SPRING BOX. Using the following presentation assumes that individuals have a basic knowledge of construction. The user should be able to adjust measurements.

Slides:



Advertisements
Similar presentations
Sectional Assembly and Installation
Advertisements

Ceramic Tile Installation Step 5 – Install Tile TNC EDUCATION SERVICES, INC Instructional Design and Learning Management.
Interior Wall and Ceiling Finish
CASTING A CONCRETE WALL
Basic Setting Out.
Optimum Round Pool Instructions. Prepare the pool site Remove all the grass on a surface 2’ wider than the size of the pool Level the ground.
Breaking and Breaching. Tools Used Sledge hammers –Long and short handled Chisels Pinch point pry bar –“Crow bar” Hacksaw Handsaw Bolt cutter Flat head.
Slab constructed cup Flatten a lump of clay into a long shape as you will be rolling out a slab long enough to wrap around a tube form. Note: finished.
Reinforced Concrete QTO Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
BIODIGESTORES. Materials 1.1 PVC macho adaptor ½” 2.2 five gallon buckets with the bottoms removed 3.1 PVC hembra adaptor ½” 4.2 non-corrosive washers.
BalloonSat Construction Ideas and Suggestions. What is a BalloonSat? Functional Model of a Satellite Carried by Balloon to at Least 60,000 Feet Operates.
Method to fix wall tiles. Preparation All wall tiles to be immersed in water for 3-4 hours for better results. Some gap in between the rows to allow the.
Wrapping Anodes Back To Basics. If you’ve been using a cotton jacket material, you’ll want to use the cotton sleeving. If you’ve been using a polyester.
MINI BOX. STANDARD BOX MAGNUM BOX SPINDLE ASSEMBLY.
Unit 42 Floor Framing Floor Unit Resting on Sill Plates • Floor Unit Resting on Cripple Walls • Posts and Beams • Floor Joists • Subfloor • Floor Underlayment.
Masonry. Terms –F > 15-5 –Go thru all figures –Joints between brick = ¼ inch.
Ledgewood Farm greenhouse construction How do I Start? to I’m Finished!
Concrete
Foundation Systems.
Dr. Sophia Hassiotis.  Laboratory set up  Personal Protective equipment  Directions for mixing  Slump test  Cylinder casting  Cleaning up your station.
Chapter 4: Sheet Metal Forming
Introduction: Standard Test Method for Density (unit weight), Yield, and Air Content (Gravimetric) of Concrete –Apparatus –Sample –Procedure ACI Certification.
Monroe L. Weber-Shirk S chool of Civil and Environmental Engineering WFP Slideshow Photos from Water For People Projects Courtesy of Jody Camp Photos from.
New Mexico FFA Agricultural Mechanics Career Development Event Concrete and Masonry.
Chapter 18 Foundations.
TOOL: Radial Arm Saw NEXT STEP: Radial Arm Saw RESULTS: Finish Top Apron Pieces at 9” L x 4” W x ¾ “ Th PROJECT Square Plant Stand PART Top Apron # NEEDED.
CONSTRUCTING A FIVE CABIN LATRINE
Installation Presentation
Constructing Homes and Other Buildings
Advanced Scroll Ring. Designing the ring Decide on your pattern. You can do one from the previous slide, or you can come up with your own design. Determine.
Calculations On completion of this unit the Learner should be able to demonstrate an understanding of: The formula used to calculate: Areas Volumes Ratios.
Intro to Concrete 18.0 & 19.0 Class notes.
Installation. Indoor Unit Installation Typical Installation.
How to Build Your Playhouse. September 08, 2006 By Kay Adams, Tamecha Buck, Janet Herron & Lisa Weston “Click on pictures”
Preparing Foundations for Cylinders & ASME Tanks
Scratch Build a Water Tower
Wood Construction CTC-375.
Lifter Step-by-step assembly instructions (c) 2010 National Fluid Power Association.
Design Studies 20 ‘Show Off’ Project How to make a computer monitor In Google Sketchup By: Liam Jack.
How to Build a Divider Wall By Charysse Roberson.
Build a Simple Electric Motor Uses a stator made of windings, an armature with two coils, and a commutator.
 Step 1: Digging the Hole  First dig yourself a good hole. I had a look at pond liners that were available first and knew that I could get one that.
Surface Area & Volume.
Retaining Wall Construction Building A Block Retaining Wall Developed by: Dr. Teri Hamlin Georgia Department of Education.
Monolith Collection and Preparation For soils without restrictive layers Conrad Neitsch USDA-NRCS MLRA Region 9 Staff Temple, TX.
MATTING. REMEMBER… Matt Board is expensive. Measure twice, cut once. Lay your matt board on something clean… on newsprint for example, NOT the floor!
Making A Paper Bag Cover Cut open a brown paper shopping bag, the kind you get at the grocery store. Start by cutting down one corner, from top to bottom,
COMPONENT IDENTIFICATION AND INSTALLATION GUIDELINES FLOODBREAK, AUTOGATE FloodBreak, L.L.C Post Oak Blvd., Suite 5850 Houston, Texas
Footings & Foundation Prepared By: (Vanani Sanket) Department of Civil Engineering B.H.Gardi College of Engineering & Technology.
VIEW SERIES with Sliding Door
Leads Institute of Technology & Engineering
Foundation – jay Desai.
Eps: Campus rainworks challenge
CONSTRUCTION OF A DTF DO’s and DON’Ts.
BUILDING CONSTRUCTION
Planning and Placing Concrete
Step-by-step assembly instructions
SeminAR ON LINTELS --SANTHOSHKUMAR.M..,.
Step-by-step assembly instructions
Building Construction I Sofia Sebastian 1
Step-by-step assembly instructions
Step-by-step assembly instructions
Running moulding on a bench
Wrapping Anodes Back To Basics
BIODIGESTORES.
Step-by-step assembly instructions
“Measurement and Geometry” Math-8 SOL Review Packet
Step-by-step assembly instructions
Step-by-step assembly instructions
Presentation transcript:

SPRING BOX

Using the following presentation assumes that individuals have a basic knowledge of construction. The user should be able to adjust measurements and quantities depending on their specific site requirements. The exact measurements will depend on the site specific design criteria, but at a minimum, the spring box should have three PVC pipes exiting the box (one for the main line, one for future expansion, and one overflow) and an access door. Cement should be mixed to local specifications depending on the type of materials available. Disclaimer

Materials 1 tube (6m) PVC pipe The size of pipe will be a function of the flow from the spring Three or Four PVC elbows of size equal to tube 2 lbs of tie wire 100kg of 3/8” reinforcing rods (rebar) Twenty (20) x 50kg bags cement 2 cubic meter sand 2 cubic meters gravel 5 cubic meters large stone (15+ cm diameter) 1 lb of 2-1/2” nail 1 lb of 4” nails Three (3) wood boards 10” x 3/4” x 12’ Six (6) wood boards 2” x 4” x 6’ One (1) wood post 3” x 3” x 6’ One (1) 2” bronze lock for access door

Once the spring has been identified, determine a convenient location to build the spring box wall. In this case where the banks of the pool narrowed into a stream. clear away as much of the rocks and foliage as possible, both within the spring pool and the surrounding banks. Getting Started

It is important to have several areas flattened for work A flat area, approximately 2.5m, in diameter will be needed for mixing concrete Space should be cleared to store sand and gravel The area where the spring comes to the surface should be dug out, flattened, and all large stones (greater than 10cm diameter) should be removed Getting Started

Site Preparation Flatten an area for mixing of concrete Remove all stones and level the area Where the spring surfaces Sand storage area Gravel Storage Area

Once the spring has been cleared of debris, begin to fill it with rocks, starting from the spring source Spring Source Spring cleared of all debris and made level, ready to place stones Getting Started

Preparing the Spring Spring Surfaces, water flows in this direction

Preparing the Spring Spring Surfaces, water flows in this direction Fill this area with stone An area should be left clear in this location approximately 1m x 1m x 0.7m depth. This space will be used to construct a box where water will collect before exiting the box.

Continue to fill the spring with large stone (15cm-50cm diameter) until the area is filled and matches the contours of the surrounding land Preparing the Spring

Dig two trenches on either side of the spring to be filled with cement. The “wings” will serve to capture groundwater into the spring box The “Wings” Trench or “Wing”

Trenches dug to either side of the spring Try to maintain a 40cm to 50cm width for the trench. It is okay if the trench becomes wider. Sometimes it is necessary to widen the trench to remove large stones.

“Wing” or trench Next slide shown looking into trench

If possible, continue digging away from the spring until water is no longer seeping in from the end of the trench here Water should not being seeping in from this wall Spring source

Layout 1m As Needed This area should be flat and free of any large stones Spring Surfaces, water flows in this direction PVC pipe exiting the spring box with elbow turned upwards at this end

Constructing the spring box wall

Spring Box Wall Locations Concrete Trench Build a mold that will fit inside the trench and across the front wall of the spring box The form should provide a wall thickness of at least 10cm A rebar frame should be built that will fit inside the form It will be placed in the center of the mold, allowing 5cm clear cover between the form walls on all sides Front Wall

 Attach the rods using small pieces of metal wire, ensuring that once tied, there are no sharp tails left.  For rods that are parallel to each other, a simple wrap round and twist with a pair of pliers, will be sufficient How to Tie Rebar

 For rods that are perpendicular to each other use an “iron workers knot “ illustrated in the pictures opposite. How to Tie Rebar

Construct a wooden form for the spring box wall. It should be large enough to span the three sides of the spring box. The form for the front wall should have holes cut in the center at the bottom of the form to allow PVC Pipe (minimum 3 tubes) to fit through Construct the rebar frame to fit inside the form Leave holes in the bottom of the frame for PVC Pipe (minimum 3 tubes)

Rebar Wall Frame (Plan) 1m As Needed The rebar frame should be built to fit inside the wooden form, matching the contour of the trenches 5cm clear cover should be maintained between rebar and wooden mold for concrete

Rebar Wall Frame (Elevation) Space left open for PVC tubing Maintain 10cm spacing, number of bars will vary

Rebar Wall Frame Trench Area dug out, stones removed, then refilled with stone (15-50cm diameter) Hole in place for tubing

Place the form walls across the stream Insert the rebar frame within the form walls, ensuring that the holes through which the tubes will fit, are aligned

Insert the at least three tubes through the holes. The tubing will have a 90 ° elbow attached to the end contained within the spring box.

One tube will be used as an overflow. Be sure this pipe sits with the top of the elbow (where water will enter) at least 10cm above the other tubes. You may need to place sand or pebbles under them to ensure this is the case. Block gaps left between the tubes and the hole cut into the mould walls. In this case, empty cement bags were used.

Ensure that the mould walls are supported so they do not collapse under the weight of the cement Remaining wood boards can be used and stones are make good supports

Pour dry cement into the bottom of the form to absorb standing water Now, add wet cement until the mould is full The mix should be 3 parts gravel to 1 part sand to one part cement by volume

Preparing the Spring Spring Surfaces, water flows in this direction This area filled with stone Place rocks in order to create a box 1m x 1m x 0.7m depth. Water will collect in this area before exiting the spring capture box.

Continue to add rocks to create a box The dimensions should be approximately L 1m x W 1m x D 70cm

Build the roof over the pool to the same level as the surrounding rocks Be sure to score the wood in the area of the access door You must be able to break out the wood in this area with a hammer See following slides for more information

Place a box with the dimensions of 30cm x 30cm x 30cm over the roof of the tank, above the tubing, to provide space to insert the access door The wood in the area under the form should be precut along the edges of the access door The roof will be covered with concrete except in this area. The precut sections of wood can be knocked out with a hammer after concrete has sufficiently cured The door will lift off from this spot, and you must be able to enter the spring box from this spot.

Rebar Roof Frame Access Door Form in Place Trench Rebar Roof frame in Place

Rebar Roof Frame (Front View) Access Door Form in Place Trench

Rebar Roof Frame (Plan) Maintain 10cm spacing, number of bars will vary

Rebar Roof Frame (Elevation) Maintain 10cm to 20cm spacing, number of bars will vary Maintain 20cm spacing, number of bars will vary

Reinforce the roof with rebar Tie bars together with wire to form a grid. The grid will extend out over the surrounding rocks, but need not cover the whole area

Attach iron rods over the roof of the tank, forming a semi circle surrounding the trap door. This semi-circle will form a wall to prevent contaminated run-off entering through the trapdoor. Flatten any rods from the metal frame that are protruding from the wall mould

Fill any gaps between the wooden roof supports and the rock bed. Cover the roof support and rock bed with water, to allow the cement greater adhesiveness

Cover the entire roof of the tank and rock bed with cement. Use wooden planks to surround the tank to ensure a neat finish. Some concrete should be added around the perimeter of the future access door to create a ridge The access door will fit over this raised section

Attach rebar horizontally across the rods shaped as a semi-circle. Cut wood and attach them to the semi circle to form a mold Leave a gap of 10cm between forms to fill with concrete

Once the cement has dried, the moulds can be taken off the tank. The front of the tank will need a layer of grout to leave a finished surface. A mix of 2 parts sand to 1 part cement will be used.

The Access Door A form should be placed over the box where water collects before exiting the spring capture box The access door will allow for periodic cleaning and maintenance of the spring capture box. The following slides show how to construct a lid for the box.

Rebar should be equally spaced at 10cm apart The wood form should have inside dimensions of 35cm x 35cm x 10cm Maintain 5cm clear cover between form and rebar

To make the access door to the spring box first create a 30cm x 30cm form. Add rebar as shown, maintaining 5cm clear cover around the perimeter Pour concrete to top of form (10cm) A handle, made of rebar, may be added at the center by tying a rectangular section of rebar to the center square of bar created