The GMp Experiment in 2014 Vincent Sulkosky Longwood University for the E12-07-108 Collaboration Hall A DVCS Collaboration Meeting December 19-20, 2013.

Slides:



Advertisements
Similar presentations
Structure of the front-end DAQ for DIS PARITY in Hall A Bogdan Wojtsekhowski with Bob Michaels and Albert Shahinyan Jlab, 12/1/ 2006 The issues: e/pi rejection.
Advertisements

BigBite Wire-Chamber Status Report Brandon Craver University of Virginia Hall A Collaboration Meeting June 23, 2005.
Super BigBite concepts Bogdan Wojtsekhowski, JLab
Measuring the Neutron and 3 He Spin Structure at Low Q 2 Vincent Sulkosky College of William and Mary, Williamsburg VA Experimental Overview The.
Measuring the Neutron and 3 He Spin Structure at Low Q 2 Vincent Sulkosky for the JLab Hall A Collaboration College of William and Mary, Williamsburg VA.
Jin Huang PhD Candidate, MIT For MENU 2010 May 31, Williamsburg.
Run Plan Document E04-007: Threshold Pion Production.
E : HRS Cross Section Analyses Vincent Sulkosky Massachusetts Institute of Technology GMp Collaboration Meeting September 24 th, 2012.
Jin Huang & Vincent Sulkosky Massachusetts Institute of Technology Boson 2010 Workshop Sept 20, JLab.
G2P Target installation and Beyond. Schedule Pivot before.
Hall A Gmp / DVCS Fall preparation September 16 th 2014 Hall A meeting Alexandre Camsonne 1.
Manpower and Collaboration  Tasks  Commitments  Collaboration organization.
Update on the Gas Ring Imaging Cherenkov (GRINCH) Detector for A 1 n using BigBite Todd Averett Department of Physics The College of William and Mary Williamsburg,
Bogdan Wojtsekhowski, Jefferson Lab Experimental search for A’ for APEX collaboration 1.
E : (GMp) Precision Measurement of the Proton Elastic Cross Section at High Q 2 Vincent Sulkosky Massachusetts Institute of Technology for the.
E08-005: A y 0 in Quasi-Elastic 3 He(e,e’n) Scattering Elena Long Hall A Collaboration Meeting December 17 th, /17/2013Hall A Collaboration MeetingElena.
Min Huang Duke University, TUNL On Behalf of the E g2p collaboration Hall A Analysis Workshop, 12/12/12.
Update on Cryotarget System Jian-ping Chen GMn Collaboration Meeting, Feb. 24, 2014  Overview  Maintenance/Modifications During Down  Installation Status.
PAIR SPECTROMETER DEVELOPMENT IN HALL D PAWEL AMBROZEWICZ NC A&T OUTLINE : PS Goals PS Goals PrimEx Experience PrimEx Experience Design Details Design.
Status of Hall C 6 GeV Analysis Software Robust Fortran/CERNLIB code, “ENGINE”, for analysis of HMS/SOS coincidence and single arm experiments that has.
Hall A 12 GeV DVCS Status report December 16th 2013 Hall A collaboration meeting Alexandre Camsonne.
Improved beam line for Hall A layouts, present and proposed optics in altered region benefits of proposed layout costs of proposed layout conclusions.
Measurements of F 2 and R=σ L /σ T on Deuteron and Nuclei in the Nucleon Resonance Region Ya Li January 31, 2009 Jlab E02-109/E (Jan05)
Status of Hall C 6 GeV Analysis Software Robust Fortran/CERNLIB code, “ENGINE”, for analysis of HMS/SOS coincidence and single arm experiments that has.
Status of the Beamline Simulation A.Somov Jefferson Lab Collaboration Meeting, May 11, 2010.
2014 DVCS Run Preparations DVCS and GMP Symbiosis Charles Hyde.
Thomas Jefferson National Accelerator Facility Page 1 IPR October 18-20, 2011 John J. LeRose Independent Project Review of 12 GeV Upgrade Jefferson Lab.
Jin Huang M.I.T. For Transversity Collaboration Meeting Sept 24, JLab.
High Precision Measurement of the Proton Charge Radius A. Gasparian NC A&T State University, Greensboro, NC Outline  Previous experiments and proton size.
Short Range Correlation in 4 He E07 – 006 Update report presented to the Hall A User group meeting the Hall A User group meeting Igor Korover Tel Aviv.
Jin Huang M.I.T. Hall A Analysis Workshop Dec 14, JLab.
Vincent Sulkosky Massachusetts Institute of Technology Spokespeople: J.-P. Chen, A. Deur, F. Garibaldi Hall A Collaboration Meeting December 10 th, 2012.
Rosen07 Two-Photon Exchange Status Update James Johnson Northwestern University & Argonne National Lab For the Rosen07 Collaboration.
Jin Huang PhD Candidate, MIT For Hall A Collaboration Meeting June 10, JLab.
SHMS Optics Studies Tanja Horn JLab JLab Hall C meeting 18 January 2008.
Hall A DVCS calorimeter Operation Safety procedure September 18 th 2014 Alexandre Camsonne DVCS Readiness Review.
Precision Measurement of R L and R T of Quasi-Elastic Electron Scattering In the Momentum Transfer Range 0.55GeV/c≤|q|≤1.0GeV/c* Yan Xinhu Department of.
Preparation for E Pi0 Collaboration Meeting Tuesday Feb R.Lindgren.
E : (GMp) Precision Measurement of the Proton Elastic Cross Section at High Q 2 Vincent Sulkosky Massachusetts Institute of Technology for the.
Measurement of F 2 and R=σ L /σ T in Nuclei at Low Q 2 Phase I Ya Li Hampton University January 18, 2008.
March running preparation Alexandre Camsonne Hall A meeting February 28 th 2014.
Latifa Elouadrhiri Jefferson Lab Hall B 12 GeV Upgrade Drift Chamber Review Jefferson Lab March 6- 8, 2007 CLAS12 Drift Chambers Simulation and Event Reconstruction.
Vina Punjabi Norfolk State University Hall A Collaboration Meeting June 10-11, 2010 GEp-V Experiment to Measure G Ep /G Mp.
A Measurement of Two-Photon Exchange in Unpolarized Elastic Electron-Proton Scattering John Arrington and James Johnson Northwestern University & Argonne.
Lecture 9: Inelastic Scattering and Excited States 2/10/2003 Inelastic scattering refers to the process in which energy is transferred to the target,
Update on the Gas Ring Imaging Cherenkov (GRINCH) Detector for A 1 n using BigBite Todd Averett Department of Physics The College of William and Mary Williamsburg,
Transversity Readiness and Timeline Xiaodong Jiang, March 17th, This document specifies the overall readiness for Hall A experiments E06-010/E
MOLLER Collaboration Meeting May 2014 Hall A Update Thia Keppel 1.
Calorimetry for Deeply Virtual Compton Scattering in Hall A Alexandre Camsonne Hall A Jefferson Laboratory Workshop on General Purpose High Resolution.
GEp-III in Hall C Andrew Puckett, MIT On behalf of the Jefferson Lab Hall C GEp-III Collaboration April 15, 2008.
E & E status report Maxime DEFURNE CEA-Saclay/Irfu/SPhN 1.
E97-110: Small Angle GDH Experimental Status Report E97-110: Small Angle GDH Experimental Status Report Vincent Sulkosky Massachusetts Institute of Technology.
Vincent Sulkosky Massachusetts Institute of Technology Spokespeople: J.-P. Chen, A. Deur, F. Garibaldi Hall A Collaboration Meeting June 13 th, 2013 E97-110:
JLab, October 31, 2008 WACS in 12 GeV era 1 GPDs Wide-Angle Compton Scattering pi-0 photo-production in 12 GeV era B. Wojtsekhowski Outline WACS and other.
Highest Q 2 Polarized Measurement of the Electric Form Factor of the Neutron – E Presented by Jonathan Miller For the Hall A E Collaboration.
E97-110: Small Angle GDH Experimental Status Report E97-110: Small Angle GDH Experimental Status Report Vincent Sulkosky Massachusetts Institute of Technology.
JLab PAC33, January 16, 2008 Polarization transfer in WACS 1  p   p Polarization transfer in Wide-Angle Compton Scattering Proposal D. Hamilton,
Status of Hall C 6 GeV Analysis Software Robust Fortran/CERNLIB code, “ENGINE”, for analysis of HMS/SOS coincidence and single arm experiments that has.
G0 Backward Angle Request: Q 2 = 0.23, 0.48 GeV 2 Main points G0 goal is to measure G E s, G M s and G A e over range of momentum transfers with best possible.
Status of HRS Detectors Barak Schmookler DVCS - 12/19/20131.
Hall A Update Thia Keppel User Group Board of Directors January 2015.
Overview of Onsite Progress Jian-ping Chen g 2 p /G ep Collabroation Meeting.
Hall A Collaboration Meeting Slide 0 Measurements of Target Single-Spin Asymmetries in QE 3 He ↑ (e, e’) Update of QE A y (E05-015) experiment.
Understanding the 3 He Nuclei: Asymmetry Measurements in Quasi- Elastic Ge Jin University of Virginia For the E Collaboration.
Pb-Parity and Septum Update Presented by: Luis Mercado UMass - Amherst 12/05/2008 Thanks to Robert Michaels, Kent Pachke, Krishna Kumar, Dustin McNulty.
Jefferson Lab PAC 30 1 August 23, 2006 PR (Hall A) ● PR (Hall C) Measuring the Neutron g 2 and d 2 at 12 GeV PR (Hall A) ● PR
Bryan Moffit PAC32 Dry Run Precision Measurement of the Proton Elastic Cross Section at High Q 2 PAC32 12 GeV Proposal : PR Spokespersons:Bryan.
Precision Measurement of the Proton Elastic Cross Section at High Q2
Hall A Compton Electron detector overview
Special Considerations for SIDIS
Presentation transcript:

The GMp Experiment in 2014 Vincent Sulkosky Longwood University for the E Collaboration Hall A DVCS Collaboration Meeting December 19-20,

Outline  The GMp Experiment:  Goals and Physics Motivation  Equipment Updates  Target: cryo and wire target  Scattering Chamber and Restrictions  HRS Detector Packages  Beam Characterization  Charge (BCMs)  Energy (ARC, etc)  Preparation Status (See Barak’s Talk) 2

Introduction 3

Goals for GMp  Accurately measure e-p elastic cross section in kinematics similar to other JLab form factor measurements (Q 2 = 7-14 GeV 2 )  Improve accuracy of the cross section by as much as a factor of 5 (< 2%) over previous measurements  Key input to all form factors and many of other experiments, where elastic scattering is used for normalization  Approved for 24 PAC days 4

Kinematics PAC Approved 24 days 5

Expected Precision 6

Systematic Uncertainties SourcePoint-to-point Normalization Incident energy<0.3 Scattering Angle Incident Beam Angle Radiative Corrections* Beam Charge Target Thickness/Density Fluctuations Spectrometer Acceptance Endcap Subtraction0.1 Detector efficiencies/dead time Sum in quadrature Uncertainties give in Δ  /  (%) 7

Control of Systematics  DAQ and Trigger:  EDTM pulser for dead time measurements  Achieved 10 kHz with 20% dead time  Tracking efficiency: Use front chambers of FPP with VDCs  Target density  Use precise optics to provide software cuts on vertex  Use race-track cell targets with vertical flow to minimize fluctuations  Solid angle: a benefit of improved optics  Scattering angle: precise determination of target location using crosshair wire target 8

Modifications to Instrumentation  Strong arm wire target:  Design completed  Cost: $3k to $5k, saved $8k by using old radiator mechanism  HRS detector stacks:  Design completed  Add one chamber of FPP to both stacks  Attach S0 to FPP chamber  Shorten extension box for LHRS gas Cherenkov by 10 cm  Cost: $20k (mostly from labor, trying to reduce this cost)  Target scattering chamber  Design completed, components should be onsite.  Allows to run DVCS (LHRS) and GMp (RHRS) concurrently  Cost: ~ $50k 9

Critical Items: 1.Energy a.ARC measurement will be recommissioned in Spring 2014 b.Single Hall Spin Dance will not be attempted until later: Requires Compton and Møller polarimeters. c.Elastics may not be feasible, especially at the higher energies as a cross check. 2.Charge a.Standard Beam Current Monitor (BCM) electronics b.For Spring 2014, the original electronics will be used, while the Kharkov group: Check status, obtain experience, determine problems/issues c.The electronics will be upgraded to that used for QWeak. d.The Unser will also play a pivotal role in Hall A. Beamline

Wires:  0.5” apart along the beamline  1/16” (~1.6 mm) apart transverse to beam HRS Optics and Angle: Crosshair Target Wire target, reproducibility of 100 microns sufficient Design being changed by Dave Meekins, should be finalized early next year.

1.Collimator plate in front of Q1 2.Crosshair target Both will be carefully surveyed with a FaroArm Expect to achieve angle precision at 0.2 mrads. 3.BPM positions (~ 100 microns) 4.Front floor plates for spectrometers 5.Linear Variable Differential Transformers (LVDTs) are being revived, sensitive to mis-pointing offsets. Toward Precision Angle Measurements

New Narrow DVCS Support Stand 13

 Restrictions from scattering chamber design:  LHRS: 12.5 o to 18 o with calorimeter)  RHRS: o to 45 o with calorimeter)  DVCS calorimeter: < -20 o Angle Restrictions 14

Target Configuration 15  15 cm LH2  Large 3 inch cell  Vertical flow  Reduce density fluctuation  Large vertical acceptance requirement for DVCS (20 degrees)  Solid targets  less than 2% radiation length for March running  Standard dummy target (Al foil)  Standard optics target (5 foils )  Empty Updates from D. Meekins Expected for use in March 2014

HRS Detector Stacks Standard detectors with one plane of FPP VDCs Pion rejector Gas Cherenkov Fpp S0 16

Spokespeople: J. Arrington, E. Christy, S. Gilad, B. Moffit, V. Sulkosky, B. Wojtsekhowski Graduate Students: Longwu Ou (MIT) Yang Wang (W&M) Gautam Thir Narayan (Hampton Univ) Barak Schmookler (MIT) (potential student) Manpower

 HRS detectors/DAQ:  Longwu Ou, Barak Schmookler, Kalyan Allada (MIT)  Yang Wang (W&M)  Daniel Kirby (CMU)  Igor Rachek (Budhker)  Vincent Sulkosky (Longwood Univ)  Sergey Abrahamyan, Karen Ohanyan, Galust Sargsyan, Albert Shahinyan (YerPhy)  Alexandre Camsonne, Bogdan Wojtsekhowski, Robert Michaels, Bill Gunning, Jack Segal, Susan Esp, Chris Cuevas (JLab)  Online/offline Software  Longwu Ou, Barak Schmookler, Kalyan Allada (MIT)  Yang Wang (W&M)  Ole Hansen (JLab support)  Target  JLab Target group (D. Meekins et al.)  Jian-Ping Chen (JLab)  Simulations :  Eric Christy (Hampton)  Gautam Thir Narayan (Hampton)  Longwu Ou and Barak Schmookler (MIT) Manpower

Summary 19  Precise e-p elastic cross-section measurement at Q 2 up to 14 GeV 2  Progress made in preparing for the experiment:  Target design complete  Much work in the HRS (see Barak’s talk)  Detector checkout in progress  Angle measurement, survey plans, floor marks (plates)  Getting ready for Hall commissioning run in March, 2014  Full production run in Fall 2014!

20 DVCS-GMp Cooperation: Dual Running ( Note: This is an old slide but good to start a discussion) GMp and DVCS install together (except DVCS calorimeter) 1) GMp runs independently: a) Restrictions on HRS angles from vacuum chamber and DVCS stand b) Restrictions on HRS movement from DVCS cables and stand, HRS movement will require manual assistance 2) One week shutdown to install DVCS calorimeter 3) DVCS runs ~ 3 PAC months: GMp takes parasitic data with right HRs at large angles Stability of all parameters is a key criteria to achieve the required precision for GMp.

Backup 21

Systematic Uncertainties Source Δ  /  (%) Parameters Incident energy<0.33×10 -4 Scattering Angle Incident Beam Angle Radiative Corrections*0.3 Beam Charge0.31×10 -3 Target Density Fluctuations0.2 Spectrometer Acceptance mrad Endcap Subtraction0.1 Detector efficiencies/dead time0.3 Sum in quadrature Point to point uncertainties 22

Systematic Uncertainties 23

Already 1 FTE year has been spent on FPP FPP (front chambers) Problems: gas consumption > 50 l/h HV trips often due to gas, many dead wires/some electronics. Done: repair of dead electronics; built parallel gas distribution. Still to do: HV distribution in one PC; gas distribution should be as wide as a straw block; HV test wires. Recent: First chamber main work is completed; second in progress and expect completion in 1 month; hardware electronics not yet started. 24

VDC Improvements  Upgrade electronics to use 1877S, which allows sparsification  Replace aging A/D cards and reuse BigBite cards  Provide very good stability against oscillations and rate capability of 8 MHz (in full chamber)  LHRS and RHRS completed and tested  Software still needed for Fpp chamber and for cosmics checks 25

Gas Cherenkov Improvements  Reflectivity measurements of HRS GCC mirrors in progress  Both HRS mirrors completed  Two spare mirrors recoated and checked  Reflectivity is within a few percent of published results  In progress of checking relative response of PMTs and will replace those as needed; ~ 70 to test  Cosmic mirror calibration 26