EQUIPPING THE HOSPITAL. EQUIPMENT PLANNING Development of method to assure that equipment provide adequate medical care of the patient. UTILISATION SURVEY.

Slides:



Advertisements
Similar presentations
Common/shared responsibilities between jobs.
Advertisements

THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Materials management & hscm OBJECTIVES Materials Management- basic introduction Materials Management- importance Materials Management-
Managing a Successful Mechanical System project Following design – what next?
Generation Business Line
Striving to exceed customer demands by delivering the best.
DPS 304 : Purchasing /Procurement Activities
Furniture, Fixtures and Equipment Guidance Document CLC-9 April 2014 for State Operated Campuses 1.
MANUALS for DEVELOPING EYE HEALTH INTERVENTIONS
25 TAC Quality Assurance in a licensed ASC
Facilities and Construction: Did you know your GPO can help?
Construction Methods and Materials Equipment Equipment.
Chapter 6 Total Quality Management Chapter Outline Quality imperative.
OverviewOverview – Preparation – Day in the Life – Earnings – Employment – Career Path Forecast – ResourcesPreparationDay in the LifeEarningsEmploymentCareer.
Types of Drawings University of Palestine Eng. Nagham Ali Hasan
E QUIPMENT PLANNING Mr.Mahboob Ali Khan MHA CPHQ USA HARVARD UNIVERSITY.
A Look Ahead on Green Building Innovation. Introduction  Industrialization has been coupled with increasing harmful effects to the environment in the.
CLINICAL ENGINEERING part(1) Dr. Dalia H. Elkamchouchi CLINICAL ENGINEERING part(1) Dr. Dalia H. Elkamchouchi CLINICAL ENGINEERING part(1)
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
CLINICAL ENGINEERING part(3) Dr. Dalia H. Elkamchouchi.
28 – 29 September 2011 Vedic Village Spa Resort Kolkata, India. Mohammad Dauod Khuram MD, MPH National Manager, Health Program Aga Khan Foundation, Afghanistan.
Technology Access In Post-Secondary Education Ron Stewart Managing Consultant AltFormat Solutions LLC.
Butler Tech / Colerain Career and Technical School.
EXISTED SITUATION OF HOSPITAL 1.Feasability of the hospital is necessary. 2.Construction Completed as informed. 3.Architectural Detay Drawings Completed.
ISO 9000 & TOTAL QUALITY ISO 9000 refers to a group of quality assurance standards established by the International Organization for Standardization.This.
Purchasing. Objective The basic objective of the purchasing function is to ensure continuity of supply of raw materials, sub-contracted items and spare.
Hospital Facility Managers Association of Delaware Valley.
HEPRO.US MEDICAL SUPPLIES & DEVICES Hepro.us is a company that distributes the following products: Medical disposable supplies: Syringes, Protective Drapes,
YOUNG PROFESSIONALS SEMINAR CIVIL ENGINEERING CHALLENGES Venue: CSIR International Convention Centre Gauteng Date: 22 November 2013 Presenter: Vikash.
Assessing the impact of a change management procedure on homecare medicines patients Michael Butterfield Specialist Technician for Homecare Medicines Jane.
By Vickie Kirkley, RN. Director of Materials Management/ Central Supply/ Central Sterile Job Requirements Career / Job Requirements Bachelor of Science.
1 Kenneth Osborne, 9/14/07 Inter Group communications at the Advanced Light Source. Overview of the different methods of communication between different.
Lucile de Comarmond Chief Pharmacist Workshop on Impact of TRIPS/IP on Access to Medicine September 2014.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Managing Construction Chapter 16. Contractor Projects are overseen by a contractor who owns and operates a construction company. Projects are overseen.
Unicare is dedicated to partnership and team work, a company that pairs the best of experience to the needs of Cosmetics & Health care products. the.
Process of Planning, Designing and Financing a Hospital
Adoption and Use of Electronic Medical Records (in Federally Qualified Health Centers) and Supporting an ASP Community Care Network of Virginia, Inc.
Materials are an essential resource to achieve the objectives of a health care organization. While about 60 per cent of the funds of health sector are.
Unicare is dedicated to partnership and team work, a company that pairs the best of experience to the needs of Cosmetics & Health care products. the.
KENYA NATIONAL BUREAU OF STATISTICS
Initiating Equipment PRs using ERP Process & Common Mistakes Dr. Khaled Al-Athel Director, Lab Technical Support Office.
PLANT LAYOUT. Definitions In the words of James Lundy, 'Plant layout identically involves the allocation of space and the arrangement of equipments in.
3rd WHO Prequalification Stakeholders Meeting :Diagnostics 3rd Stakeholders Meeting on Prequalification Geneva, 4th February 2008 Update on Prequalification.
Production and Marketing Management Discuss the development, manufacturing, and marketing of products/services.
R EGULATING THE IMPORTATION & USE OF MEDICAL DEVICES.
Rotary Global Grant Medical Supplies and Equipment for a Village Primary Health Care Center in South Sudan.
Health Science Career Pathways Judylyn Hobson RN 1 Objective 1.01.
Edexcel BTEC Level 2 Diploma in Construction Members of the Construction Team Unit 1 Structure of the Construction Industry.
BSJ 200/11/04 Presentation on Furniture Standards Furniture and Wood Products Incubation Project Bureau of Standards Jamaica, Training Room Presenter:
CLINICAL ENGINEER: PLACE, ROLE AND FUTURE CHALLENGES A Presentation To The 1 st Joint East African Scientific Conference (AMEK & UNAHME) By: Gordon A.
1. Engineering 2. Purchasing 3. Other department package assistances 4. Site supervision Instrument Department Activities:
Global Clinical Engineering Success Stories Establishment of National Health Technology Management System for Public Hospitals Name: Bilal BECEREN Affiliation:
Hospital Equipment Supplies & Suppliers in UAE
Making Health Facility Safe Through Facility Management
PROJECT COMMUNICATION PROCEDURE AND DOCUMENT MANAGEMENT
Operations Management
Lecture : Tasks and Responsibilities in the Management of Healthcare Wastes Which one do you want ? by Dr Mohammed Ali Al Zahrani.
PROCUREMENT DEPARTMENT
HOW BEST CAN WE MANAGE MEDICAL EQUIPMENT By Khalif D.Mohamud BMET-GCRH
QUALITY ASSURANCE OF PHARMACEUTICAL PRODUCTS IN RMH
Health Supply Chain Management: Session 6: Facilities, Staffing and Procurement Ghana Nursing Schools.
Ministry of Health Montenegro ERASMUS+ KA2 PROJECT:
World Health Organization
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
The Engineering and Maintenance Division
COMMITTEE ROOM M46, MARKS BUILDING CAPE TOWN
Planning and Designing a Hospital
Technical Specifications of Medical Devices
Purchasing Overview Purchasing Purchasing Activity
Presentation transcript:

EQUIPPING THE HOSPITAL

EQUIPMENT PLANNING Development of method to assure that equipment provide adequate medical care of the patient. UTILISATION SURVEY Study to find out the equipment are utilized optimally.

Equipment planning is done in two situations—at the time of establishing a new hospital and in an existing hospital setup. Equipment planning for a new project starts prior to the project. The selection of equipment is based on the scale of the hospital and its demands. The need for medical equipment varies with specialties and topography

WHOSE RESPONSIBILITY It is the responsibility of Hospital Administrator to determine all the items of equipments necessary, & then write their specification, recommended bids (tender) & purchase according to hospitals policy. It is adequate in quantity and of a quality that assures durability and performance The Architect is responsible for the Built in equipments.

MEDICAL EQUIPMENT PLANNER ROLE DURING THE DESIGN STAGE: To determine quantities, sizes of essential and complementary equipment. To determine electromechanical requirements for medical equipment. To provide technical specification of equipment.

DURING CONSTRUCTION STAGE: Review of shop drawing and on-site coordination requirement. Site survey and inspection Coordinate delivery schedule with contractors. Physical inspection, testing, installation supervision Coordinate training of end users by suppliers.

TYPES OF EQUIPMENTS (a) Built- in Equipments (b) Depreciable equipments (c)Non-depreciable equipments

BUILT IN EQUIPMENTS It’s the Architect’s Responsibility Included in construction contracts List includes: Cabinets & counters in Pharmacy Laboratory Other parts of hospitals Fixed kitchen Equipments. Sterilizers,

Boilers Dumb waiters Elevators Incinerators. Air Conditioning/Deep freezers Surgical lighting etc

DEPRECIABLE EQUIPMENTS The Equipments that have a life of 5yrs or more are k/a DEPRECIABLE equipments These large items of furniture and Equipments have a reasonable fixed location in the hospital building but are capable of being moved.

EXAMPLES OF DEPRECIABLE EQUIPMENTS Surgical Apparatuses Diagnostic & Therapeutic Equipment Lab & pharmacy Equipment Office Equipment : Typewriter, Intercoms ; Computers/Electronic exchanges Refrigerator Physiotherapy equipments Suction machines Diagnostic and Therapeutic Equipments. Like X-Ray machine, Cutlery, ECG machine Incubators

NON-DEPRECIABLE EQUIPMENTS These Equipments have life span less than 5 yrs low cost equipments. Examples are Kitchen utensils Surgical instruments Catheters Linen, sheets, Blankets Lamps, dust bins etc.

Drivers for equipment planning

The Need Be it a new project or an existing one, need drives the purchase of medical equipment. The need is known from the medical practitioners, the end users of the equipment. Depending on the patient flow, the demand for the equipment increases, which in turn creates a necessity for the equipment.

The Technology The second main driver in the purchase of equipment is the technology. In recent years, the healthcare industry is witnessing rapid growth, especially in research and development. Newer equipment is regularly introduced in the market with additional features and better technology. "Sometimes, the same equipment can be upgraded to the new technology by adding additional software,

The Service The next important aspect is the service rendered by manufacturers and vendors, both within the warranty period and afterwards. If the hospital is in a town or rural area, the proximity to the service centre should be considered.

The Price The equipment with best price is ultimately bought. "Best price doesn't mean the lowest price We analyze the price based on various factors like software and hardware package, technical specifications, after sales support, warranty and so on cost alone cannot be seen as critical for purchase. The quality of the product should meet our standards,

Training To keep oneself abreast of the latest technology is very important. To have excellent equipment but no skilled manpower to utilize it is as good as not procuring at all. "When it comes to training, we expect the vendor or manufacturer to assist technicians

EQUIPMENT PLANNING FOR Dental Department 1.Study the architecture and do NOMENCLATURE- clockwise or anticlockwise 2.Transfer the numbering to title sheet – INDEXING 3.List the number of equipment according to architect plan 4.Categorize the equipment 5.Pricing 6.Total the cost for each legend room

NOMENCLATU RE EXPLANATIO N ASSIGNING EQUIPMENT CATEGORISEPRICINGTOT AL COST OF LEGEND ROOM TOTAL COST OF DEPARTMEN T GFD1RECEPTION 1.Chairs 2.Table 3.cabnets GFD2TOILET1 1.Washbasin 2.Toilet seats 3.Toilet paper GFD3OPERATING AREA1 1.Dental chair 2.Dental Stool 3.Table 4.Chair 5.Air conditioner GFD4OPERATING AREA 2

NOMENCLATU RE EXPLANATIO N ASSIGNING EQUIPMENT CATEGORISEPRICINGTOT AL COST OF LEGEND ROOM TOTAL COST OF DEPARTMEN T GFD5OPERATING AREA 3 GFD6STERLISATIO N ROOM 1.Autoclave 2.Cabnets GFD7TOILET2 GFD8BREAK ROOM OR CANTEEN 1.Table 2.Chairs

NOMENCLATU RE EXPLANATIO N ASSIGNING EQUIPMENT CATEGORISEPRICINGTOT AL COST OF LEGEND ROOM TOTAL COST OF DEPARTMEN T GFD9MECHANICAL ROOM 1.Lathe 2.Almira GFD10STORAGE ROOM 1 1.Cabnets GFD11LAB 1.Hot water gyser 2.Autoclave GFD12STORAGE ROOM

NOMENCLATU RE EXPLANATIO N ASSIGNING EQUIPMENT CATEGORISEPRICINGTOT AL COST OF LEGEND ROOM TOTAL COST OF DEPARTMEN T GFD13DR ROOM 1.Table 2.Chair 3.Cabnets 4.cupboards GFD14TOILET 3 GFD15OPERATING AREA 4 GFD16OPERATING AREA 5

NOMENCLATU RE EXPLANATIO N ASSIGNING EQUIPMENT CATEGORISEPRICINGTOT AL COST OF LEGEND ROOM TOTAL COST OF DEPARTMEN T GFD17XRAY ROOM 1.X-ray machine 2.OPG GFD18OPERATING AREA 6 GFD19OFFICE 1.Cupboards 2.Table 3.Chair

Guidelines Required USFDA is one governing body that prescribes guidelines on equipment manufacturing. These guidelines are widely accepted in most countries including India. Other widely accepted certifications are ISO (International Organization for Standards), IEC (International Electro technical Committee) and CE certification from European Union. "These certifications are for the quality of the equipment.

Presented by: Arshpreet Kaur