Drive Beam Injector Drive Beam Accelerator X 2 Delay Loop X 5 Combiner Ring Two-beam Test Area 3.5 A - 1.4  s 150 MeV 35 A - 140 ns 150 MeV 150 MV/m 30.

Slides:



Advertisements
Similar presentations
Frank Tecker - BE/OP for the CTF3 Team IWLC 2010, Frank Tecker Critical Review of CTF3 performance Introduction Beam phase Improved operation.
Advertisements

Measurements on phase stability at CTF3 Giulio Morpurgo / CERN IWLC 2010.
UPC participation in the development of BPMs for the TBL of the CTF3 Yuri Kubyshin WORKSHOP ON THE FUTURE LINEAR COLLIDER Gandía, December 3, 2005.
RF Systems and Stability Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
Drive Beam Phase Measurements and Feedback at CTF3 Giulio Morpurgo.
R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 1 CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team 1.
CTF3 commissioning status R. Corsini - CTF3 committee 17 th September 2009 Update on CTF3 Operations and schedule This time I will try to give a more complete.
CLIC Drive Beam Linac Rolf Wegner. Outline Introduction: CLIC Drive Beam Concept Drive Beam Modules (modulator, klystron, accelerating structure) Optimisation.
K. Alam, CLIC workshop, October 16-18, CLIC workshop, October 2007 Working group “ Two beam hardware and integration” Test module in the two.
Drive Beam and CTF 3 International Workshop on Linear Colliders 2010 October 22, 2010 Erik Adli, Department of Physics, University of Oslo and CERN Bernard.
From one module to a long string 6 th CLIC Advisory Committee February 3, 2011 Erik Adli, Department of Physics, University of Oslo, Norway.
Summary of AWG4: Beam Dynamics A. Latina (CERN), N. Solyak (FNAL) LCWS13 – Nov 11-15, 2013 – The University of Tokyo, Japan.
R&D proposals for EuCard 2 EuCard2, April 21Steffen Döbert, BE-RF  SRF basic research (W. Weingarten)  CTF3 and CTF3+, possible infra - structure for.
Drive Beam Linac Stability Issues Avni AKSOY Ankara University.
RF Power production at CTF3 X-band structure collaboration meeting,SLAC 6 th July 2009 Steffen Döbert, BE-RF  30 GHz power production  12 GHz power production.
Low Emittance RF Gun Developments for PAL-XFEL
IWLC - 21st october 2010Califes CTF3 probe beam - Wilfrid Farabolini1 CTF3 Probe Beam Status 1.
TBL as a 12 GHz power source, overview and first results from commissioning IWLC 2010 workshopSteffen Döbert, BE-RF  Current status of TBL  Status of.
CLIC cost estimate Hans-H. Braun, CLIC-GDE meeting, February 8, 2008  Cost model goals  Methodology  Cost distribution  Future improvements.
Current CLIC Energy Stages D. Schulte1. Main Beam Generation Complex Drive Beam Generation Complex Layout at 3 TeV D. Schulte2.
Luminosity expectations for the first years of CLIC operation CTC MJ.
R. Corsini, CLIC Project Meeting October 24, 2012 CTF3 Experimental program for end 2012 R. Corsini for the CTF3 Team 1.
1 CTF3 collaboration meeting 2007 G.Geschonke Status Status of CTF3 G.Geschonke CERN.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
CLIC main activities and goals for 2018 Design and Implementation studies: CDR status: not optimized except at 3 TeV and not adjusted for Higgs discovery,
CLIC Workshop, CERN Marc Ross, ILC Global Design Effort 1 Content: Reason ILC - PM were there – introductory plenary Tolerances and ‘CTF4’.
CLIC TDR Task Force CLIC Zero, cost & schedule considerations R. Corsini.
CTF3 Probe Beam G. A. Blair Royal Holloway Univ. London CTF3 Meeting, CERN 30 th November 2005 Introduction – UK Context Draft Proposal Future prospects.
CLIC Energy Stages Meeting D. Schulte1 D. Schulte for the CLIC team.
Summary of progress towards CLIC goals and next steps for structure testing 6 th X-band collaboration workshop, April 18 th- 20 th 2012 Steffen Döbert,
The SPS as a Damping Ring Test Facility for CLIC March 6 th, 2013 Yannis PAPAPHILIPPOU CERN CLIC Collaboration Working meeting.
CLIC work packages CTF3-003 (TBL+) CLIC0-001 (CLIC DB injector) CLIC0-002 (photo injector option for CLIC DB injector.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
1 R. Corsini – CLIC Project Meeting CTF3 Update CTF3 Update R. Corsini for the CTF3 Team 1.
TBTS Test Program & Schedule G. Riddone
CLIC-ACE, Frank Tecker CTF3 program completion and upgrade to CTF3+ Frank Tecker – CERN for the CTF3 team CTF3 program completion and upgrade.
P. Urschütz - CTF3 Collaboration Meeting 2007 CTF3 commissioning & operation in 2006 P. Urschütz for the CTF3 operations team  Commissioning of the Delay.
Erik Adli CLIC Project Meeting, CERN, CH 1 Erik Adli Department of Physics, University of Oslo, Norway Input from: Steffen Doebert, Wilfried Farabolini,
1 CTF3 collaboration meeting Jan 2008 G.Geschonke Status of CTF3 G.Geschonke CERN.
Injector Options for CLIC Drive Beam Linac Avni Aksoy Ankara University.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
Interface between TAC SR and SASE FEL Possibility for testing CLIC structure Avni AKSOY Ankara University.
Main and Drive Beam Dynamics Working Group Caterina Biscari, Daniel Schulte Attending people ~ 20 ± 5 Presentations ~ 18 (7 from CERN) CL IC 07.
TBL experimental program Status and Results  Introduction  Status  Experimental program for 2010 and beyond  Outlook ACE, Steffen Döbert.
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
X-band Based FEL proposal
BRAINSTORMING ON LASER BASED SOLUTIONS FOR CLIC PRE-ALIGNMENT INTRODUCTION Hélène MAINAUD DURAND, BE/ABP/SU, 09/02/2010 Status of the study CLIC pre-alignment.
Feasibility and R&D Needed For A TeV Class HEP e+e- Collider Based on AWA Technology Chunguang Jing for Accelerator R&D Group, HEP Division, ANL Aug
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
Status of CTF3 G.Geschonke 1CTF3/CLIC Collaboration Board
TBL experimental program, evolution to RF power testing in TBL ACE 2011, February 2-3Steffen Döbert, BE-RF  Current status of TBL  Experimental program.
Drive Beam Complex : Work Package BPH-DRV B. Jeanneret LCWS11, Granada, September 2011 CLIC Drive Beam WP, BJ, LCWS111.
CALIFES A proposed electron beam test facility at CERN
The Engineering Test Facility for nLC
CLIC work program and milestones
First Year of Operation at the Two-beam Test Stand
CLEX Building Layout, Conventional Facilities, TL2, TL2’,
Steering algorithm experience at CTF3
CLEX* Status and Plans CTF3 complex CLEX
Status of the CLIC main beam injectors
Ideas for medium and long term facility upgrade Roberto Corsini for the CLIC Accelerator Collaboration.
TBL, Status, Plans, Experiments
Have a chance to operate your own beam at CERN
CTF3 Collaboration Technical Meeting January 2008
What Should We Do?.
Measurements, ideas, curiosities
Status of the CLIC Injector studies
CLIC Beam Instrumentation
Explanation of the Basic Principles and Goals
CLIC Feasibility Demonstration at CTF3
Presentation transcript:

Drive Beam Injector Drive Beam Accelerator X 2 Delay Loop X 5 Combiner Ring Two-beam Test Area 3.5 A  s 150 MeV 35 A ns 150 MeV 150 MV/m 30 GHz 16 structures - 3 GHz - 7 MV/m 30 GHz and Photo injector test area CLEX TL2 TL1 CTF3 complex Upgrade Options beyond CTF3 Baseline Hans Braun, CTF3 collaboration meeting,

 Evolution of drive beam linac  Consequences of DB photo-injector  Instrumentation Test Beam  TBL, ideas for intermediate program  TBL long term development  Cosmological applications

Add girder 14 Upgrade all MKS to 45 MW Add RF on girders 8,9,10 and upgrade all MKS to 100 MW, 1.5  s tubes, no pulse compression Present girder girder girder girder I Linac [A]I CLEX [A]T [MeV] Evolution of CTF3 drive beam linac

PHIN CTF3 Laser system CTF3 Drive Beam RF Gun If test in CTF2 set-up successful this will be a great leap forward for DBA beam quality. Reduced transverse and longitudinal emittance No satellite bunches No energy tails from bunching Single bunch option will allow Check and correction of beam optics with high precision CSR measurements with high precision in DL, CR and TL2 bunch compressor. δ response of PETS and beam instrumentation …

beam line for beam diagnostics R&D using CALIFES beam Features: low  beam, possibility to achieve very short bunch length, variable time structure, space, accessibility Dedicated beam line for beam diagnostics R&D using CALIFES beam Features: low  beam, possibility to achieve very short bunch length, variable time structure, space, accessibility Didn’t fly as joint JAI-CERN-LAPP proposal in FP7 negotiations, but the disappointing EURO TeV-BPM test last November showed again how desirable such a beamline would be! Dedicated to beam diagnositics R&DDedicated to beam diagnositics R&D With beam well known and characterised at location of test deviceWith beam well known and characterised at location of test device Standard BPM’s up- and downstream of test locationStandard BPM’s up- and downstream of test location Independent of drive beam operationIndependent of drive beam operation Layout of CLEX floor space Instrumentation Test Beam Line, ITB 1.4m D F F D D F F D F D DUMP D F D F F D ITB CALIFES probe beam injector LIL-ACS D F D D F D D F DUMP TBL DUMP 23.2 m D F D F D F D F D F D F D F D F 3.0m D F D F D F D TBTS 16 m TL2’

Test & experiments which could be performed in ITB BPM & WCM developments Coherent diffraction radiation monitors Longitudinal profile monitors Halo monitors Beam loss monitors Single shot emittance measurements Test of CLIC X-band crab cavities Wakefield measurements (i.e. collimators) …

D F FD 22.4 m TBL D F D F D F D F D F D F D F D F TL’ D F FD D DUMP D F FD D F D F D FD F TL’ DUMP D F TBL 2010 TBL 2008, beam test of first TBL PETS D F DUMP ? TBL 2009, 8 PETS structures D F DUMP ? D F FD 22.4 m TBL D F D F D FD F D F D F D FD F TL’ DUMP D F Alternative TBL 2009, test line for single pass collective instabilities Alternatives for TBL evolution until 2010

Option for TBL programme 2009 Prepare and install all quadrupoles and at least a fraction of BPM’s in 2008 Install in shutdown 2008/09 a ~20mm diameter stainless beampipe on 22.4 m length with control of residual gas species and pressure, and complete end of line beam diagnostics. This allows + Understanding and debugging of TBL line decoupled from PETS experiments + Quantitative experiments to benchmark predictions for single pass fast ion instability + Quantitative experiments to benchmark predictions for single pass multibunch transverse resistive wake effect For the latter two items an effect with amplification factor of ~ of initial beam offset expected (B. Jeanneret) Disadvantages - Testing of incoming TBL PETS will be delayed - No “half TBL” experiments

From Frank Zimmermann’s ATF presentation, CLIC meeting

Options for long term use of TBL 1) Power plant for structure testing Advantages +32 RF ports with nominal power for CLIC structure (or 16 with twice the power) +Cheaper than several stand alone X-band sources +Gives incentive to consolidate drive beam operation towards large facility standards Problems - No individual pulselength control of test slots (unless Igor has a smart idea) - Pulse length shorter than CLIC nominal (unless Igor has a smart idea) - Increase of rep. rate to 50 Hz desirable, but requires substantial increase of radiation shielding But don’t say that you don’t believe in testing structures with a drive beam RF source. If you don’t believe this, there is no point to continue to work on CLIC ! CLIC 3 TeV needs accelerating structures. If every structure needs four days of RF processing before installation in the tunnel and we want to build CLIC over 7 years we need CTF3 with a drive beam linac upgraded as outlined before and a TBL extended to 43 PETS could provide 86 RF slots ! RF slots   

Options for long term use of TBL 2) Two beam X-band linac The ultimate, only building limited two beam accelerator in CTF3 ! CLEX CTF2 2.4 GeV

What needs to be done for this ? Upgrade DBA to maximum performance as outline before (Replace all DBA 35 MW klystrons with 45 MW tubes, add MKS 14 and 2 SICA structures on girder 14, Build new modulators MKS08,09 & 10 (space not yet obvious), take DBA PETS line out and add 6 SICA structures on girders 8, 9 &10  This gives 270 MeV drive beam energy for 3.6 A linac beam current. Break wall between CLEX and CTF2 Turn CALIFES by and build a turn around line Extend TBL to 43 PETS structures of same design as other PETS TBL Connect two nominal CLIC accelerating structures to each TBL PETS  This gives a drive beam deceleration by 79% to 58 MeV (final energy similar to present TBL design)  This gives a total instantenous 12 GHz power of 5.5 GW and nominal RF power to 86 CLIC structures with 110 MV/m average gradient. 110 MV/m because CALIFES current is limited to ~ ½ CLIC beam current.  This give an energy gain of 2.17 GeV and final probe beam energy of 2.35 GeV

What can be shown ? If the thing operates over long period (> 1month) stable and with up-time > 90% credibility of CLIC scheme would get a huge boost. Decelerator beam dynamics more realistic, 10.8 betatron oscillations, deceleration to 20% of initial energy. A first step to mass production of CLIC structures Active alignment and stabilisation could be tested over distance of 60 m in presence of beams Problems Modules would not be representative for CLIC, only 2 accelerating structures instead of 4 per PETS Module length different from nominal Poor Probe beam filling factor of 33% Radiation shielding insufficient for rep. rate >5 Hz RF Pulse length shorter than nominal CALIFES cannot give nominal CLIC beam current This gives just the most extreme case all kind of intermediate solutions can be envisaged !

And the probe beam reaches almost nominal energy for Damping Ring Injection ! (2.35 GeV instead of 2.45 GeV)

Tentative long-term CLIC scenario Shortest, Success Oriented, Technically Limited Schedule Technology evaluation and Physics assessment based on LHC results for a possible decision on Linear Collider funding with staged construction starting with the lowest energy required by Physics First Beam TDR CDR Project approval ?

If you believe in this schedule, the next CTF should demonstrate and test fully engineered nominal CLIC prototypes consistent with the TDR. This is in particular true for all components which have to be produced in large numbers, because their production contracts have to be launched in 2017 ! For example one could consider to start building First part of 1 GHz drive beam accelerator injector with nominal klystrons 2 GHz probe beam injector for 2.45 GeV One of the damping rings and put them already in their final location for later use with CLIC ! The testing of 12 GHz components could be continued in an upgraded CTF3 and/or in stand alone 12 GHz sources

Could this be after 2010 an experiment in CTF3 combiner ring in a storage ring mode with hydrogen gas target ? Basic requirements I B >10mA and MeV Very good vacuum and very small beam halo essential required ? Experimental Cosmology in CTF3

 All this can only be considered if a stable beam can be delivered to CLEX with reasonable up time.  Therefore any work on future options is futile without improving the operating conditions of CTF3!  An increase of technical manpower for maintenance, repair, consolidation and upgrade of CTF3 technical equipment is essential!  Spares for critical equipment are urgently needed!