Ontario School Boards 72 district school boards in Ontario Approximately 4,900 schools TDSB presently operates 551 active schools Approximately 11.3% of.

Slides:



Advertisements
Similar presentations
SHORELINE SCHOOL DISTRICT Site & Facilities Assessment September 22, 2008 SHORECREST HIGH SCHOOL.
Advertisements

Tam Valley School Modernization - Phase 1 Summer 2011.
UNIVERSITY OF ALASKA FAIRBANKS Capital Projects Update Admin Services Open Forum October 11, 2011.
Recent Bond Accomplishments. Bordeaux Elementary Remodel.
Facts about King County Metro Transit Area served …. 2,134 square miles Population served …. 1,884,200 Coaches …. 1,301 (907 diesel, 235 hybrid, 159 electric.
Oregon Housing and Community Services Oregon State LIHEAP Weatherization Program NASCSP Annual Conference and DOE WAP State Managers Meeting September.
Database Maintenance and VFA Presented by: 1. McCormick Facilities Management VFA 2 Detailed Facility Condition Assessment (FCA) School Facility Management.
PERFORMING EFFECTIVE BUILDING SYSTEM RECOMMISSIONING STUDIES Joseph J. Watson, P.E. Booth # 312.
Capital Projects Investments Levy Cycle Tom O’Brien – Facilities & Operations Director February 17, 2015.
Del Mar Union Schools Facilities Master Plan Update September 19, 2012.
Greenbush School Maintenance Calendar. JULY Week 1 ❏ Check clock systems ❏ Fertilize athletic fields ❏ Drag and roll baseball/softball fields ❏ Clean.
Raymond School District Raymond School Facility Assessment Executive Summary September 16, 2013 Eppstein Uhen Architects Eric Dufek, Senior Design Architect.
1 The three to five year plan Facilities Management Gary Stanley, Aptakisic Tripp School District 102 Richard Cozzi, ARCON Associates.
RENOVATION & ADDITION OPTIONS TORONTO DISTRICT SCHOOL BOARD NORTH TORONTO COLLEGIATE INSTITUTE REDEVELOPMENT STUDY.
Toronto District School Board Facilities Services Department North Toronto Collegiate Institute Status Quo.
Presented by Executive Director of Facilities Management Chuck Scott.
1 Penns Grove-Carneys Point Regional School District Budget Presentation May 5, 2014.
THE PRESIDENT’S FISCAL YEAR 2012 BUDGET REQUEST Federal Transit Administration.
Getting Green Building Automation. Why is Building Automation a Green Technology? There are programs starting all over the nation that focus on alternative.
3. The Roof Has Problems If the roof has water damage, it may be caused by old or damaged shingles, or improper flashing. It's cheap and relatively easy.
Stoughton Public Library Feasibility & Design Study Report by CBT January 28, 2011 Current Library Built in 1969Proposed Library for the Future.
Manage the Facility Condition Index (FCI)
2012 Planned Facilities Reconstruction Project. Planned Facilities Reconstruction Health & Life Safety Energy Conservation & Management Security Upgrades.
GUHSD CITIZENS COMMUNITY MEETING MARCH 24-26, 2015 Facilities and Capital Budget Overview This Presentation Will Be Posted On Our Website:
1 Penns Grove-Carneys Point Regional School District Budget Presentation May 4, 2015.
Public Schools of Petoskey Upcoming Millage Issues Election on May 8, 2012.
Reserve Study A Short and Long Term Budgetary Planning Vehicle
Health Infrastructure Renewal Fund HIRF Program LHIN and Hospital Teleconference October 25, 2013.
Facilities Condition Audit Summary of Findings Entech is a full-service Architectural/Engineering firm providing design, construction management, facilities.
MMSD Facility Assessment Outline Mission and Goals History –Building Construction Dates Facility Management Process –Previous 5 year Plan –Website –
Budget Goals From our 2010/11 Budget: “High levels of student achievement” “Reduced gaps in student achievement” This means our goal is to maximize resources.
Trinity Lutheran Church Major Maintenance Tuesday, February 17, 2015.
Capital Reserves. What are Capital Reserves? A separate account set up by the Association to fund large, non-annual repairs – Stormwater pond repair,
Capital Improvement Program for September 9, 2014.
County of Santa Barbara General Services Department Facility Condition Assessment Lessons Learned Greg Chanis, Assistant Director August 13, 2015.
Background Information The United States uses a lot of energy – nearly a million dollars worth of energy every minute, 24 hours a day, every day of the.
Week 6 The Energy Walk Through. Possible elements of a walk through Understand on-site information collection and listing of essential data for collection.
Ontario School Boards 72 district school boards in Ontario Approximately 4,900 schools TDSB presently operates 551 active schools Approximately 11.3% of.
FACILITIES MAINTENANCE PLANNING
MIDDLE TOWNSHIP PUBLIC SCHOOLS BOND REFERENDUM March 8, 2016 Bond Referendum BUILDING FOR OUR FUTURE.
1 Five Year Capital Improvement Schedule Lancaster County School District
Making Our Facilities Better Board of Directors Update – Wednesday, July 24, 2013.
MODERNIZATIONS “The First Five” Golden West Elementary Lathrop Elementary Lincoln Elementary Sequoia Elementary Shasta Elementary December 8, 2015.
Energy Conservation Building Upgrades Alma School District.
South Greenville Recreation Center and Park Master Plan.
Updated Facility Condition Assessment Prince George’s County Public Schools June 17, 2008.
MODERNIZATIONS MEASURE G OVERSIGHT COMMITTEE September 8, 2015.
Gates County Schools Maintenance Department Maintaining and Renovating Today’s Schools For Tomorrow’s Students.
SINKING FUND PROPOSAL OCTOBER 3, SINKING FUND ADVISORY COMMITTEE PURPOSE: DEVELOP A LIST OF RECOMMENDED PROJECTS FOR THE 2012 SINKING.
Prepared by: Adam Pugh May 10-12, 2016 FIMS/RE Annual Training.
Facilities Focus Group
Cuba-Rushford CSD Capital Project
Asset Planning & Optimization Capital Renewal Strategies
Facilities Condition Assessment And Capital Asset Management
Deferred Maintenance Deferred Maintenance
Capital Project Needs Assessment
Fall 2017 Update: Physical properties and sinking fund
VCSD Capital Project Forum
Dr. Joseph Meloche Superintendent of Schools Mrs
Plant & Facilities Department
Caryl School Open Hearing March 26, 2007.
FIVE YEAR CAPITAL FACILITIES PLAN (Five Year Plan)
UNION GROVE ELEMENTARY REFERENDUM
2018 Bond Review and Proposal
The Asset Management Journey for Building Assets
TSAG Overview Mission Vision Core Values Operating Principles.
Capital Outlay Workshop
Recent Bond Accomplishments
Understanding the Replacement Reserve
Community Practice Asset Management.
Presentation transcript:

Ontario School Boards 72 district school boards in Ontario Approximately 4,900 schools TDSB presently operates 551 active schools Approximately 11.3% of provincial total 1

Condition Assessment Program Initiated by Ministry of Education (EDU) for all school boards and authorities in Ontario Administered by VFA Canada Corp. (VFA) A Facility Condition Assessment is conducted for every eligible school in Ontario every 5 years Appendix A shows a summary of estimated costs to address renewal needs by system component 2

Appendix A - YEAR 2014 SYSTEMS Urgent PriorityHigh PriorityMedium PriorityLow PriorityTotal Brick work/ Structure $7,551,036$108,609,044$5,368,393$6,511,041$128,039,514 Roofing $242,216$26,158,388$149,200,220$15,242,791$190,843,615 PA systems $0$29,908,568$6,654,682$1,973,173$38,536,423 Transformers $4,701,192$2,675,955$753,087$0$8,130,234 Switch Gears $20,821,177$12,604,324$5,138,415$0$38,563,915 Plumbing $51,555$81,435,978$24,267,075$10,462,378$116,216,986 Plumbing Fixtures $0$30,185,540$13,470,769$4,448,208$48,104,517 Parking and Roadway asphalt $0$40,287,327$6,664,519$2,002,113$48,953,959 Playing fields $0$16,639,460$5,835,271$4,026,539$26,501,270 Boilers $64,519,349$11,343,283$5,328,765$0$81,191,397 Ceilings $0$88,985,474$22,594,108$9,738,768$121,318,349 Elevators $566,280$4,542,140$1,471,836$0$6,580,256 Exterior Doors $470,955$33,837,912$0$1,617,920$35,926,787 Exterior Windows $6,662,136$69,847,525$3,759,690$0$80,269,351 Fire Alarm $13,994,883$5,264,596$3,436,930$0$22,696,409 Floor Finish $0$82,428,204$23,913,242$9,945,836$116,287,282 Gym Floor $0$16,614,298$3,548,090$3,096,822$23,259,211 HVAC $213,361,024$337,032,966$65,341,770$45,976,740$661,712,500 Interior Doors $0$34,049,113$21,449,090$3,013,626$58,511,829 Interior Stairs $5,613,798$4,683,680$1,711,678$0$12,009,156 Lighting and Branch Wiring $250,068$187,038,039$85,017,029$47,216,853$319,521,990 Misc. Arch. $0$144,214,635$53,712,295$17,475,916$215,402,846 Other Site Work $0$13,183,947$4,155,957$1,314,817$18,654,721 All Other Systems $86,007,964$91,862,854$31,650,061$22,347,159$231,868,038 Total$424,813,633$1,473,433,250$544,442,972$206,410,700$2,649,100,555 3

Renewal Needs Backlog TDSB’s Renewal Needs Backlog is presently ~$3.3 billion based on VFA’s latest validation EDU funding increased to $75 million in 2014/15 EDU funding further increased to $156 million in 2015/16 Despite the increase in funding it is still relatively inadequate to address TDSB’s renewal needs backlog 4

Facility Condition Index (FCI) FCI Rating is a building industry standard for calculating facility condition and is the ratio of a facility’s renewal needs divided by its replacement value, expressed as a percentage 5 Ministry FCI CategoryFCI Category Range# of TDSB Schools GoodFCI < 10 %35 Fair10 < FCI < 30 %184 Poor30 < FCI < 65 %195 CriticalFCI > 65% % of TDSB schools are in poor or critical condition, including 19 with a FCI rating > 100% and only 6.8 % are in good condition

Report on American School Facilities A report entitled Reversing the Cycle of Deterioration in the Nation’s Public School Buildings (RCD) October, 2014, looked at the state of American schools A major finding of the report is that financially squeezed school districts made economic decisions that did not properly address the backlog of maintenance work which will actually increase the amount and frequency of much more expensive breakdown in the future 6

1.For the American Schools the data is based on 2010 statistics. 2.Shown in American dollars. 3.Total Ontario renewal backlog (~15 B) - TDSB (~ 3.3 B)/Total Ontario student population (~2.1 M) – TDSB ~ (.25 M) 4.The TDSB has 51 schools that are older than 95 years, including 7 that were built before Based on Auditor General of Ontario report December, Average for American Schools 1,2 TDSBAverage for Other School Boards in Ontario Renewal/Deferred Maintenance Backlog Cost/Student ($) 4,88313,299~6,325 3 Average age of School Buildings (Years) Comparison of TDSB to Other School Boards

RCD Report RCD report suggests that between 2% and 4% of the total replacement value of all schools should be set aside annually to replace capital systems and facilities Total replacement value of the TDSB schools as determined by EDU is ~ $7.4 billion 3% of that replacement total is ~ $222 million 2015/16 shortfall is ~ $66 million (based on the $156 million funding provided by the EDU in 2015/16) “The Ministry of Education estimated that it needs $1.4 billion a year to maintain schools in a state of good repair, based on industry averages. However, actual annual maintenance funding over the last five years has ranged from $150 million to $500 million.” (Auditor General of Ontario December, 2015) 8

Roofing TDSB maintains ~ 25 million sq. ft. of roofing Area equivalent to 387 CFL football fields During 2013/14 and first quarter of 2014/15 Facility Services has received 2208 notifications of school roof leaks By end of 2015, ~ 40% of TDSB’s roof portfolio remains urgently in need of replacement Require $30 million annually for the next 4-5 years 9

Heating Plants Approximately 130 schools are heated by steam boiler plants whose theoretical life cycle has been exceeded on average by more than 25 years Estimated cost to replace steam plant with hot water plant is $2-3 million per school 35 years to replace all existing steam plants at a rate of 3-4 projects ($10 million) per year 10

2015/16 EDU Renewal Needs Program Funding $112 million School Condition Improvement (SCI) funding 80% (~$90 million) is restricted to addressing major building components and systems 20% (~$22 million) can be used to address any locally identified renewal needs that are listed in the asset management database created by VFA ~$44 million renewal needs grant 11

SCI Restricted Funding ($~90 Million) Roofing$30 million Boilers$20 million Structural$15 million Mechanical Ventilation $10 million Windows $ 5 million Public Address Systems $ 5 million Fire Alarm Systems $ 3 million Electrical Systems $ 2 million 12

SCI Locally Identified Renewal Needs (~$22 Million) Barrier Free (per need)$5 million Parking Lots (per need)$5 million Field Restoration (per need)$4 million Interior (spread over 22 wards)$3 million Fascia (spread over 22 wards)$3 million Painting (spread over 22 wards)$2 million 13

Renewal Needs Grant (~$44 Million) Small projects to extend life of building component $14 m Unplanned Renewal $12 m Planned programs (Standard & Compliance, Urban Forest Management, Security, Energy Efficiency) $ 7 m Emergency/Health & Safety $ 5 m Admin Costs $ 3 m Data/Call Center$ 2 m Soil Remediation $ 1 m 14

Renewal Summary All health and Safety issues are dealt with The ~$3.3 billion backlog is not due to lack of attention by TDSB but rather lack of appropriate funding TDSB gets no capital funding for replacement of sports fields and play areas 15