JCOP Framework and PVSS News ALICE DCS Workshop 14 th March, 2006 Piotr Golonka CERN IT/CO-BE Outline PVSS status Framework: Current status and future.

Slides:



Advertisements
Similar presentations
JCOP FW Update ALICE DCS Workshop 6 th and 7 th October, 2005 Fernando Varela Rodriguez, IT-CO Outline Organization Current status Future work.
Advertisements

Module 13: Performance Tuning. Overview Performance tuning methodologies Instance level Database level Application level Overview of tools and techniques.
PVSS and JCOP Framework Organization, Support & News Oliver Holme IT-CO.
The Detector Control System – FERO related issues
Xavier Le Gouard Rich Power Supplies Monitoring and Control RICH Power Supplies Monitoring and control.
P.C. Burkimsher Alice DCS Workshop 18 March 2002 (Updated 27 March 2003) PVSS - How to get started Paul Burkimsher IT Division COntrols Group Support Services.
March 16, 2004Alice controls workshop, S.Popescu Low Voltage and High Voltage OPC status and plans.
Experiment Control Systems at the LHC An Overview of the System Architecture An Overview of the System Architecture JCOP Framework Overview JCOP Framework.
Uli Schäfer Discussions with H.B. after last meeting… All ATLAS standard racks and crates will be monitored. Helfrieds group will equip them with ELMBs.
1 CALO DCS power supply status CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  Introduction  Power supply description with hardware.
The Detector Safety System for LHC Experiments Stefan Lüders ― CERN EP/SFT & IT/CO CHEP03 ― UC San Diego ― March 27 th, 2003.
Clara Gaspar, November 2012 Experiment Control System LS1 Plans…
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
CERN - IT Department CH-1211 Genève 23 Switzerland t The High Performance Archiver for the LHC Experiments Manuel Gonzalez Berges CERN, Geneva.
Scaling Up PVSS Phase II. 2 Purpose of this talk Start a discussion about the next phase of the Scaling Up PVSS Project. Start a discussion about the.
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
1 Status & Plans DCS WS L.Jirdén. 2 DCS Planning FINAL INST COM- MISS BEAM OP PRE- INST DET DCS URD ENG. SOLUTIONS PROTOTYPE SUBSYSTEM.
09/11/20061 Detector Control Systems A software implementation: Cern Framework + PVSS Niccolo’ Moggi and Stefano Zucchelli University and INFN Bologna.
TPC DCS update. CR3 UX-A/C CR4-Z08 UX-A/C CR3 CR4-Z08 UX-A/C CR4-Y08 Chambers ISEG Chambers Wiener Ethernet RCU Chambers, detector ELMB
Update on Database Issues Peter Chochula DCS Workshop, June 21, 2004 Colmar.
June 14, 2005 Alice DCS workshop, Utrecht S.Popescu Guidelines and conventions for ALICE PVSSII control software Graphical User Interface Naming and Numbering.
Peter Chochula and Svetozár Kapusta ALICE DCS Workshop, October 6,2005 DCS Databases.
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
DCS Plans and Pending Activities for 2013/14 Shutdown Muons in general Replacement/upgrade of DCS computers OS migration to Win-7, Win-2008 or SL6 PVSS.
The Joint COntrols Project Framework Manuel Gonzalez Berges on behalf of the JCOP FW Team.
ALICE DCS Meeting.- 05/02/2007 De Cataldo, Franco - INFN Bari - 1 ALICE dcsUI Version 3.0 -dcsUI v3.0 is ready and will be soon posted on the ACC site.
ALICE DCS Workshop - 14/03/2006 De Cataldo, CERN CH and INFN Bari - 1 Standardization of the DCS control panels The ACC is elaborating a set of panels.
1 Responsibilities & Planning DCS WS L.Jirdén.
D etector C ontrol S ystem ALICE DCS workshop G. De Cataldo CERN-CH, A. Franco INFN Bari, I 1 Finite State Machines (FSM) for the ALICE DCS:
André Augustinus 10 October 2005 ALICE Detector Control Status Report A. Augustinus, P. Chochula, G. De Cataldo, L. Jirdén, S. Popescu the DCS team, ALICE.
ALICE, ATLAS, CMS & LHCb joint workshop on
Peter Chochula DCS Remote Access and Access Control Peter Chochula.
20th September 2004ALICE DCS Meeting1 Overview FW News PVSS News PVSS Scaling Up News Front-end News Questions.
André Augustinus OPC news, versions to use on behalf of Sorina Popescu.
Giovanni Polese1 RPC Detector Control System for MTCC Pierluigi Paolucci, Anna Cimmino I.N.F.N. of Naples Giovanni Polese Lappeenranta University.
Overview of PVSS 3.6 Oliver Holme IT-CO. 16/11/2006JCOP Project Team Meeting New features in 3.6 New Installer for PVSS on Windows New Qt User Interface.
André Augustinus 16 September 2002 PVSS & Framework How to get started.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
ALICE Use of CMF (CC) for the installation of OS and basic S/W OPC servers and other special S/W installed and configured by hand PVSS project provided.
Peter Chochula ALICE Offline Week, October 04,2005 External access to the ALICE DCS archives.
October 9th 2006ALICE WEEK - DCS WorkShop1 DEVICE USER SUPPORT OVERVIEW - Presentation - First Line Support - Reference System - Current Developpement.
Alice DCS workshop S.Popescu 1 1. News from TPC DCS cooling prototype Project overview: Aim of the prototype: investigating and developing standard.
André Augustinus 16 June 2003 DCS Workshop General Purpose Monitor.
1 JCOP-UNICOS. 2 Purpose of this meeting Requested by IT/CO To present you the UNICOS requirements on the hierarchy classifications Not to discuss the.
Alice DCS workshop S.Popescu ISEG Crate controller + HV modules ISEG HV modules 12 Can bus PVSS OPC Client 1 Generic OPC Client Iseg OPC.
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
ECS and LS Update Xavier Vilasís-Cardona Calo Meeting - Xvc1.
DCS overview - L.Jirdén1 ALICE ECS/DCS – project overview strategy and status L.Jirden u Organization u DCS system overview u Implementation.
Alarm Handling Oliver Holme 7 th November Guidelines & Strategies All provide recommendation to use Framework Classes Standard severities/behaviour/colours.
“The LHC GCS Framework” Geraldine Thomas CERN, IT-CO A complete PLC and PVSS automatic code Generation.
5th March 0718th DCS Workshop1 News on ISEG & WIENER Lionel Wallet, CERN High Voltage, Low Voltage & VME Crate control.
ALICE DCS Workshop 9 October 2006 ALICE DCS Workshop 9 October 2006 Michele NITTI.
European Organization for Nuclear Research LHC Gas Control System Applications Generation to Deployment phases Strategy/Principles.
The DCS Databases Peter Chochula. 31/05/2005Peter Chochula 2 Outline PVSS basics (boring topic but useful if one wants to understand the DCS data flow)
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
D. EliaALICE week / DCS workshop - Sept 20, SPD Power Supply System DCS status Domenico Elia INFN Bari.
Database Issues Peter Chochula 7 th DCS Workshop, June 16, 2003.
3rd June 2004JCOP CCB Meeting1 JCOP Activities and News JCOP FW PVSS Scaling Up DSS GCS Rack Monitoring, Control and Safety (RMCSS) Miscellaneous.
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
The PVSS Oracle Archiver FW WG 6 th July Credits Many people involved IT/DES: Eric Grancher, Nilo Segura, Chris Lambert IT/PSS: Luca Canali ALICE:
PVSS an industrial tool for slow control
Supervision Miniworkshop JCOP Workshop 2015
PVSS Evolution in Relation to Databases
JCOP Review Closeout March 13, 2003 Chip Watson, Robin Lauckner,
Introduction of Week 3 Assignment Discussion
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

JCOP Framework and PVSS News ALICE DCS Workshop 14 th March, 2006 Piotr Golonka CERN IT/CO-BE Outline PVSS status Framework: Current status and future work Oracle archiver status Advanced course

14 March 2006ALICE DCS Workshop2 Current Status: PVSS  PVSS official release 3.1 -Download from -Windows: available as a patch (SP2); already in the cumulative patch -Linux: available as complete installation un-installation of 3.0 required if installed in the same folder -Upgrade of 3.0 projects required button in System Management Panel  Evaluation of PVSS v3.5 prototypes -We got a few development snapshots, -Final version expected in summer -Some features being tested: new tree widget, trending widget,... project version management (integrated with file tree panel of GEDI) embedding custom widgets: proof-of-concept Root canvas -Framework compatibility and migration studies

14 March 2006ALICE DCS Workshop3 Current status: Framework  Current version is 2.3.6:  Compatible with PVSS 3.1  Available from:  List of all improvements and fixes: on the download page

14 March 2006ALICE DCS Workshop4 Framework 2.3.6: Tools  NEW! Alarm Handling Component -Customized alarm screen (filtering based on FW criteria)  NEW! Complete reference help -Accessible from the main panel of the (new) installation tool  Access Control -Upon the decision of FWWG, the integration of AC mechanisms in device panels is up to developers now -minimal functionality may be provided by the Framework  Trending Tool -Improved template functionality Each instance of a template plot in a page may have separate parameters  Cooling and Ventilation Application -Proved to work with SPD -Next tests in ALICE with HMPID -Not (yet) distributed with the framework

14 March 2006ALICE DCS Workshop5 Framework 2.3.6: Tools  Configuration Database Tool -Supports HARDWARE and LOGICAL hierarchies -Recipe templates (aka recipe-per-device-type) -Used by many sub-detectors now  FSM -Alarm handling based on summary alarms -Setting the state of a DU from a script The user gains control of when the state-transition happen Its use may lead to performance improvements (eliminate dpConnects)

14 March 2006ALICE DCS Workshop6 Framework 2.3.6: Devices  ELMB v Custom PDO's for analog inputs -Possibility to define a “raw value” sensor  Wiener Maraton -Released now -Requires new OPC server from Wiener (1.0)  CAEN -The list of supported boards is now available in the component's documentation: DE&N->Open Installation Tool... -> “Help” next to “CAEN” -No support for SASY (use of EASY recommended by CAEN)

14 March 2006ALICE DCS Workshop7 CAEN component documentation...

14 March 2006ALICE DCS Workshop8 Future Work (Framework Tools)  Access Control -Synchronization of AC in a distributed system: “domain controller” (?) to be discussed by FWWG  Trending Tool -Taking advantage of new trending widget of PVSS 3.5 Step1: (summer release) compatibility with existing functionality Step2: (later) integration of the new features  Configuration Database -saving/restoring of device configs (next version) -Improve performance of DB access layer -Integration with FSM -tag/version management (API, panels) -API and documentation clean-up

14 March 2006ALICE DCS Workshop9  CAEN -Integration of AliceBox Requires discussion with Ombretta -Two other EASY modules: A3486, A3801  ELMB -ATLAS is working on SPI integration  BCAM (alignment cameras) -Will be integrated in April (Sorina, Oliver) Future Work (Framework Devices)

14 March 2006ALICE DCS Workshop10 PVSS Oracle archiver status  New version in patch 167 -Available on request (from DCS coordinator) -Client side Big performance improvement –1000 changes/s Windows –2000 changes/s Linux Limitation is PVSS itself, not RDB -DB server side High CPU load Big overhead: ~200 bytes to store a float –Timestamp, quality, manager, etc –Indexes to speed up queries –DB internal overhead Dedicated IT/CO server could only handle 4 clients with a total of ~5000 changes per second

14 March 2006ALICE DCS Workshop11 PVSS Oracle archiver status  Current work at CERN -Testing with different DB servers -Finding ways to reduce load on server -Contact with Oracle consultant -Testing with many clients (help from S. Kapusta)  Current work at ETM -Simplifying the set up procedure -Working on buffering when DB not available

14 March 2006ALICE DCS Workshop12 Advanced Framework Course ... for really advanced PVSS users  Contents: -Recap on JCOP Technologies (FSM, Fw devices) -DIM -Access Control component -CNIC (security) awareness and tools -Alarm handling -Integration of custom devices into the framework -Configuration Database Tool -Integration of control hierarchies  More details, dates and registration: -  Contact your central team (ACC)

14 March 2006ALICE DCS Workshop13 Feedback... Your feedback is greatly appreciated: