Network Information System Advisory Committee NISAC Activity Report 2007 LTER IM Meeting Wade Sheldon (GCE) Committee Co-chair.

Slides:



Advertisements
Similar presentations
UCSC History. UCSC: A brief history 60s University Placement Committee A lot of field trips/interaction with employers.
Advertisements

Proposal for the Process of Faculty Selection to Committees in the School of Undergraduate Studies History As the School of Undergraduate Studies (UGS)
PHAB's Approach to Internal and External Evaluation Jessica Kronstadt | Director of Research and Evaluation | November 18, 2014 APHA 2014 Annual Meeting.
Building the LTER Network Information System. NIS History, Then and Now YearMilestone 1993 – 1996NIS vision formed by Information Managers (IMs) and LTER.
Sub-Committee on Spatial Water Data 2005 Progress and 2006 Proposed Activities.
Emerging Latino Communities Initiative Webinar Series 2011 June 22, 2011 Presenter: Janet Hernandez, Capacity-Building Coordinator.
April 2, 2013 Longitudinal Data system Governance: Status Report Alan Phillips Deputy Director, Fiscal Affairs, Budgeting and IT Illinois Board of Higher.
IT Governance Steering Committee December 2, 2010.
US NITRD LSN-MAGIC Coordinating Team – Organization and Goals Richard Carlson NGNS Program Manager, Research Division, Office of Advanced Scientific Computing.
 Workshops: March & May 2011 and lots of VTCs! Details at:
What is Chapter Affairs? Global View and Support –Leadership Forum –Chapter Executive Workshop –Chapter Awards Program Liaison between Chapters and ACC.
ClimDB/HydroDB (ClimHy) Integration ClimHy has been migrated from AND to LNO and will remain status quo in 2011 – Public page (
Towards Improvingt the BNZ LTER Core Data Sets. Types of Core Data Climate Hydrology Element Cycling Population Biodiversity.
LTER IM Town Hall Panel Challenges in Integrating Diverse Data for Ecological Synthesis Special Roles & Responsibilities for Information Managers.
LNO/IM Collaboration and Communication Work Group Looking for ways to enhance collaboration between LTER Information Managers (IMs) and the LTER Network.
EcoTrends THE GOOD, THE BAD AND THE UGLY (and lessons learned along the way) OR THE GOOD, THE BETTER AND THE BEST (as JP might say) Christine Laney.
GWG Notes for and from IMC Annual Meeting September IMC 2010 GWG Meeting Agenda -Breakout Group #1 slides -Breakout Group #2 summary slides -Breakout.
Getting Involved in the Research Data Alliance Stefanie Kethers
FAO/WHO Codex Training Package Module 3.2 FAO/WHO CODEX TRAINING PACKAGE SECTION THREE – BASICS OF NATIONAL CODEX ACTIVITIES 3.2 How to develop national.
Controlled Vocabulary Working Group PRESENTED BY JOHN PORTER.
Bonanza Creek LTER Information Management Information Management at BNZ Information Management Data & Metadata Website & Communication Education.
Network Information System Advisory Committee NISAC Review of the LNO ARRA Operational Plan Wade Sheldon & Will Pockman NISAC Co-Chairs.
American Community Survey (ACS) Program Review Webinar March 6, 2012.
LTER Moving from Data to Information Management John Porter.
What’s in place now? The LTER By-Laws Version 3 (things do change over time) What do we need? Additional documentation - to define our Standing Committees.
 Very specific, narrow focus  Google Maps API 1. Moved to LNO 2. Your view into SiteDB 1.Contact info, detailed site description, data links, site boundaries,
TEXAS NODAL Board of Directors Austin, Texas July 15, 2003.
GOVERNOR’S EARLY CHILDHOOD ADVISORY COUNCIL (ECAC) September 9, 2014.
IMC Business Meeting Elections/Nominations 2014 IMC meeting (Corinna) Outside partnerships (time permitting) –SGS (Nicole) IMC Annual Meeting 2013, BNZ.
Office of Performance Review (OPR) U.S. Department of Health and Human Services (DHHS) Health Resources and Services Administration (HRSA) Stephen Dorage.
Controlled Vocabulary VTC June 1, Agenda Review some past activities Plan some future activities.
 Finalize VOCAB “Terms of Reference”  Define use cases for the keyword database and its development  Develop procedures for capturing and managing.
Implementation Strategy July 2002 STANDARDS DEVELOPMENT LIFECYCLE PROCESS ORP Publishes & Maintains 8 Standing Committee Recommends Approval / Disapproval.
Committees. Executive Committee Terms of Reference Committee Type – standing Purpose -. Manage the business and technical affairs of Open Health Tools.
Building the LTER Network Information System. NIS History, Then and Now YearMilestone 1993 – 1996NIS vision formed by Information Managers (IMs) and LTER.
C4K Overview Collaborating for Iowa’s Kids Partnering with Iowa’s Local Schools.
Network Information System EML status of LTER sites Iñigo San GilAug 5th 2005 IM meeting, Montreal ‘05.
Network Information System Advisory Committee NISAC Activities Report Briefing to the LTER IM Committee 26-Jul-2010 Wade Sheldon NISAC Co-Chair.
Tracking national portfolios and assessing results Sub-regional Workshop for GEF Focal Points in West and Central Africa June 2008, Douala, Cameroon.
Seeking SC Feedback on Draft Technology Strategy and Roadmap for EarthCube Draft of 3 November 2015 The Technology and Architecture Committee (TAC) Chairs:
Systems Accreditation Berkeley County School District School Facilitator Training October 7, 2014 Dr. Rodney Thompson Superintendent.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
EML Best Practices for LTER Site Metadata EML Best Practices Committee (Corinna Gries, Margaret O’Brien, Ken Ramsey, Wade Sheldon)
September 18, 2014 Jim West :: Co-Chair, RTF Policy Advisory Committee RTF Policy Advisory Committee Background.
ArXiv Update David Ruddy (for Cornell arXiv team) AAHEP6 November 14-15, 2012 CERN.
LTER GIS Working Group Update Adam Skibbe and Theresa Valentine 2012 June Water Cooler.
Collaborative Project Database Margaret O’Brien, Corinna Gries, Wade Sheldon, Jonathan Walsh, John Porter, Sven Bohm, James Brunt, Suzanne Remillard, Ken.
NSDI Strategic Plan Update January 14, NSDI Strategic Plan High-level Timeline 2 Timeframe Activity Dec - Feb Project Start-up – COMPLETED Feb -
Overview of Proposed Changes to the Special Rules for Procedure of the General Assembly and the Standing Rules for the General Assembly, General Board,
PRESENTED TO: ENERGY FACILITY CONTRACTORS GROUP SAFETY ANALYSIS WORKING GROUP SAFETY ANALYSIS WORKSHOP BY: CHRIS CHAVES NSR&D PROGRAM OFFICE OF NUCLEAR.
The LTER Network Planning Grant Barbara Benson NTL-LTER.
GEONIS. From the IM Proposals Developing “PASTA” ready spatial data for the Network Information System (NIS) – 1. Attend a workshop to create best practices.
U.S. Department of Agriculture eGovernment Program Smart Choice Pre-Select Phase Transition September 2002.
IMExec 2010 Meeting Plan for IMC activities to complement LNO Operational Plan Outline requirements for the EML Conformance Checker and metrics for EML.
THE INTRODUCTION AND SUPPORT OF RESEARCH PROJECTS AS PART OF THE FUTURE ROLE OF THE RCARO Dr Waqar Ahmad Dr John Easey.
Prinath Dias Former RCA Focal Person.  A little history  The policies behind the achievements  Some thoughts for the future.
WP6 – Monitoring and Evaluation 17th November 2014 Rome.
THE INTRODUCTION AND SUPPORT OF RESEARCH PROJECTS AS PART OF THE FUTURE ROLE OF THE RCARO Dr Waqar Ahmad Dr John Easey.
TEXAS NODAL (ERCOT REVISIONS)
IT Governance and Management Structure
Strategies for NIS Development
University Career Services Committee
Proposed Organisation of Evaluation of the Romanian NSRF and Operational Programmes, Niall McCann, Technical Assistance Project for Programming,
Network Information System Advisory Committee (NISAC)
Implementation Strategy July 2002
Building a Distributed Earth System Model Community
Statistics Governance and Quality Assurance: the Experience of FAO
CEOS Organizational Matters
2012 Annual Call Steps of the evaluation of proposals, role of the experts TEN-T Experts Briefing, March 2013.
LTER Controlled Vocabulary Virtual WaterCooler - July, 2018
Presentation transcript:

Network Information System Advisory Committee NISAC Activity Report 2007 LTER IM Meeting Wade Sheldon (GCE) Committee Co-chair

Network Information System Advisory Committee NISAC Overview Standing Committee, established in 2003 Responsible for planning, promoting, and evaluating Network Information System (NIS) activities Accomplishments: Tiered trajectory strategy toward improved IM functionality for synthesis Commitment that individual sites populate and update existing basic network databases (ClimDB, HydroDB, SiteDB) NIS mission statement Criteria for evaluation and acceptance of proposed NIS modules Data access policy review and update IM Review Criteria as a guide for future site and proposal reviews (IMC motion) NIS strategic plan

Network Information System Advisory Committee NISAC Membership IM members Wade Sheldon (GCE) – co-chair Don Henshaw (AND) rotating off Ken Ramsey (JRN) Kristin Vanderbilt (SEV) PI members Deb Peters (JRN) – co-chair Chuck Hopkinson (PIE) Alan Knapp (KNZ/SGS) Will Pockman (SEV) Libe Washburn (SBC/MCR) LNO members James Brunt Bill Michener Mark Servilla John Vande Castle

Network Information System Advisory Committee Report from the May 2007 Meeting Changed committee structure (PI & IM co-chairs) Discussed CI Strategic Plan (CI Core Team) Concluded plan essentially complete, deliver to EB Recommends initiatives be advanced to possible funding sources (advice sought on sources) NISAC agrees to assume oversight of implementation Subcommittee (Vanderbilt, Pockman, Ramsey) working to define critical site and network functionality - comments sought by IMC during Aug meeting Lead PI & IM will be asked to cost out critical site functionality recommendations in Nov. 2007

Network Information System Advisory Committee LNO NIS Review Reviewed NIS projects and priorities at LNO – approved without changes Discussed EcoTrends project and PASTA architecture Recommended changes to presentation, nomenclature to better match science concepts Endorsed development/use of PASTA for future NIS modules Discussed proposed network data access auditing (data access proxy server) RFC sent to IMs NISAC endorses approach to support data access policy Recommend prototype be presented to IMC for comment Recommend provide technical documents to external software projects (SEEK/Kepler) to assess compatibility, coordinate future development

Network Information System Advisory Committee IMC Recommendations Discussed IMC activities as pertain to NIS Identified ongoing activities that will advance network-level goals Controlled vocabulary Improved data searching, identification Network standardization Aid application development (e.g. browse interface) Unit dictionary Improve efficiency, consistency of EML Potential for centralized services for metadata

Network Information System Advisory Committee 2007/2008 Priorities CI implementation and funding strategies

Network Information System Advisory Committee NISAC Role in LNO-IMC Collaborations NISAC currently under-utilized to coordinate priorities between LNO developers and IMC Recommend IM working groups keep NISAC informed of any LNO/NIS resources needed to further their goals IM co-chair best point of contact (can advise and get IMC priorities onto the agenda) Wade Sheldon NISAC can also assist LNO in requesting permission from site PIs for IM participation in network projects (and acknowledging/rewarding participation)