Production and installation plan Construction sharing Production plan Installation sequence Material procurement P. Campana LNF – LHCb Muon EDR Cern April.

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Advertisements

Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
Status of the ATLAS MM project
Planning a Mentoring Program A CALENDER FOR A FIRST-YEAR TEACHERS’ PROGRAM.
Construction material – All the material has been ordered with some spare (10%) Material Procurement Faraday cage – Final FEE board dimensions available.
Production Readiness Review of Frascati MWPC Production Site December 4 th, 2003 – P. Campana.
LHCb MUON MPWC STATUS OF TOOLING, SITES, PRODUCTION AND MATERIAL PROCUREMENT.
Ferrara 8 june 2004M.Savrié1 Production Readiness Review Ferrara MWPC Production Site.
RICH WG M.Lenti. Outlook Mirror Support Vidyo meeting on June 12, 20, 27 and on July 4 and 11 RICH WG meeting on august 27  Vessel status (see Ferdi’s.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
Status of CERN M1R2 production LHCb Muon meeting sept.061Thomas Schneider -Beginning of 2006 two visits to Erbicol because of several reasons: -Material.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
The Bigbite second GEM tracker. SBS GEM Trackers Front Tracker Geometry x6 18 modules In Italy  50 cm x 40 cm Modules are assembled to form larger chambers.
Status of production at LNF E. Dane, C. Forti, D. Pinci, A. Sarti – LHCb Muon CERN 25-may-04 Monday 24-may: closed chamber 30. Will close 2 more this week.
MWPC sandwich panels C.Forti INFN-LNF / LHCb-MUON EDR CERN 16 th April sandwich panels typologies of cathodes the mould the production procedure.
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting.
G. Carboni – Muon Meeting – April 2002 Muon Meeting LHC schedule is now official (Council Committee) First protons (Pilot run) delayed to
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
1 DT critical items status: HVBoards Control and Trigger Boards Assembly in Torino fgasparini june 2004.
1 Semi-Digital Hadronic CALorimeter Prototype planning CIEMAT, Gent, IPNL, LAL, LAPP, LLN, LLR, LPC, Protvino, Tsinghua, Tunis I.Laktineh.
11/05/2000Wire Chamber Working Group Visit to Fermilab Participants: –Giulio Auriemma, Thomas Schneider, Burkhard Schmidt General Remarks: –Visit was organized.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
Status of MWPC production and quality control The measure of the gas leakage, is obtained by correcting the P(t) behavior by using the data of the reference.
Panel production status Panels needed according to official plan Oct-05 A rate of 250/month is mandatory to match the chamber production schedule.
Calendar for 2011 Months of the Year with Holidays.
09/07/20021Muon Meeting Status of MWPC activities at CERN and PNPI Outline: Module 0 status and plans –M3R1 (CERN) –M3R2 (CERN) –M3R4 (PNPI) Tooling status.
9 March 2005OT Meeting - LHCb week - Production and QA, Niels Tuning 1/19 Outer Tracker Module Production at NIKHEF Produced 60 modules  Production Progress.
March 2005, USCMS Trigger video meetingD. Acosta1 Revised Schedule for SP Pre-Production Continued testing of first two pre-production boards over next.
1 ME1/1 ODMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
Material procurement Panels 1300 produced (over 5700 planned) – Stop of the production in August (still at 50% of FR4 sheets delivered by ELTOS) – Restarted.
G. Carboni - Muon Meeting – Draft Agenda Muon Meeting 6 April 2004 Introduction (15 min) Total 15 min MWPC prodution Material supplies,
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
SunSatFriThursWedTuesMon January
Muon Meeting April 2004JsG Status of Chambers Production at CERN Jean-Sebastien Graulich o Open Questions from the PRR O-ring Aging, Aging tests, Storage.
G. Carboni - Muon Meeting – Muon Meeting 12/ Agenda IntroductionGiovanni (30’) GEM and TDR AddendumWalter (20’) Update on M1 ratesAlessia.
Status Report on the Muon System Alessandro Cardini / INFN Cagliari (with the help of the whole Muon Group)
PHIN Fabrication of a photo-injector for the CTF3 accelerator and for the NEPAL test stand WP 4 of the JRA2 PHIN 1.Status of the construction of RF guns.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
ATLAS Pixel Detector September 2002 N. Hartman LBNL 1 Pixel Support Tube: Cost and Production Schedule September 2002.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
CMS 1.Goal of the experiment CMS is a general purpose apparatus for LHC designed to study the physics of p-p collisions at the center-of- mass energy of.
15/6/2006Gaia Lanfranchi - LNF-INFN1 Why do we have to measure efficiencies in the Muon Detector? Muon Software Meeting, June 15th G. Lanfranchi LNF-INFN.
Status of production at LNF E.Dane’ and C. Forti – Meeting with LHCb referees Firenze 14-mar-05 Christmas 3 ch/week Ch. 43.
G. PassalevaFirenze - September 8, 2004 Production Readiness Review Firenze MWPC Production Site G. Passaleva.
19/6/2002S. Patricelli Muon week1 Status of RPC production (1) zThe leading production for RPCs is the the gas volume production at GT. All other items.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
Trigger efficicency on double tracks Trigger efficiency on isolated tracks Final results of the Trigger Test on the 25ns beam Bx NUMBER Fraction of Triggers.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
27 December 2006 LHCb Status Report (A.Vorobyov) 1 LHCb.
1 Chamber Interfaces Adalberto Readout-, I2C-, HV-, LV-, Gas- and chamber support interface. Space issues.
Activity report from LNF Panels Soldering tests Production site and tooling status WPC miscellanea (+7 cm layout, cathode costs, aging tests)
News from PNPI Presented by N. Bondar for B. Bochin Cagliari 8/10/2015.
CMS – RPC GIF++ G. Pugliese on behalf of the RPC Collaboration 1.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
WP2 (Detector development) Summary Gabriella Pugliese INFN – Politecnico of Bari.
ELENA installation progress F. Butin / ELENA collaboration.
LIU Wire Scanner Milestones June 2017
G. Carboni for the Muon Group
MicroMegas Mechanical Meeting --- Cern April 2014
Status of MWPC production and quality control
CMS Goal of the experiment
LHCb Muon Detector MWPC & GEM
April May April May June July July June August Sept August
PNPI – M3R4 – Panels 70% - HV bars 100% - FR4 frames 100%
February 2007 Note: Source:.
2015 January February March April May June July August September
Presentation transcript:

Production and installation plan Construction sharing Production plan Installation sequence Material procurement P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003

Production share SiteChambers no. (*) TypeStart datePRR PNPI1423M2R4 – M3R4July, 2003Sept, 2003 LNF290M1R3 – M1R4 – M3R3 – M5R3 July, 2003Sept, 2003 CERN79M2R1R2 – M3R1R2July, 2003Sept, 2003 FERRARA264M1R4 – M2R3 – M4R3 M4R1R2 – M5R1R2 October, 2003to be settled FLORENCE211M5R4January, 2004to be settled PNPI2211M4R4June, 2004to be settled (*) 10% spare included (exact amount of spares to be quantified)

10% by March ’04 50% by February ’05 100% by May ‘06 Assuming : Training periods 10% spare 80% global efficiency of each site (holidays included)

Important milestones: Muon filter ready: 12/2004 Gantry and Support structures ready: 6/2005 Muon chamber and electronics installation completed: 7/2006 Muon System commissioned: 9/2006 Installation Overview

Production and installation sequence

Material procurement flow PANELS

Material Specifications

Preproduction organization Prepare material for the startup of CERN, PNPI, LNF, Ferrara (5% of production) and ensure a safe margin before large tenders are completed (hopefully by beginning ’04) This plan already financed by INFN in 2003

By the end of April - mid May sending out orders for Fr4 panels and cathode pads HV bars Lateral and closing bars Gas connectors Panel preparation (300 pieces) R & C Consumable material (glue, pins, etc...) (100 km of wire already in hand) In June we should start panel preparation

“Back of the envelope” costs numerology Total cost of the material for MPWC (as of today) : 2.2 MSF No. of chambers : 1400 (approx, incl some spare) Cost per chamber = 1.57 ksf Active area covered 470 m2 (x 4 wire layers) Cost per m2 = 4.7 ksf

Conclusions The production plan is at a good level of understanding and will be validated by the experience to be acquired with the startup (>> yield) We acknowledge the tightness of the plan, although we would like to stick to it as much as possible as the contingency of the production is very little A potential problem is represented by the long time needed for material procurement both for the complicated financial environment of the LHCb Muon System (after Brasil default) and the bureaucracy of tenders A green light on an item today means having it not earlier than six-to- eight months. This is a difficult problem for procurement and we are thinking how to circumvent it