" Energizing the Countryside, Electrifying the Future" National Electrification Administration www.nea.gov.ph “The 1 st Performance Governance System-Institutionalized.

Slides:



Advertisements
Similar presentations
CONTRACT CLOSEOUT NORTH REGIONAL CONTRACTING OFFICE 13 January 2010.
Advertisements

State of New Mexico Procurement Card (P-Card) Program Procurement Card Training February 27, 2013 Procurement Card Training February 27, 2013.
Department of Arts and Culture Briefing on the Use of Official Languages Bill to the Select Committee on Education and Recreation Date:15 August 2012.
WAKULLA COUNTY Travel & Expense Procedures Manual Workshop September 2, 2008.
GRANT AGREEMENT FOR AN ACTION WITH MULTIPLE BENEFICIARIES.
Idaho High School Wireless Project Joyce Popp Chief Information Officer.
Department of Transportation Support Services Branch ODOT Procurement Office Intergovernmental Agreements 455 Airport Rd. SE, Bldg K Salem, OR
Conducting Collaborative Projects Part 4 OSP Awareness Feb 16, 2011 osp.syr.edu
Audit Findings on Kindergarten Inspections Internal Audit Section Finance Division November 2014.
Other Items for Consideration. Cash Change Funds The library board may permit any of its officers or employees having a duty to collect cash revenues.
Circular A-110 Everything You Didn’t Want to Know.
Eligibility of expenditure Relevant rules and regulations Workshop on Financial Management and auditing Rostock, 3 February 2005 Rostislav Zatloukal.
Post Award Workshop April 5, Fiscal Responsibilities 1. University Wide Responsibilities Every university employee has a responsibility to ensure.
Large Scale Projects Aleksejs Šaforostovs LSP Project Manager Joint Technical Secretariat.
Review of 2010 Biennial Audit of Capital Projects Cyndi Fout Project Services Director February 28, 2011.
RECEIVED STAMP Receiving and Information Accounting Section.
REPLACEMENT AND MAINTENANCE OF LIFTS GIVING ACCESS TO LHC UNDERGROUND AREAS TENDERING PROCEDURE IT-4056/EN 105 December 2014 Floris Bonthond.
Understanding Financial Management
1 INTERREG IIIB “ATLANTIC AREA” Main points of community regulation 438/2001 financial management and control systems EUROPEAN COMMISSION SPAIN.
2011 CDBG Recipients’ Workshop What’s New? Keeping current with the changing landscape.
NEW GOVERNMENT ACCOUNTING SYSTEM (NGAS)
Dir. Marietta M. Lorenzo Government Accountancy Sector.
PUBLIC PROCUREMENT OPERATIONS Dr. Fred Mugambi Mwirigi JKUAT 1.
UT-Arlington Accounting CPE Day August 13, 2014 SEFA Preparation and Subrecipient Monitoring.
Delegation of the European Commission to Russia 1 Financial Reporting for Grant Contracts General Conditions
FISCAL RESPONSIBILITY IN TITLE III AND OTHER SPONSORED PROGRAMS AND GRANTS ADMINISTRATION Presented by Sharon S. Crews, M.Ac., CPA Vice President for Administrative.
STATE FISCAL STABILIZATION FUND 2011 Updates February 1, 2011.
Overview on Fiduciary Aspects, Procurement and Audit IFAD India Country Office.
Travel Update and Review Controller’s Office October 26, 2011.
DG DEVCO, Unit B.6 Brussels, November Outline 1.Useful links 2.General conditions 3.General issues 2.
ZHRC/HTI Financial Management Training Session 5: Development Partner Relations and I-TECH Per Diem Policies.
Tacis Contracting Procedure Documents to be submitted together with the application:  Original Declaration by the Financial Lead Partner for Tacis  Partnership.
MARCH 9, 2006 Boating Safety and Enforcement Grant Program Regulations Stakeholder Workshop Proposed Conceptual Regulations Department of Boating and Waterways.
DG DEVCO, Unit B.6 Brussels, April Outline 1.Useful links 2.General conditions 3.General issues 2.
U.S. DEPARTMENT OF LABOR EMPLOYMENT AND TRAINING ADMINISTRATION ARRA GREEN JOB AND HEALTH CARE / EMERGING INDUSTRIES NEW GRANTEE POST AWARD FORUM JUNE.
1 TOP TEN NON- COMPLIANCE ISSUES PRESENTED BY APC COMMITTEE.
REPORTING, BUDGET, ELIGIBLE COSTS. Main steps of the financial management of the project.
The FDP will: Make people aware of how much public funds are available for the development of their communities and to what extent the LGU can help them.
COA Circular No , dated November 28, 2012
Service Quality Innovation Trust Safety The Samet Way “Managing the Company Cash Position” Accounts Payable (AP) should always be less than Accounts Receivable.
Salient IRR Revisions Alternative Methods of Procurement.
Financial Management 1. What is Financial Management ? Managing of Financial Resources Optimum utilisation of resources Utilisation of funds for the right.
CSO Observer Member of the Evaluation Committee. Civil Society Organization May have representation in the Evaluation Committee As a member of the Evaluation.
Regulation 13-H Transitional Provisions Presentation in conjunction with ECE/TRANS/WP29/GRRF/2014/16 Prepared by the ad hoc group on Transitional Provisions.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4144/SMB/HL-LHC (Point 1) IT-4155/SMB/HL-LHC (Point 5)
Sponsored Project Administration Fall 2012 CERTIFICATION PROGRAM Sponsored Project Lifecycle Introduction Overview Creating a Project Budget Compliance.
Copyright © Texas Education Agency Accounting for Grant Funds, including Documentation for Expenditures.
Ministry of Finance Compliance assessment of the management and control systems of the managing authorities under the Operational programmes. Conclusions.
Presented by: Sharon Pender Louisiana State PTA Treasurer.
Ministry of Finance Financial management and control of the Operational Programmes, co- financed under the Structural funds and the Cohesion fund of EU.
Welcome. Contents: 1.Organization’s Policies & Procedure 2.Internal Controls 3.Manager’s Financial Role 4.Procurement Process 5.Monthly Financial Report.
NSP II Project Directors Meeting JUNE 3, 2016 PRISCILLA MOORE & OSCAR IBARRA.
The Public Tendering and Bidding (招投标) Law of the People's Republic of China Effective since January 1, 2000.
- Special Education Needs (SEN) Network Administrative and Financial Aspects.
Travel Charge Card Training
Accounting Standards Board Annual Report 2006
Meeting Audit Requirements
BOT LAW (R.A. No. 6957, as amended by R.A. No. 7718)
INVITATION TO TENDER PROCEDURE IT-4344/EP Design, Supply, Installation, Testing and Commissioning of a Cleanroom extension for the integration of ATLAS.
Structural Funds Financial management and Control, Romania
MANAGING BUDGET FUNDS IN THE REPUIBLIC OF KAZAKHSTAN
Management Verifications & Sampling Methods
ALLOTMENTS, OBLIGATIONS
Management Verifications & Sampling Methods
JUSTICE ADMINISTERED FUND BILL [B ] BRIEFING OF THE SELECT COMMITTEE ON SECURITY AND JUSTICE ON 8 NOVEMBER 2016.
COGAIN Kick-Off 5-6 September, 2004 FINANCIAL GUIDELINES
THE NATIONAL TREASURY FEEDBACK WORKSHOP ON THE ANNUAL FINANCIAL STATEMENTS FOR FINANCIAL YEAR 2017/2018.
Grant Implementation Agreement (GIA)
The meeting of INTOSAI Working GROUP on Public Procurement Audit July 4-5 Lisbon Abstract of State Audit Bureau of Kuwait in conducting the public procurement.
PROCESS AND PROCEDURES ADVANCES SUBJECT FOR LIQUIDATION
Presentation transcript:

" Energizing the Countryside, Electrifying the Future" National Electrification Administration “The 1 st Performance Governance System-Institutionalized National Government Agency” Compliance to COA Requirements Subsidy Funded Projects

" Energizing the Countryside, Electrifying the Future" National Electrification Administration “The 1 st Performance Governance System-Institutionalized National Government Agency” Memo to All ECs re Compliance to COA Audit Findings on Subsidy Funded Projects

" Energizing the Countryside, Electrifying the Future" National Electrification Administration “The 1 st Performance Governance System-Institutionalized National Government Agency” ECs are recipients of Php26.5B subsidy funds. These amounts shall all be liquidated within timelines to ensure that projects are done, funds are accounted for and fully liquidated. COA is conducting an audit of subsidies released by NEA to ECs, pursuant to Section 2, Article IX-D of the Constitution of the Philippines and Sections 29 and 43 of the General Auditors Code of the Philippines (PD 1445).

" Energizing the Countryside, Electrifying the Future" National Electrification Administration “The 1 st Performance Governance System-Institutionalized National Government Agency” The audit is being conducted to determine the following: a.That utilization of subsidies were in accordance with the MOA. b.Subsidies were utilized with due regard to economy, efficiency and established policy. c.Electrification projects were implemented effectively in line with the attainment of the Agency’s objectives and those of the National Government pursuant to RA

" Energizing the Countryside, Electrifying the Future" National Electrification Administration “The 1 st Performance Governance System-Institutionalized National Government Agency” The significant audit observations and the corresponding recommendations are incorporated in the COA Report on Audit of Specific ECs and Annual Audit Report on NEA. Common audit observations: a.Unexpended/excess subsidy funds not returned to NEAUnexpended/excess subsidy funds not returned to NEA b.Delayed implementation of projectDelayed implementation of project c.Non-submission of original documentsNon-submission of original documents d.Realignment of projects without NEA approval e.Interest earned not returned to NEA f.PKKV ImplementationPKKV Implementation g.Violation of some provisions in the RA 9184 in the Implementation of Subsidy Funded ProjectsViolation of some provisions in the RA 9184 in the Implementation of Subsidy Funded Projects

" Energizing the Countryside, Electrifying the Future" National Electrification Administration “The 1 st Performance Governance System-Institutionalized National Government Agency” To immediately comply to COA audit recommendations, the auditee EC officials (Board President, General Manager, Finance Manager and Technical Manager) will be invited to NEA for a meeting to discuss the findings with the intention of signing of commitment by the EC on actions which it will take with timeline. This will facilitate all the necessary actions that should be taken both by NEA and the ECs. Compliance to COA requirements will also be included in the regular assessment of ECs performance.

" Energizing the Countryside, Electrifying the Future" National Electrification Administration “The 1 st Performance Governance System-Institutionalized National Government Agency” Template of Accounting of Funds (AOF)Accounting of Funds

" Energizing the Countryside, Electrifying the Future" National Electrification Administration “The 1 st Performance Governance System-Institutionalized National Government Agency” Allowable charges for Contingency Funds 1. From Memo to All ECs ( – 10/3/11) - Cost of Publication of bidding 2. From Memo to IAQSMO (11 July 2013) - A portion of salaries/benefits of EC’s regular employees assigned in the implementation of the project using WO - Gasoline/fuel consumption - Vehicle rental - Transportation - Meal allowance - Subsistence allowance incurred during the implementation of the subsidy funds *all these charges shall used Work order procedure

" Energizing the Countryside, Electrifying the Future" National Electrification Administration “The 1 st Performance Governance System-Institutionalized National Government Agency” Thank you

" Energizing the Countryside, Electrifying the Future" National Electrification Administration “The 1 st Performance Governance System-Institutionalized National Government Agency” a. COA-AOM No (2014) I. Common COA Audit Observations EC Unexpended Balance EC Unexpended Balance Less than P100,000 More than P100,000 Interest Earned Less than P100,000 More than P100,000 Interest Earned 1MASELCO85, ,213, , IFELCO52, , , CEBECO III86, ,285, PANELCO I 1,054, , SORECO I97, ,039, , FICELCO 5,300, NEECO II-A ,679, , SURSECO I 5,974, LUELCO 2,542, , PENELCO 233, TARELCO II7, ,434, ZAMECO II 49, CEBECO II 1,240, , MARELCO 33, BATANELCO 1,144, ,590.81TOTAL330, ,562, ,974, AKELCO 1,084,313.53

" Energizing the Countryside, Electrifying the Future" National Electrification Administration “The 1 st Performance Governance System-Institutionalized National Government Agency” a. Excess subsidy funds (NEA Memo No dated September a. Below P100,000 shall be returned to NEA 1 month after NEA Final Inspection and Acceptance b. P100,000 and above can be realigned subject to NEA approval Request for realignment should be submitted within 3 months from final inspection and acceptance. In cases of approved realignment, the realigned subsidy funds shall undergo the same process as regular subsidy.

" Energizing the Countryside, Electrifying the Future" National Electrification Administration “The 1 st Performance Governance System-Institutionalized National Government Agency” b. Timelines (Per MOA) Project Implementation and Completion within 6 months after receipt of funds Amendment Should the Recipient foresee the possibility of failing to complete the project(s) within the six month period, it shall made a written request for extension thereof within thirty (30) days before its expiration. NEA shall act or the request for extension within the same 30 day period. Furthermore, any extension of the said six month period shall, in no case, exceed three (3) months. Certificate of Final Inspection and Acceptance (CFIA) within 3` months from project completion Close-out within 3 months from CFIA

" Energizing the Countryside, Electrifying the Future" National Electrification Administration “The 1 st Performance Governance System-Institutionalized National Government Agency” EC Unexpended Balance Remarks Less than P100,000 More than P100,000 Interest Earned 10IFELCO52, , , PANELCO I 1,054, , FICELCO 5,300, SURSECO I 5,974, PENELCO 233, ZAMECO II 49, MARELCO 33, TOTAL330, ,562, ,974,128.84

" Energizing the Countryside, Electrifying the Future" National Electrification Administration “The 1 st Performance Governance System-Institutionalized National Government Agency” c. Submission of original documents to support liquidation: 1.Accounting of Subsidy Fund on a per project basis 2. Disbursement Voucher supported by relevant documents Straight ContractBy-AdministrationContract Labor/EC Materials -Contract-Payroll-Contract - Accomplishment Report-PO- Accomplishment Report -OR-RR-OR - Abstract of Bids with Bid Documents - Abstract of Bids with Bid Documents - Abstract of Bids with Bid Documents - MCrT and Summary of MCrT - MCT and Summary of MCT - Summary of fuel allocation/trip tickets

" Energizing the Countryside, Electrifying the Future" National Electrification Administration “The 1 st Performance Governance System-Institutionalized National Government Agency” 3. Staking Sheets (As-Built) for each project 4. Bill of Materials (As-Built) for each project 5. Certificate of Completion of Project 6. Bank Statements and/or passbook for all subsidies 7. Project Implementation Report

" Energizing the Countryside, Electrifying the Future" National Electrification Administration “The 1 st Performance Governance System-Institutionalized National Government Agency” AOM No (2014) – Audit of the PKKV Fund conducted in selected ECs disclosed the following deviations: a. 605 consumers/beneficiaries were included as beneficiaries of the program but not qualified under item III.1.b of NEA Memo No dated June 26, 2008; b. 655 were disconnected on or before implementation date of the program; c. 100 consumers/beneficiaries were granted subsidy of more than P500 charged to the subsidy fund; and d. 316 identified consumer/beneficiaries who were not granted the P500 one time subsidy based on the ECs billing system

" Energizing the Countryside, Electrifying the Future" National Electrification Administration “The 1 st Performance Governance System-Institutionalized National Government Agency” AOM No (2014) – Implementation of the subsidy funded projects of some ECs violates provisions of the RA 9184 The advance payment or 30% mobilization fee paid by ECs to its contractors exceeds the limit of 15% prescribed under Section No. 4.1 and 4.2 of Annex “E” on Contract Implementation Guidelines for the Procurement of Infrastructure Projects of the Revised Implementing Rules and Regulations (IRR) of Republic Act (R.A.) 9184 or the Government Procurement Reform Act. Failure of EC to require the winning bidders to post the required performance security Accounts receivables of bidders were accommodated as bid security in lieu of cash bond Absence of a contract between the EC and contractors Inconsistencies on the dates of the bidding activities Non-conformance of the members of the BAC on their assigned function Setting monetary limit as to what procurement method to use Inclusion of Simplified Bidding (Sealed Canvass) as an alternative mode of procurement