Patricia Alafaireet Patricia E. Alafaireet, PhD Director of Applied Health Informatics University of Missouri-School of Medicine Department of Health.

Slides:



Advertisements
Similar presentations
Modern Systems Analyst and as a Project Manager
Advertisements

The Department of Energy Enterprise Risk Management Model
Sustaining and Spreading Change Mike Davies, MD Chief of Staff VA Black Hills.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 3.1.
1 INTERNAL CONTROLS A PRACTICAL GUIDE TO HELP ENSURE FINANCIAL INTEGRITY.
Clinical Information System Implementation Project Prepared for Clinical Affairs Committee December 4, 2002.
SUMMER 2005 JUNE Preparing an Organizational Change Management Plan Org Change Management Activities by Project Phase.
IT Governance and Management
Capability Maturity Model (CMM) in SW design
Health Informatics Series
ECM Project Roles and Responsibilities
Healthcare Facilities Incident Command ( Principles ) Tehran University of Medical Sciences School of Public Health Department of Disaster Public Health.
Understanding Multiagency Coordination IS-701.A – February 2010 Visual 2.1 Unit 2: Understanding Multiagency Coordination.
RENI PRIMA GUSTY, SK.p,M.Kes
Nursing management FUNCTION NURSING MANAGEMENT PROCESS
SCC EHR Workshop for Contractors: Implementation Considerations May 25, 2011.
Enterprise Architecture
Emerging Latino Communities Initiative Webinar Series 2011 June 22, 2011 Presenter: Janet Hernandez, Capacity-Building Coordinator.
NORMA GOMEZ, MBA, MSN, RN, CNN Unique Challenges for the Nephrology Professional in Managing Change.
Charting a course PROCESS.
1 Addressing Common EHR Implementation Problems June 18, 2010 Tammy Geltmaker, RN, BSN, MHA EHR Consulting Manager, Health Care Excel Bonnie Hollopeter,
Copyright Course Technology 1999
Component 10 – Fundamentals of Workflow Process Analysis and Redesign Unit 10 – Process Change Implementation and Evaluation This material was developed.
Organization Mission Organizations That Use Evaluative Thinking Will Develop mission statements specific enough to provide a basis for goals and.
Chapter 11 – Managing a Business
Software Project Management Introduction to Project Management.
Organize to improve Data Quality Data Quality?. © 2012 GS1 To fully exploit and utilize the data available, a strategic approach to data governance at.
Quality Directions Australia Improving clinical risk management systems: Root Cause Analysis.
Developing an Effective Ethics Program
IAEA International Atomic Energy Agency Reviewing Management System and the Interface with Nuclear Security (IRRS Modules 4 and 12) BASIC IRRS TRAINING.
Appendix A Project Management: Process, Techniques, and Tools.
Conservation Districts Supervisor Accreditation Module 9: Employer/Employee Relations.
Steps for Success in EHR Planning Bill French, VP eHealth Strategies Wisconsin Office of Rural Health HIT Implementation Workshop Stevens Point, WI August.
Kelly J. Harris SEARCH Deputy Executive Director
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
1. 2 Business Process Reengineering (BPR) “the fundamental rethinking and redesign of processes to achieve dramatic improvements in critical, contemporary.
Basic of Project and Project Management Presentation.
What is a Business Analyst? A Business Analyst is someone who works as a liaison among stakeholders in order to elicit, analyze, communicate and validate.
Project monitoring and Control
Holistic Approach to Security
1 Designing Effective Programs: –Introduction to Program Design Steps –Organizational Strategic Planning –Approaches and Models –Evaluation, scheduling,
Slide 1 Project Management Chapter 4. Slide 2 Objectives ■ Become familiar with estimation. ■ Be able to create a project workplan. ■ Become familiar.
3 1 Project Success Factors u Project management important for success of system development project u 2000 Standish Group Study l Only 28% of system development.
Visual 1.1 An Overview Multi-Hazard Emergency Planning For Schools UNIT 3.
McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved. 6-1 Chapter 6 CHAPTER 6 INTERNAL CONTROL IN A FINANCIAL STATEMENT AUDIT.
Copyright 2012 John Wiley & Sons, Inc. Chapter 5 The Project in the Organizational Structure.
Staffing and training. Objectives To understand approaches to the development of strategies and policies for staffing of a Regulatory Authority including.
Copyright © 2016 Wolters Kluwer Health | Lippincott Williams & Wilkins Chapter 18: Design Considerations for Healthcare Information Systems Chapter 18:
Unit 8.2: Effective Implementation Planning HIT Implementation Planning for Quality and Safety Component 12/Unit 81 Health IT Workforce Curriculum Version.
ORGANIZING IT SERVICES AND PERSONNEL (PART 1) Lecture 7.
A Guide for Management. Overview Benefits of entity-level controls Nature of entity-level controls Types of entity-level controls, control objectives,
This material was developed by Oregon Health & Science University, funded by the Department of Health and Human Services, Office of the National Coordinator.
Module 5 Session 5.2 Visual 1 Module 5 Refining Objectives, Scope, and Other Project Parameters Session 5.2 Reviewing the PAR and refining key project.
Fundamentals of Workflow Analysis and Process Redesign Unit Process Change Implementation and Evaluation.
Working with HIT Systems
Business Continuity Disaster Planning
Patricia Alafaireet  Lecture 2 – Implementation and go-live strategies Data conversion Communication Planning Downtime.
Workflow Analysis in Healthcare Lauren Gray, BSN RN October 7, 2015.
LECTURE 5 Nangwonvuma M/ Byansi D. Components, interfaces and integration Infrastructure, Middleware and Platforms Techniques – Data warehouses, extending.
Principles of Information Security, Fourth Edition Chapter 1 Introduction to Information Security Part II.
1 © 2007 Chapter 3 Strategic Planning for the EHR Migration Path.
Handbook of Informatics for Nurses and Healthcare Professionals Copyright ©2009 by Pearson Education, Inc. Upper Saddle River, New Jersey All rights.
3.1 Project Management – time and resources, staying on track
What is the Best Way to Select an EHR
MANAGEMENT of INFORMATION SECURITY, Fifth Edition
Disaster and Emergency Planning
Systems Analysis and Design in a Changing World, 4th Edition
The importance of project management
CLINICAL INFORMATION SYSTEM
Roles and Responsibilities of a Project Manager
Presentation transcript:

Patricia Alafaireet

Patricia E. Alafaireet, PhD Director of Applied Health Informatics University of Missouri-School of Medicine Department of Health Management and Informatics Columbia, Missouri 2

 Lecture1 - Concepts of implementation pre-planning Concepts of implementation preplanning and strategies for implementation Basics workflow analysis Basics of installation preparation

 Upon completion of this lecture, students will be able to:  Understand that implementation pre-planning is a necessity if adverse events are to be prevented and resources used most effectively.  Apply at least one workflow analysis tool and understand why the use of such a tool in imperative in successful technology implementation.  Discuss some of the many pre-installation issues involved in the use of technology and how the application of specialized tools can assist with addressing these issues.

 An implementation plan is almost always required, especially when the organization: Is installing new information technology Is not experienced in the use of technology Lacks experienced project management staff Needs to reduce the complexity of its planning efforts

 A blueprint of the organization  Implementation stages  Planning of interim solutions

 Selecting the team, the tactics and the technology  Risk evaluation (locating show stoppers)  Workflow analysis  Other preparation needed such as training 7

 Total failure= de-installation  Partial failure= installed but not all providers are users  Sustainability failure= EHR is implemented, but is never embraced and is later replaced  Replication failure= successful EHR implementation in one practice fails in similar practice [1] 8

 Executive Team  Clinical Team  Administrative Team  Technology Team[1] 9

 Roles is to guide organization through change  Key members of upper level administration  Daily involvement  Responsibilities include budgeting, hiring, conflict resolution, policies and procedures and organizational restructuring[1] 10

 Oversees standardization of clinical process  Carries out clinical workflow redesign  Addresses clinical polices and procedures  Includes open membership from nursing and medical staff [1] 11

 Addresses administrate policies and procedures  Responsible for leading change in charge capture, billing, job descriptions, and adding new staff 12

 Responsibility is to ensure technical infrastructure is sound[1] 13

 Have as many decisions to make as large practices and provider organizations  May lack critical expertise[1] 14

 Employ project management  Carry out extensive workflow redesign  Develop a realistic budget  Beware of gadgetry  Avoid serious mistakes Ensure teams have authority to act Hold vendors accountable [1] 15

 Get and keep motivated teams of 4-9 members  Appoint a project manager  Schedule regular meetings  Review budget  Review staffing needs  Set a timeline  Create a chart migration plan  Review security [1] 16

 Identify one or more champions  Ensure senior administration support  Use an experienced project manager  Utilize change management principles  Have clear measurable goals  Make sure users support these goals  Establish reasonable expectations  Make sure organization is functional [2] 17

 Redesign workflow  Improve processes rather than simply automate  Identify key data elements that must be consistently entered and enforce the entry  Utilize a phased implementation  Train everyone and then train more  Allow for flexibility is style  Avoid a Monday go-live  Lighten the load during go-live  Pick a vendor with an excellent reputation for user support  Develop and use “power users” [2]

 Don’t scrimp on IT infrastructure  Consider an application service provider (ASP)  Make sure to do adequate testing  Utilize expert IT advice  Maintain servers, interfaces, etc. on a daily basis  Back up your data daily at least  Have a disaster recovery plan and test it [2]

 A representation of the sequence of work steps  Visual diagram of a process or set of processes  An enabler of communications  A common view of the activities of the organization

 Tend to be rather simple, linear maps very similar to flowcharts  Show a series of steps, tasks or activities that have a distinct beginning or end

 Messaging and information sharing  Task Completion  Scheduling and resource management  Documentation support [5]

 Task redefinition  Adding tasks  Re-sequencing tasks  Reassigning tasks [5]

 Direct observation  The right level of detail [5]

 Context review  Identification of specific processes to be re-designed  Outlining of new processes and changes needed [5]

 One example: “Workflow Assessment for Health IT Toolkit” Agency for Healthcare Research and Quality Provides in-depth information about Workflow Educational presentations, Research materials Specific tools Examples of workflow analysis

 Communicating with stakeholders  Redesigning workflow  Creating a project plan  Developing a contingency plan  Conducting training [8]

 Tailoring software to meet needs  A way of ensuring system quality  A very detailed process

 Iowa Foundation for Medical Care “System Build Tool” 

 Implementation pre-planning is a necessity if adverse events are to be prevented and resources used most effectively.  Workflow analysis is imperative in successful technology implementation.  There are many pre-installation issues involved in the use of technology and the application of specialized tools can assist with addressing these issues.

 Complete reference list is available at the end of the slide set for Lecture #3