Doc.: IEEE 802.11-04/1058r1 TGs Process September 2004 Donald Eastlake 3rd, Motorola LaboratoriesSlide 1 Mesh Networking Task Group Process Donald E. Eastlake.

Slides:



Advertisements
Similar presentations
Doc.: IEEE /1326r1 Submission November 2008 Donald Eastlake 3rd, MotorolaSlide 1 TGs Process, November Date: Author:
Advertisements

Doc.: IEEE /2142r1 Submission July 2007 Donald Eastlake 3rd, MotorolaSlide 1 TGs Process, July Date: Authors:
Doc.: IEEE /130r0 Submission January 2006 Donald Eastlake 3rd, MotorolaSlide 1 TGs Process Notice: This document has been prepared to assist IEEE.
Doc.: IEEE /0765r0 Submission July 2005 Jesse Walker (Intel Corporation) Slide 1 Motion Move To form an IEEE Study Group to receive WLAN.
Doc.: IEEE Submission November 2004 Robert F. HeileSlide rd Session of meetings of the IEEE Working Group for Wireless.
Doc.: IEEE /0235r0 Submission February 2007 Donald Eastlake 3rd, MotorolaSlide 1 TGs Process, February Notice: This document has been prepared.
Doc.: IEEE /840r2 Submission June 2006 Donald Eastlake 3rd, MotorolaSlide 1 TGs Process, June Notice: This document has been prepared to assist.
Doc.: IEEE /207r0 Submission March 2005 Donald Eastlake 3rd, MotorolaSlide 1 TGs Process Notice: This document has been prepared to assist IEEE.
Doc.: IEEE /663r TGs Mesh Networking Agenda July 2004 Donald Eastlake 3rd, Motorola LaboratoriesSlide 1 IEEE s: ESS Mesh Networking.
Doc.: IEEE /800r2 Submission July 2004 Donald Eastlake 3rd, MotorolaSlide 1 Mesh Networking Task Group Process Donald E. Eastlake 3 rd
Doc.: IEEE /1386r0 Submission September 2006 Donald Eastlake 3rd, MotorolaSlide 1 TGs Process, September Notice: This document has been prepared.
Doc.: IEEE /840r1 Submission June 2006 Donald Eastlake 3rd, MotorolaSlide 1 TGs Process, June Notice: This document has been prepared to assist.
Doc.: IEEE /1149r4 Submission November 2004 Donald Eastlake 3 rd, MotorolaSlide 1 IEEE s: ESS Mesh Networking Task Group San Antonio, Texas.
Doc.: IEEE /0380r1 Submission March 2007 Donald Eastlake 3rd, MotorolaSlide 1 TGs Process, March Notice: This document has been prepared to assist.
Doc.: IEEE /340r1 Submission March 2006 Donald Eastlake 3rd, MotorolaSlide 1 TGs Process, March Notice: This document has been prepared to assist.
Doc.: IEEE /800r1 Submission July 2004 Donald Eastlake 3rd, MotorolaSlide 1 Mesh Networking Task Group Process Donald E. Eastlake 3 rd
Doc.: IEEE /1384r3 Submission November 2004 Donald Eastlake, 3 rd, MotorolaSlide 1 Mesh Networking Task Group Process Donald E. Eastlake 3 rd.
Doc.: IEEE /366r0 Submission May 2005 Donald Eastlake 3rd, MotorolaSlide 1 TGs Process Notice: This document has been prepared to assist IEEE.
IEEE s: ESS Mesh Networking Task Group
TGn Chair’s Status Update
TGu Process Date: Authors: January 2005 January 2005
TGs Process, November Date: Authors: November 2007
TGs Process, March Date: Authors: May 2006 May 2006
IEEE s: ESS Mesh Networking Task Group
TGs Process, July Date: Author: July 2009 July 2009
Mesh Networking Task Group Process
IEEE s: ESS Mesh Networking Task Group
TGs Process Date: Authors: January 2005 January 2005
TGs Process Date: Authors: November 2005 November 2005
TGs Process Date: Authors: July 2005 July 2005
TGs Process Date: Authors: September 2005 September 2005
Liaison Report Date: Author: Jan 2008 Month Year
IEEE s: ESS Mesh Networking Task Group
TGs Process, July Date: Author: July 2009 July 2009
TGs Process Date: Authors: March 2005 March 2005
TGs Process, March Date: Authors: May 2006 May 2006
TGs July Closing Report
TGn Chair’s Status Update
TGs Process Date: Authors: July 2005 July 2005
TGs Process Date: Authors: March 2005 March 2005
TGs Process, March Date: Authors: March 2006 January 2006
TGs Process, September Date: Author: September 2008
TGs Process, March Date: Authors: May 2006 May 2006
ESS Mesh Study Group Report
TGs Process, November Date: Authors: November 2007
January 2005 Mesh Agenda Authors: January 2005 Date:
January 2005 Mesh Agenda Authors: January 2005 Date:
TGs Process, July Date: Authors: July 2006 July 2006
TGs Process, November Date: Authors: November 2007
TGs Process, March Date: Authors: March 2007 March 2007
TGs Process, July Date: Author: July 2009 July 2009
TGs Process, February Date: Authors: February 2007
TGs Process, March Date: Authors: May 2006 May 2006
TGu Process Date: Authors: January 2005 January 2005
TGs Process, September Date: Author: September 2009
TGs Process, September Date: Authors: September 2007
TGs Process, January Date: Authors: January 2007
TGs Process, November Date: Authors: November 2006
TGs Process, November Date: Authors: November 2006
TGs Process, March Date: Author: March 2009 March 2009
TGs Process, January Date: Authors: January 2007
TGs Process, May Date: Authors: May 2007 March 2007
Mesh Networking Task Group Process
TGs Closing Plenary Report
TGs Process Date: Authors: March 2005 March 2005
TGs Process, May Date: Authors: May 2007 May 2007
TGs Process Date: Authors: May 2005 May 2005
Mesh Networking Task Group Process
March 2005 Mesh Agenda Authors: February 2005 Date:
TGs Process, March Date: Authors: March 2008 March 2008
Presentation transcript:

doc.: IEEE /1058r1 TGs Process September 2004 Donald Eastlake 3rd, Motorola LaboratoriesSlide 1 Mesh Networking Task Group Process Donald E. Eastlake 3 rd

doc.: IEEE /1058r1 TGs Process September 2004 Donald Eastlake 3rd, Motorola LaboratoriesSlide 2 Generic Process of Getting to Letter Ballot Adoption of PAR and 5 Criteria Technical Presentations and Discussions Specify Any Additional Requirements or Comparison Criteria Call For Proposals Select/Combine from Submitted Complete/Partial Proposals to Produce a Draft Refine Draft Letter Ballot

doc.: IEEE /1058r1 TGs Process September 2004 Donald Eastlake 3rd, Motorola LaboratoriesSlide Project Timelines Time from PAR approval to first Letter Ballot – average of 6.6 meetings / 13 months –TGe-7, TGf-7, TGg-9, TGh-4, TGi-6 Time from first Letter Ballot to first Sponsor Ballot – average of 9 meetings / 18 months –TGe-12, TGf-9, TGg-6, TGh-8, TGi-10 Our PAR approval was 24 June 2004 –At the average pace for these Task Groups, our first Letter Ballot would open in July 2005 and our first Sponsor Ballot in January –Things will happen slower than we aim for.

doc.: IEEE /1058r1 TGs Process September 2004 Donald Eastlake 3rd, Motorola LaboratoriesSlide 4 Future Schedule Discussed at July Meeting in Portland September 2004 (Berlin, German) –Discuss Functional Requirements / Evaluation Criteria document –Usage Models and Requirements –Routing –QoS/MAC Enhacements –Security –Definitions November 2004 (San Antonio, TX) –Call for Proposals issued immediately after meeting with deadline for submission of two weeks before the March meeting January 2005 (Monterey, CA) Presentations including Proposals March 2005 (Atlanta, GA) Presentation and Selection from Proposals May 2005 (Sydney, Australia) Refinement of Draft July 2005 (San Francisco, CA) Letter Ballot Authorized

doc.: IEEE /1058r1 TGs Process September 2004 Donald Eastlake 3rd, Motorola LaboratoriesSlide 5 Ad Hoc Subgroups and Internal TGs Actions Ad Hoc Subgroups –Have no special status unless TGs votes on them or their output. –Any group of members can get together and make submissions. Within the Policies and Procedures (11-04/510r0), we can do what we want internally: –“Adopted” internal TGs motions/documents can be amended –We can issue a call for proposals With no requirements other than the PAR & 5 Criteria With general requirements With detailed requirements and evaluation criteria –We can have “Functional Requirements” document that is as general or specific as we like.

doc.: IEEE /1058r1 TGs Process September 2004 Donald Eastlake 3rd, Motorola LaboratoriesSlide 6 Informal Ad Hoc Subgroups Definitions – coordinator Tricci So –“Draft Terms and Definitions for s”, 11-04/969r2 Usage Cases – coordinator Steve Conner –“Usage Models”, 11-04/662r10 Scope – coordinator Tricci So –“Proposed TGs Scope”, 11-04/970r1 Quality of Service / e – coordinator Lily Yang –“Issues for Mesh Media Access Coordination Component in 11s (v03)”, 11-04/968r4

doc.: IEEE /1058r1 TGs Process September 2004 Donald Eastlake 3rd, Motorola LaboratoriesSlide 7 Informal Ad Hoc Subgroups (cont.) Security / i, 802.1ae, 802.1af – coordinators Jasmeet Chhabra, Bob Moskowitz –“802.11s Security Concepts”, 11-04/1115r1 Routing – coordinator Tyan-Shu Jou Other –802.11k, h /Radio Resources/Metrics – coordinator –WNM, CAPWAP /Management – coordinator

doc.: IEEE /1058r1 TGs Process September 2004 Donald Eastlake 3rd, Motorola LaboratoriesSlide 8 July 2004 Straw Poll on Informal Group Submissions Status What should be the status of relevant submissions from informal groups if a majority of TGs agrees with the submission? –Strongly included as part of call for proposals – 12 –Adopted as internal working documents – 29 –Included on a TGs recommended reading list – 3 –No special status – 2

doc.: IEEE /1058r1 TGs Process September 2004 Donald Eastlake 3rd, Motorola LaboratoriesSlide 9 Calling for Proposals in November If a call for proposals is to be issued shortly after the November meeting, we should issue a warning at this meeting that we plan to do that. Proposals obviously must conform to the PAR and 5 Criteria. Will we have a Functional Requirements or Evaluation Criteria Document? What other documents, if any, should be referenced by the Call for Proposals?

doc.: IEEE /1058r1 TGs Process September 2004 Donald Eastlake 3rd, Motorola LaboratoriesSlide 10 July 2004 Straw Poll on When to call for Proposals What is the current feeling of TGs as to when we should call for proposals? In favor/against vote on each: –July 2004 – 3-31 –September 2004 – –November 2004 – –January 2005 – 8-1 Should the call for proposals require that they be complete?18-19 (almost a tie) How long should the window be for submitting proposals? –2 months – 2 –4 months – 17 –6 months – 10

doc.: IEEE /1058r1 TGs Process September 2004 Donald Eastlake 3rd, Motorola LaboratoriesSlide 11 September 2004 Straw Poll on When to call for Proposals What is the current feeling of TGs as to when we should call for proposals? In favor/against vote on each: –September 2004 – 2-25 –November 2004 – –January 2005 – 28-4 How long should the window be for submitting proposals? –2 months – 0 –4 months – 25 –6 months – 10

doc.: IEEE /1058r1 TGs Process September 2004 Donald Eastlake 3rd, Motorola LaboratoriesSlide 12 Tentative Proposal Schedule Decision The following motion was approved: Moved, to direct the TGs chair to announce at the closing September plenary session and post to the mailing list that TGs plans to issue a call for proposals shortly after the January meeting with proposals to be submitted before and presented to TGs at or before the third meeting thereafter. –Moved: Peter Ecclesine –Seconded: Clint Chaplin

doc.: IEEE /1058r1 TGs Process September 2004 Donald Eastlake 3rd, Motorola LaboratoriesSlide 13 Possibilities to Accelerate TGs Possibilities for TGs Activity Between September and November Meetings to accelerate action : –One Teleconference –Ad-hoc face to face meeting (requires 30 days notice (P&P clause 3.6.2)) –Multiple Teleconferences (require 10 days notice, cannot be held more often than weekly (P&P clause 3.6.3))

doc.: IEEE /1058r1 TGs Process September 2004 Donald Eastlake 3rd, Motorola LaboratoriesSlide 14 Teleconferences Motion The following motion was adopted. Moved, that TGs have bi-weekly teleconferences at 13:00 Pacific Standard Time Wednesday starting 29 September through 27 October. Notice will be given, including UTC time, at least 10 days in advance. –Moved: Steve Conner –Seconded: Vann Hasty

doc.: IEEE /1058r1 TGs Process September 2004 Donald Eastlake 3rd, Motorola LaboratoriesSlide 15 Future Schedule? November 2004 (San Antonio, TX) –Work on Functional Requirements and other documents that may be referenced in the Call for Proposals. January 2005 (Monterey, CA) –Work on Functional Requirements and other documents that may be referenced in the Call for Proposals. –Call for Proposals issued immediately after meeting with deadline for submission of two weeks before the July meeting. March 2005 (Atlanta, GA) –Presentations, refinement of selection criteria May 2005 (Sydney, Australia) –Presentations, refinement of selection criteria July 2005 (San Francisco, CA) Presentation of Proposals September 2005 (TBD) Derivation of Draft November 2005 () Further Refinement of Draft, Letter Ballot Authorized by WG?