Methodology of RIA for European integration purposes and practical examples Outsourcing RIA preparation to external consultants: project management issues.

Slides:



Advertisements
Similar presentations
Project Cycle Management
Advertisements

EU CORIN Supporting Cross-border Cooperation BiH – Croatia/Serbia/Montenegro Europeaid/122730/C/SER/BA ________________________ Topical Training for JMC.
Launch of the ESPON 2013 Programme Procedures for Call for Proposals under Priorities 1-3.
EUROPEAN NEIGHBOURHOOD AND PARTNERSHIP INSTRUMENT - ENPI CROSS-BORDER COOPERATION PROGRAMMES.
Yalta Seminar on Global Assessments, 2009 Eurostat and Global Assessments: Context, Approaches, Tools 3.1.
Support and Inclusion of students with disabilities at higher education institutions in Montenegro – Procedure for collecting valid documentations.
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU PROCUREMENT PROCEDURES FOR THE AWARD OF CONCESSION/PPP CONTRACTS.
1 Use and content of the RFP  Request for Proposals (RFP) is similar to bidding documents and include all information of the assignment, selection of.
1 EFCA - 21th March 2002 Raul Mateus Paula. 2 This presentation underlines: The key objectives of the Relex Reform The division of the responsibilities.
Introducing Regulatory Impact Analysis into the Turkish Legal Framework Prime Minister’s Office, Better Regulation Group The Project Implementation Team.
Ministry of Education and Religious Affairs General Secretariat for Research and Technology EEA Financial Mechanism Research within Priority.
Culture Programme - Selection procedure Katharina Riediger Infoday Praha 10/06/2010.
Info Day on New Calls and Partner Café Brussels, 10 February 2011 How to apply: Legal Framework – Beneficiaries – Application and Selection Procedure.
PILOT PROJECT: External audit of quality assurance system on HEIs Agency for Science and Higher Education Zagreb, October 2007.
Audit of Public Procurement
Project Implementation Monika Balode Joint Technical Secretariat Lead Partner Seminar 16 October 2009, Šiauliai.
CSO engagement in policy process Hille Hinsberg State Chancellery Government Communication Officer
International Meeting Youth for Innovation Linz (Austria), June 2006.
Copyright © 2010 APEC Secretariat. Project Management : Implementation and Monitoring Presented by (Art) Phanpob Plangprayoon.
Project Overview, Objectives, Components and Targeted Outcomes
RTD-A.3 Legal Unit – Myriam Gómez-Martelo 13/05/2005- University of Naples Not legally binding Sixth Framework Programme Rules and legal aspects FP6 CONTRACTS.
1. Proposal deadline 2. Timeline  A grant opportunity announcement will include a sponsor deadline for receipt of the proposal.  The instructions will.
APPLICATION FORM OF ROBINWOOD SUBPROJECT SECOND STEP 1. The short listed Local Beneficiaries work together to create international partnerships and prepare.
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU 2 nd SIGMA NETWORKING SEMINAR OECD Conference Centre Paris.
The State Procurement Agency of the Republic of Azerbaijan Welcomes the participants of the 9 th Public Procurement Exchange Platform “Efficient Implementation.
Regional Training/Consultations on Capacity Development for Sustainable Growth and Human Development in Europe and CIS Application of Capacity Development.
IPA Funds Monitoring and Evaluation December Bölgesel Rekabet Edebilirlik Operasyonel Programı’nın Uygulanması için Kurumsal Kapasitenin Oluşturulmasına.
State of implementation of the decision III/6f regarding Ukraine (MOP 2, June, , 2008, Riga, Latvia)
Struktūrfondu vadošā iestāde – Finanšu ministrija 1 1 Communication Strategy of EU Funds Sanda Rieksta Head of Information Division, Deputy Head.
European Commission Joint Evaluation Unit common to EuropeAid, Relex and Development Methodology for Evaluation of Budget support operations at Country.
IAEA International Atomic Energy Agency. IAEA Outline Learning Objectives Objectives and goals of a follow-up mission Requesting an IRRS follow-up mission.
Lessons from Programme Evaluation in Romania First Annual Conference on Evaluation Bucharest 18 February 2008.
Community Resources Assessment Training 4-1. Community Resources Assessment Training 4-2.
SEA in the Czech Republic Prague, 24 September 2008.
Preparatory Stakeholder Workshop - Laos 26 May 2010.
PUBLIC–PRIVATE PARTNERSHIP (PPP) FRAMEWORK AND GUIDELINES Syed M. Ali Zaidi, P.Eng. PM(Stanford), Ph.D. Director, Strategic Partnerships Alberta Infrastructure.
Participation and dissemination Rules and Contracts FP6.
Project Management Birutė Markevičiūtė Joint Technical Secretariat Lead Partner Seminar 13 October 2008, Riga.
Initial eligibility assessment and ex-post monitoring of State aid in EU funds co-financed projects.
Application procedure From theory to practice Dieter H. Henzler, Steinbeis-Transfercenter Cultural Resources Management, Berlin.
Grant Application Form (Annex A) Grant Application Form (Annex A) 2nd Call for Proposals.
TEN-T Executive Agency and Project Management Anna LIVIERATOU-TOLL TEN-T Executive Agency Senior Programme and Policy Coordinator European Economic and.
Negotiation of Proposals Dr. Evangelos Ouzounis Directorate C DG Information Society European Commission.
Information Overview SF: Planning & Programming Workshops for EC Delegation Patrick Colgan & Ján Krištín PROGRAMMING PROCEDURES in Support of Regional.
Status and role of International Department (Slovak experience) MGSC Meeting Luxembourg 23 – 24 March 2012 SOSR.
INSTRUCTIONS YOU HAVE UNTIL MAY 31 TH 2013 TO SEND THIS DOCUMENT BACK TO ✚ FILL THIS DOCUMENT and help yourself with the evaluation.
“RIA in EU Harmonization” 4 June 2009 EuropeAid/125317/D/SER/TR Session 4 RIA in accession negotiatons.
Technical Assistance Office 1 Contract, Reports and errors to avoid! GRANT AGREEMENT 2005 Comenius coordinators’ meeting, 17/10/2005 Maryline Fiaschi,
Technical Assistance Office TCP Projects 2005 Contractual and Financial Management Administrative and Financial Handbook Prepared by IA, 14/12/2001 SOCRATES.
SEVESO II transposition and implementation: Possible approaches and lessons learned from member states and new member states SEVESO II transposition and.
DG Justice and Consumers Project Management Some points of attention JUST/2014/JCOO/AG/CRIM and JUST/2014/JCOO/AG/CIVI Kick-off meeting 26 January2016.
2014 ANNUAL PROGRAMME: MEETING WITH LEAD INSTITUTIONS & END BENEFICIARIES March 2016 CFCU.
Concept Note Preparation CYPRIOT CIVIL SOCIETY IN ACTION IV.
Consumers, Health, Agriculture and Food Executive Agency 3rd Health Programme The Electronic Submission System (JA 2015) Georgios MARGETIDIS.
Welcome. Contents: 1.Organization’s Policies & Procedure 2.Internal Controls 3.Manager’s Financial Role 4.Procurement Process 5.Monthly Financial Report.
What is Public Administration Reform? The resource for achieving more efficient, more effective and more accountable state administration The resource.
1 FP6 – Financial Management and Reporting 1 April 2006 Sofia, Bulgaria.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
André Hoddevik, Project Director Enlargement of the PEPPOL-consortium 2009.
Quality assessment of internal audit activities performed on a periodical basis Nikolina Bibić, Ministry of Finance, Central Harmonization Unit Republic.
WP3 - Evaluation and proposal selection
strengthening the elements of governance in Tajikistan
Chisinau, Republic of Moldova 2017
TECHNICAL ASSISTANCE FUND IIB– Slovak Republic
Preparation of a tender and tender documents
Drafting the Guidelines for applicants
The Estonian experience with ex-ante evaluation – set-up and progress
Ad hoc Group of Experts on Better Regulation
Slovak Republic - International Investment Bank Technical Assistance Fund
Presentation transcript:

Methodology of RIA for European integration purposes and practical examples Outsourcing RIA preparation to external consultants: project management issues Handout only Training seminar for BiH institutions (state and entity level) organized by the Directorate of European Integration of BiH and EU support to DEI TA project 4 February 2011 (Friday, ) Parliamentary Assembly Building of BiH, Sarajevo Darius Žeruolis Key expert, EU support to DEI TA project

2 Why and when outsourcing might be necessary? When resources are not available in-house (at the state institutions), especially for solution of complex or unknown problems For sectoral studies (when it is difficult to co-ordinate internally in line ministries) To build or enlarge RIA expert community outside the state institutions It can be used as information and legitimacy tool to involve non- governmental stakeholders (usually it is a better consultation process than the formal one) Mostly for full RIAs

3 Ways of outsourcing Tender - call for proposals (through the general terms of reference) Tender and then direct negotiation with potential researchers (terms of reference specific to the problem)

4 Call for proposals - 1 Is needed when several RIAs are outsourced simultaneously Could be necessary anyway if the value of consultancy services exceeds the limits defined by the requirements of public procurement In any case, if done properly, this way of outsourcing is transparent and is recommended

5 Call for proposals - 2 The standard kit of documents for a call of proposals: Advertisement in the mass media and the website (and in the Official Gazette if exceeds the threshold of public procurement) Terms of reference (description of the services sought) Application form Contents of the contract for services Management of the study process [time table]

6 Call for proposals: structure of the terms of reference Description of the (RIA) framework and methodology to be followed Description of expected outputs … (RIA study; Executive summary; Executive summary in English; Power point presentation – size and requirements) …and obligations (eg one or two interim report(s); participation in the roundtable with stakeholders) Areas or topics for RIA Requirements for the applicants Selection criteria Procedure for selection Documents to be submitted by the applicants Other

7 Issues to be considered when drafting a call for proposals Areas or topics for RIA: general specification is needed, specific topics depend on the institutional needs Requirements for applicants – Individual or institutional – Civil servants not eligible Documents to be submitted by the applicants: – Standard application form (filled in), both in paper and electronically – Proofs of competence Copies of degrees CVs List of publications or copies of the relevant (or most recent publications) List of research projects (especially similar to RIA)

8 Application form for the conduct of the RIA study - 1 I. GENERAL 1. Title of the proposed study 2. Estimate of financial costs of the study (budget) 3. Amount requested from the contracting institution 4. Other available or possible sources of financing (if any)

9 Application form for the conduct of the RIA study - 2 II. INFORMATION ABOUT THE APPLICANT(S) 1. Applicant (-s) (institution, research team or individual researcher) 2. Team leader (name, surname; brief description of similar projects and research already completed or ongoing) 3. List of members of research team and brief information about them (applicable if application is submitted by the research team)

10 Application form for the conduct of the RIA study - 3 III. BRIEF INFORMATION ABOUT THE STUDY (RESEARCH) PROPOSAL 1. Brief description of the problem to be studied (researched) (why this problem merits an in depth (extended) impact assessment study) 2. Brief description of the problem in the context of legal approximation in the country (i.e. transposition and implementation of acquis communautaire) (why an in depth (extended) impact assessment study is necessary in the context of European integration in the country) 3. Description of the scope of impact 4. Have there been similar impact assessment studies (in this area) conducted in the country or in other countries (notably EU member states / new members states)? (In case of a positive answer references should be requested)

11 Application form for the conduct of the RIA study - 4 IV. DETAILED DESCRIPTION OF THE STUDY (RESEARCH) 1. (Concrete) objectives of the study 2. (Concrete) questions to be answered during the study 3. Description of methodology to be used during the study (study methods) 4. Expected results of the study 5. Potential to use the results of the study in practice (A list of potential stakeholders and an explanation why they are or should be interested in the resulst of this studyshould be requested from the applicant) 6. Expected/proposed dissemination of the results (information to the expert community / general public of the country)

12 Application form for the conduct of the RIA study - 5 V. BREAKDOWN OF FINANCIAL COSTS OF THIS STUDY AND DEADLINES 1. Detailed financial breakdown of financial costs for this project (according to the objectives prursued and expenditure incurred and broken down by all participating persons (researchers) (honoraria, materials, office and communications expenditure, services to be procured externally etc.) 2. Stages and deadlines of the study – Stages of the study Commencement (beginning) of the study Submission of interim report (eg 3 months after commencement) Submission of final report (eg 6 months after commencement) – Interim report should contain information about the completed and remaining objectives of the study as well as preliminary final report (should contain description of methodology, preliminary findings and conclusions. It should have the layout of the final report). – (Signed) statement about the accuracy of the data in the application form – Date and the signature of the team leader or individual applicant

13 Call for proposals: selection criteria Competence and experience in RIA (10%) Clarity and comprehensiveness of specific RIA methodology (20%) Anticipated scope of impact (15%) Established or planned co-operation with state institutions for this RIA (15%) Practical applicability of RIA findings (20%) Financial estimate (15%) Own co-financing or other sponsors (5%)

14 Timeframe – launching stage A month for submission of applications One-two weeks for pre-selection (short listing – strongly recommended) A week for negotiations with short-listed candidates A week for conversion of the agreements into the contract All in all – it could take up to three months of preparatory work before the study can be launched

15 Timeframe – implementation stage Three to six months are recommended for the study itself If possible, two interim reports should be requested – The first should address the in-depth methodology – The second should present preliminary conclusion in the shape of the structure of the final study It is recommended to link satisfactory evaluation of the interim report by an independent external reviewer and/or steering committee to the payment for services

16 Internal management issues Selection and/or steering committee – Statement of impartiality and absence of conflicts of interest Quality management through reviews of interim and final reports of external consultant (-s)

17 Management of deadlines in the tabular form