North Coast Wind Farm Tolano Environmental Consulting
Project Scope Offshore wind farm proposed by Wind Energy Group. 115 wind turbine generators with a plant capacity of 396 megawatts (MW). Electricity will power 38,000 homes.
Project Scope On-site construction works will take place over three summers from 2013 to Towers embedded in sea floor. 20 metre water depth at site. 2 days installation time per tower.
Our Role TEC contracted to monitor effect of construction on sea life 2 senior biologists assigned to project $600,000 revenue for TEC Field work: 50% of time Our first wind farm contract!