nick Blank March 1, Six Sigma Definitions Goals History Methods Roles Benefits Criticism Software Development.
ASQ Raleigh ASQ Raleigh Section 1113 Six Sigma SIG DMAIC Series.
CS532 Term Paper Applying Six Sigma Methodology In Software Engineering Sourabh Bandyopadhyay.
Team Georgia Marketplace April 2, Department of Administrative Services 2 Team Georgia Marketplace Core Functionality  Electronic requisitioning.
Capability Assessment Six Sigma Foundations Continuous Improvement Training Six Sigma Foundations Continuous Improvement Training Six Sigma Simplicity.
Invoice automation: Three keys to AP prosperity Steve Marra Regional Sales Manager Solutions Sales Group October 28, 2014 © 2014 Wells Fargo Bank, N.A.
Six Sigma An Introduction. History of Six Sigma Motorola (1987) Motorola (1987) Texas Instruments (1988) Texas Instruments (1988) IBM (1990) IBM (1990)
© 2001 Six Sigma Academy © 2003 Six Sigma Academy1 Champion Workshop Key Concepts.
Six Sigma Overview Presented by: >. Agenda What is Six Sigma? History of Six Sigma Six Sigma Methodology When to use Six Sigma? Different Six Sigma belts?
Finance Vic Rainsford Vice President Planning & Analysis Jim Palmer Sr. Mgr. Planning & Analysis.
Project Storyboard (Page 1 of 2)
© G. A. Motter, 2006, 2008 & 2009 Illustrated by Examples Quality Function Deployment and Selection Matrices Customer Driven Product Development.
Using your Actuary as a Strategic Business Partner Presented by Bill Montanez, Jim Shoop, and Jeff Doffing.
1 LSSG Green Belt Training Improve: How do we get there?
MDIC 1 George Serafin Deloitte & Touche LLP MDIC Open Forum Quality System Maturity Model Update.
© 2002 Six Sigma Academy Eliminate Waste Reduce Variability Growth Six Sigma Elements Six Sigma is a business philosophy that employs a client-centric,
1 Prof. Indrajit Mukherjee, School of Management, IIT Bombay Bill Smith’s findings…. Bill Smith’s paper concluded that if product was found defective and.
ASTRA Update Sunflower Project Statewide Management, Accounting and Reporting Tool (SMART) February 12, 2009.
VERITRAC – “Real Time” GPS Tracking Presentation and Demonstration.
Contract Setup Project Black Belt: Rob Vaughn Week 3 Presentation Houston, TX.
Telecom Lifecycle Management 201: Why IT and AP need to work together ILTA Webinar Series Presented by Liz Carroll Director, Business Development - Legal.
Copyright 2010 by CH2M HILL, Inc. Company Confidential Getting More Bang for the Buck: Improving Efficiency Approaches and Tools Kristin M. Howlett, PMP.
THE MANAGEMENT & CONTROL OF QUALITY, 7e, © 2008 Thomson Higher Education Publishing 1 Chapter 10 Principles of Six Sigma The Management & Control of Quality,
Strategic Information Initiatives Week 5 Analysis Framework.
MGT 322 Entire Course FOR MORE CLASSES VISIT MGT 322 Week 1 DQ 1 Strategic Advantage MGT 322 Week 1 DQ 2 Purchasing and Materials.
Selecting the Right CRM System at AVEBE Refik Kocak CRM Partners (on behalf of AVEBE) CUSTOMER.
A Predictive Maintenance Strategy based on Real-Time Systems
TM 720: Statistical Process Control DMAIC Problem Solving
LEAN SIX SIGMA PROJECT TEMPLATE
Six-Sigma : DMAIC Cycle & Application
Six Sigma Approach.
اختبار الفرضيات اختبارالفرضيات المتعلقة بالوسط
Quality Management Six Sigma
LEAN SIX SIGMA PROJECT TEMPLATE
LEAN SIX SIGMA PROJECT TEMPLATE
Measure Phase Wrap Up and Action Items
QMS, ISO and Six Sigma It’s all related…..
Six Sigma Introduction 1 1.
Lean-Green belt six sigma program
Six Sigma (What is it?) “Six sigma was simply a TQM process that uses process capabilities analysis as a way of measuring progress” --H.J. Harrington,
Presentation transcript:

Lean Six Sigma for Service Dirk Barth, NC State CSSMBB, ASQ SSBB #927

Medical-Expert Review Process 2 What is Six Sigma? Business Strategy Customer SatisfactionFinancial AlignmentTop Down Focus USLLSLTarget How EFFECTIVE are we at satisfying our customers?

Medical-Expert Review Process 3 What is Lean? Poke-Yoke Value Stream Mapping How EFFIECIENT are we with our key metrics?

Medical-Expert Review Process 4 Efficiency vs. Effectiveness Efficiency Processing Time Average Speed to Answer (call center) Throughput Work Items / Day # of cases completed Effectiveness Customer Surveys First Call Resolution Call Quality Audit Pass Rate +

Service or Transactional Strategic Problem Solving Model Problem System? Follow the system within which people work. Psychology? Follow the people working within the system. A). Define and Characterize the KPOV. B). How is the product or process supposed to work? C). How is it working compared to the way it is supposed to work? Unknown? - Determine Not working how it is supposed to work? - Gaps Working how it is supposed to work? – Capability or Design Develop Solution Known? - Proceed The Critical Order 1.Predictability, y = f (x) 2.Sensitivity, local slopes of y = f (x). 3.Factors and Factor Variance.

Medical-Expert Review Process 6 Project Example Medical Bill Review Process General Discussion of Six Sigma in Service Companies

Medical Expert Review Process March 2012 ASQ and APICS meeting

Medical-Expert Review Process 8 Introduction How does an automobile insurance company detect fraudulent medical bills?

Medical-Expert Review Process 9 Problem Statement Medical-Expert Review Process — What is the overall benefit associated with the process? — What is the capability of the internal bill handling process? If a positive cost/benefit is determined, how does Company X optimize the process?

Medical-Expert Review Process 10 Project Summary Two separate teams, within Company X, handle the Medical-Expert Review Process Reviews are conducted on bills for treatment including: — MRIs — Nerve and Psych testing over $800 — Orthotics over $500 — Acupuncture bills in excess of $2000 — Multiple visits per day Company X uses two vendors, Companies Y and Z for their medical-expert reviews — Fees for review process average $225

Medical-Expert Review Process 11

Medical-Expert Review Process 12 Internal Bill Handling Process

Medical-Expert Review Process 13 Cause and Effect Matrix

Medical-Expert Review Process 14

Medical-Expert Review Process 15 Data Collection Strategy

Medical-Expert Review Process 16 MSA

Medical-Expert Review Process 17 Detailed Process Map: Paper Bills

Medical-Expert Review Process 18 Detailed Process Map: Imaged Bills

Medical-Expert Review Process 19

Medical-Expert Review Process 20 Best Fitting Distribution

Medical-Expert Review Process 21 CBA What is the overall benefit associated with the process? 95.0% Normal CI Cost Avoidance Probability Lower Upper % chance that the medical expert review process returns a positive cost avoidance The review process is overwhelmingly profitable

Medical-Expert Review Process 22 Current Capability: Too Late to Review

Medical-Expert Review Process 23

Medical-Expert Review Process 24 New Process Design

Medical-Expert Review Process 25 System Enhancements Automatic Routing of Bills into the Medical-Expert Review Process Dates and statuses of the bills updated in the claims system — automatic diary service Designed in the Third Party Software due to costs

Medical-Expert Review Process 26 Pilot Results January February

Medical-Expert Review Process 27

Medical-Expert Review Process 28 Results Reduction of 400 Bills Per Month $690 Per Bill $276,000 Per Month $3,312,000 Per Year

Medical-Expert Review Process 29 Post Rollout - Too Late to Reviews 77% of the bills too late to review were paper bills, further giving evidence for faster rollout of corporate bill imaging system. — Further CBA needed to be completed for corporate decision to rollout the new system. — Would add an additional $1.2 million per year 23% of the late reviews were from imaged system. — The team recommends further data collection to determine root cause — Would add an additional $400,000 per year

Medical-Expert Review Process 30 Control Plan MeasureSpecification Reporting Frequency Reporting Owner Recommended Actions If Out of Spec. Who/When/How Bills Too Late to Review USL = 183 C = 147 LSL = 111 MonthlyOperations Management Collect data on type of bill, claim handler, and root cause of why it was late. Operations Management / As Needed Paper Bills Too Late to Review 77% of too late to reviews MonthlyOperations Management Collect data claim handler and root cause of why it was late. Operations Management / As Needed Imaged Bills Too Late to Review 23% of too late to reviews MonthlyOperations Management Collect data on claim handler and root cause of why it was late. Operations Management / As Needed Cost Avoidance $690 Per Bill YearlyOperations Management Analyze cost avoidance by Vendor, Type of Treatment, Decisions, Dispute, Timely or Late Operations Management / Year End / Using Data Collection Strategy Used in Project