1 Status of SB2009 Rebaselining Proposal Document and Feedback from PMs + Editor This version includes the touch ups applied during the AD/I webex meeting.

Slides:



Advertisements
Similar presentations
CLIC Energy Stages D. Schulte1 D. Schulte for the CLIC team.
Advertisements

N.Toge on SB20091 SB2009 Rebaselining Proposal Document - How do we get it done? /10/2 N.Toge (KEK) for SB2009 Efforts.
 IANA Stewardship Transition Cross Community Working Group (CWG) on Naming Related Functions CWG RFP 4 Transition Implications.
Positron Source Update Jim Clarke Deepa Angal-Kalinin James Jones Norbert Collomb At Daresbury Laboratory and Cockroft Institute 21/07/2009.
TLCC Themes BAW-2, SLAC, 19 January 2011 Ross Walker Yamamoto 1.
Nick Walker Marc Ross Akira Yamamoto GDE PAC Prague TDR Plans and Scope.
Damping Rings Baseline Lattice Choice ILC DR Technical Baseline Review Frascati, July 7, 2011 Mark Palmer Cornell University.
D. Peterson, “WWS R&D Panel Project Registry”, ALCPG, Snowmass, 20-August World Wide Study Detector R&D Panel Project Registry Web Site web site:
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
Advanced Research Methodology
1 Status of SB2009 Rebaselining Proposal Document, Known to the Editor As of vers.A N.Toge Check:
2011 Damping Rings Lattice Evaluation Mark Palmer Cornell University March 8, 2011.
SB2009 Triage B1 SB2009 Triage Summary B N.Toge.
Your project title here Your name Construction Management University of Houston PROGRESS REPORT Reporting Period: From date – To date.
ILC CFS AD&I Daresbury Lab Summary J.Osborne / V.Kuchler / A.Enomoto.
John Carwardine 1 TDR Editorial WG Summary Global Design Effort John Carwardine.
SCRF Monthly WebEx Meeting June 30, 2010 Agenda 1.Report from PMs (5 min.) 2.General Report from Group Leaders(15 min.) 3.Special Discussions 1.TDP R&D.
Experimental Research Methods in Language Learning Chapter 16 Experimental Research Proposals.
Proposed machine parameters Andrei Seryi July 23, 2010.
RDR Report Writing Nan Phinney SLAC for RDR team of editors.
Controls & LLRF ILC Controls Telecon August 17, 2006 John Carwardine RDR Report Writing.
Baseline Workshop Preparation At the close of each BAW, we would like to write down a summary that is based on our common understanding of the issues.
Nick Walker Marc Ross Akira Yamamoto 2010 (and beyond) Plans & Milestones.
RDR Report Writing Nan Phinney SLAC. 7/20/06 VLCW06 Global Design Effort 2 GLC Report Working model is the 2003 GLC Report ch 4-7
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Date Event Global Design Effort 1 ILC UPDATE Vancouver to Valencia Ewan Paterson Personal Report to SiD Collaboration Oct 27, 2006.
Global Design Effort 1 Possible Minimum Machine Studies of Central Region for 2009 Reference, ILC Minimum Machine Study Proposal V1, January 2009 ILC-EDMS.
John Carwardine 22 June 2012 TEB webex meeting. Agenda Management items (John) –General updates, status of submissions –Principle Editor assignments for.
SB2009/ Low energy running for ILC International Workshop on Linear Colliders 2010 Andrei Seryi John Adams Institute 19 October 2010.
Status of ILC BDS Design Deepa Angal-Kalinin ASTeC/Cockcroft Institute, Daresbury Laboratory Andrei Seryi SLAC National Accelerator Laboratory ILC-CLIC.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
Mtivity Client Support System Quick start guide. Mtivity Client Support System We are very pleased to announce the launch of a new Client Support System.
BCD Status: Strengths and Weaknesses Tor Raubenheimer.
Philip Burrows SiD meeting, Chicago 15/11/081 Progress on the LoI Philip Burrows John Adams Institute Oxford University Thanks to: Hiro Aihara, Mark Oreglia.
1 Status of SB2009 Rebaselining Proposal Document and Preview of Feedback from PMs + Editor Draft C N.Toge.
EM Report1 Report from Engineering Management Group to GDE EC 2007/12/12 Report by N.Toge.
Damping Ring Parameters and Interface to Sources S. Guiducci BTR, LNF 7 July 2011.
CENG 476 Projects 2014 (10’th November 2014) 1. Projects One problem for each student One problem for each student 2.
AS TAG Leaders Meeting PM Report. Topics R&D Plan release 4 ADI WebEx meetings (cost and design) Central region integration face-to-face meetings.
Nick Walker AD&I WebEx Meeting TeV Upgrade Study AD&I WebEx Meeting Nick Walker 1 Brief summary of ALCPG’11 discussions.
Ian F. C. Smith Writing a Journal Paper. 2 Disclaimer / Preamble This is mostly opinion. Suggestions are incomplete. There are other strategies. A good.
CFS / Global – 04 Aug, 2010 PM Report: SB2009: –ADI meeting 23.07: Parameter tables with low energy / low power operation –BA Workshop Planning CFS participation.
ILC Damping Rings Electron Cloud Working Group Meeting Introduction S. Guiducci (LNF) ECLOUD10, Cornell 13 October
Minimum Machine Definition: Next Steps Nick Walker AS TAG leaders meeting
Foundations of Constraint Processing, CSCE421/821 Guidelines for reports1 Problem Solving with Constraints CSCE421/821, Fall
Beam Dynamics WG K. Kubo, N. Solyak, D. Schulte. Presentations –N. Solyak Coupler kick simulations update –N. Solyak CLIC BPM –A. Latina: Update on the.
CLIC Energy Stages D. Schulte1 D. Schulte for the CLIC team.
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
Physics Questions Committee Status Report Brian Foster (Oxford & GDE) SB2009 Meeting DESY 2/12/09.
Workshop Overview What is a report? Sections of a report Report-Writing Tips.
Date Event Global Design Effort 1 CCB Report GDE Meeting, Vancouver, July, 2006 Nobu Toge KEK/GDE.
Introdcution to Workpackage/Activity Reflection D. Schulte.
Tor Raubenheimer KEK Mtg Goals KEK January 19 th, 2006.
Accelerator Systems TAG Leaders’ Meeting PM Report –Planning for ALCPG –TDR preparations: Area System Baseline Technical Reviews –Recent e+ workshop experience.
Jan Low Energy 10 Hz Operation in DRFS (Fukuda) (Fukuda) 1 Low Energy 10Hz Operation in DRFS S. Fukuda KEK.
WebEx meeting November 17, 2009 ILC Damping Ring Working Group on Electron Cloud LC e- cloud Working Group November 17, 2009.
2011 Damping Rings Lattice Evaluation WebEx Meeting May 24, 2011 Mark Palmer Cornell University.
PM Report AS ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design –Marc.
2011 Damping Rings Lattice Evaluation Mark Palmer Cornell University March 20, 2011.
SB2009 Triage A1 SB2009 Triage Summary A N.Toge.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
RD’s Report SiD Group Sakue Yamada December 14, 2011 (remote participation) 2011/12/141SiD-meeting Sakue Yamada.
TLCC Themes BAW-2, SLAC, 19 January 2011 Ross Walker Yamamoto 1.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
ML-SCRF: Monthly WebEx Meeting April 4, Reports from PMs (20 min.) GDE activity and meeting plan Summary document of SCRF-Baseline Technical Review.
TDR Technical Editorial Board Webex meeting, 16 th Dec 2011 Report from the Chair (John) Technical Editing reports (Benno, Maura) Review of TDR Outlines.
Technical Design Report preparation
CS 8532: Advanced Software Engineering
ILC - Global Design Effort
CDR2 – Injection System Injection system overview (Seeman) (2 pages)
Presentation transcript:

1 Status of SB2009 Rebaselining Proposal Document and Feedback from PMs + Editor This version includes the touch ups applied during the AD/I webex meeting vers.D N.Toge

2 What this thing is This is the first (or second?) feedback from the PMs and the editor, concerning your initial (or revised) draft as you find at Let us go through this at this webex meeting (2009/11/5), so that, Each of us would know what content issues to address before our next encounter. –BTW, our next deadline is the end of 2009/11/20, where everyone is expected to have submitted “substantially complete” drafts to the editor, addressing the issues identified here, –so that a major editorial organization work can ensue, before the December DESY meeting.

3 Template: Section Title () Outline on the web? Zeroth draft on the web? System / Layout description? Tables / Illustrations? Risks / Implications / Open Design Issues / Plans description? Cost implications? Remarks –Title colors GREEN = Fairly advanced for this stage BLUE = Reasonable for this stage MAGENTA = Items which need attention. RED = Items which need some work.

4 Introduction (PMs) Outline on the web? –Sort of Zeroth draft on the web? –Sort of Remarks –Still need writing and elaboration

5 SB2009 Overview (PMs) Outline on the web? –Barely Zeroth draft on the web? –Barely Remarks –The following has to be articulated more clearly Low-current luminosity issues Low-energy operation Low-current  high-current transition, i.e. upgrade –For now, it’d be safe for everyone to assume that the parameter table in the summary of the DESY meeting in May is “it”.

6 SB2009 Layout (PM + Paterson) Outline on the web? –No Zeroth draft on the web? –No Remarks –Need to clarify our position on the beamline length issues at this moment (e.g, to give a solution case, or work plan, etc)

7 Parameters (PMs + Toge) Outline on the web? –Sort of Zeroth draft on the web? –Barely Remarks –Latest reference is the last table in –Need more work / writing

8 Gradient Issues (Yamamoto) Outline on the web? –Yes Zeroth draft on the web? –Yes Remarks –MCR and NKT need to read

9 Injectors / Sources - Electrons (Brachmann) Outline on the web? –Yes Zeroth draft on the web? –Yes System / Layout description? –Yes Tables / Illustrations? –Yes –Need to mark up the (minor) changes wrt RDR. Risks / Implications / Open Design Issues / Plans description? –R/D issues: Yes –Need an itemized list (or a tabulation) of design issues to pursue? Cost implications? –TBC Remarks

10 Injectors / Sources - Positrons (Clarke) Outline on the web? –Yes Zeroth draft on the web? –No. Still waiting. System / Layout description? –No Tables / Illustrations? –Not yet Risks / Implications / Open Design Issues / Plans description? –Not yet Cost implications? –TBC Remarks

11 Damping Rings (Guiducci) Outline on the web? –Yes Zeroth draft on the web? –Yes System / Layout description? –Yes Tables / Illustrations? –Yes Risks / Implications / Open Design Issues / Plans description? –Yes –Is the D.A. issue known to be OK, in terms of particle yield (in particular for posis)? If so (or not), please make a more substantial statement, if possible. –SB2009 vertical is somewhat smaller than that of RDR --- diff is in the transport –When making comparison with the previous design we should do so with respect to RDR, not TILC08. –BTW lumi upgrade description might go elsewhere in the editorial process. So, beware please. Cost implications? –TBC Remarks

12 RTML (Solyak) Outline on the web? –Yes Zeroth draft on the web? –Yes System /layout description? –Yes Tables / Illustrations? –Yes –Would be good to have a tabled comparison with RDR Risks / Implications / Open Design Issues / Plans description? –Introductory motivation can be worded more strongly and upbeat. –200 micron bunch length no longer supported – Eveyone please, confirm, that this is OK. –When making comparison with the previous design we should do so with respect to RDR, not TILC08. –SB2009 vertical is somewhat smaller than that of RDR We’d like to be sure that that is OK,and would like to see some statements in RTML section. –No need to quote FTEs when talk about future plans. Cost implications –TBC Remarks

13 KCS (Nantista) Outline on the web? –Yes Zeroth draft on the web? –Yes System / Layout description? –Yes Tables / Illustrations? –Need illustrations (unit concept, system layout) –Need tables (system params, component params, RF power accounting including LLRF aspects) Risks / Implications / Open Design Issues / Plans description? –Consistency with the reduced beam power case –More itemized description desirable. –Statements filled in on thermal implications wrt cooling requirements in the latest draft –Need statements on R&D + system validation plans Cost impacts? –TBC Remarks

14 DRFS (Fukuda) Outline on the web? –Yes Zeroth draft on the web? –Yes System / Layout description? –Yes Tables / Illustrations? –Illustrations updated in the latest draft ( ) –Need tables (system params, component params, RF power accounting including LLRF aspects) Risks / Implications / Open Design Issues / Plans description? –Consistency with the reduced beam power case –More itemized description desirable. –Need statements on implications wrt cooling requirements. –Need statements on R&D + system validation plans with more contents Cost impacts? –~yes Remarks

15 BDS (Seryi) Outline on the web? –Yes Zeroth draft on the web? –Yes System / Layout description? Tables / Illustrations? –Appreciate the good drawings on BDS beamline Risks / Implications / Open Design Issues / Plans description? –Luminosity discussion requires more refinement. –Same for collimation. –“Attack plans” and “open issues” need to be described more specifically. Cost impacts? –TBC Remarks

16 CFS (Kuchler) Outline on the web? –Yes Zeroth draft on the web? –Yes System / Layout description? –Yes Tables / Illustrations? –Draft illustrations prior to ALCPG, yet not part of SB2009 proposal doc –Must identify key illustrations to use, and circulate them. Risks / Implications / Open Design Issues / Plans description? –Seen refined statements in the latest draft ( ) on The notion that the single-tunnels can accommodate the expected hardware components. Single-tunnel power/cooling issues Single-tunnel safety issues Single-tunnel installation schedule issues, is possible. If not, identify this as an open issue to pursue during TDP2. 2D drawings and activities to follow –2D drawings be readied by Friday 11/06 end –Check to be done by AGLs that they are “reasonable” by Wed 11/11 –If the desires high and the situation allows, some AGLs may proceed to produce implementation figures Cost impacts? –~ yes Remarks

17 Costing (Garbincius) Outline on the web? –Yes Zeroth draft on the web? –Yes Methodology discussion? –Yes Tables / Illustrations? –WIP Remarks –The Comparison to show is a comparison with respect to RDR, not TILC.

18 Risk Analysis (Ross) Outline on the web? –Soon Zeroth draft on the web? –RSN Methodology description? –No Tables / Illustrations? –No Remarks

19 Availability Analysis (Ross) Outline on the web? –Yes Zeroth draft on the web? –Yes Methodology description? –Yes Tables / Illustrations? –Yes Remarks –One section still missing.

20 Conclusions Hope that we have identified key content issues to address immediately, … in addition to the ordinary word-smithing and preparatory work for illustrations and tables. We are asking you please to strive to submit your next, refined, advanced-stage draft by the end of November 20, 2009 with these issues addressed. If you can keep this next deadline, you are likely giving enough time to the editor and PMs for organizing these materials into what looks like a coherent proposal document, well before the DESY meeting. At the DESY meeting in December, then, we will give one more triage process for refining this proposal document. And as found necessary, we shall address the few remaining nagging issues (whatever they may be) and fix them all before December 18. TIA for your continued support and cooperation.