Presentation on TCS By : 1. Ershad Islam 2. Maung Han Soey 3. Shaon Shahriar 4. Ahsanul Haque.

Slides:



Advertisements
Similar presentations
Chapter 3: Planning a Network Upgrade
Advertisements

Antonio González Torres
Chapter 7: Intranet LAN Design
TCS – Sunset Elementary Pat Bruen, Conor Buckley, James Gallagher
Module 5 - Switches CCNA 3 version 3.0 Cabrillo College.
CIT 470: Advanced Network and System Administration
Campus LAN Overview. Objectives Identify the technical considerations in campus LAN design Identify the business considerations in campus LAN design Describe.
Cisco 3 - Switches Perrine - Brierley Page 15/10/2015 Module 5 Switches LAN Design LAN Switches.
Threaded Case Study on RE Miller By Aidan Coleman Paul Guilfoyle.
Threaded Case Study - RE Miller (Nick Effler, Brian Ford, Cindy Coultas & Teresa Duchardt) April-May, 2000 b Project Goals Implement WAN Access to connect.
1 © 2003, Cisco Systems, Inc. All rights reserved. CCNA 3 v3.0 Module 5 Switches.
1 Version 3.0 Module 8 Virtual LANs. 2 Version 3.0.
Washington District Networking Project Presented by Pat Kearney Pauric Fahey Seamus Leyden.
Cisco – Semester III Documentation. What is it most important component of a good network?  Documentation.
Ch.6 - Switches CCNA 3 version 3.0.
IT. Support Networking Threaded Case Study School: R.E. Miller By: Shane Coyne. Andrea Martyn. Gary Hall. Barry Gray. Presented by: Gary Hall & Andrea.
ROYAL PALM NETWORK PROJECT John Healy Tom Jamieson
Networking Project Ailis&Louise. General Requirements The Washington School District is in the process of implementing an enterprise wide network which.
Institute of Technology, Sligo Dept of Computing LAN Design Semester 3, Chapter 4.
1 CCNA 3 v3.1 Module 5. 2 CCNA 3 Module 5 Switches/LAN Design.
STEP-BY-STEP LAN DESIGN FOR A SMALL BUSINESS
THREADED CASE STUDY SUNNYSLOPE Presented to Michael Barrett and Paul Flynn.
ACACIA Threaded Case Study Seamus Burns Ronan Conaghan Eugene Cullen.
Acacia Threaded Case Study Aoife McIntyre Cordelia Carty Mary Kearns.
ACACIA Threaded Case Study Presented By: Louise Maguire, Caroline Kearney, Peter Honeyman, Michael Mctague.
Mitsubishi MotorsCebu Corporation Threaded Case Study-Local Area Network.
Treaded Case Study Computer Networks 2002 Daire Sheriden Ronan Monaghan Mark Gilmore.
How to Build a CAN Last Update Copyright Kenneth M. Chipps PhD 1.
Cable.ppt CCNA Exploration Semester 1 Chapter 10
Cisco’s Threaded Case Study Desert View
In The Name Of Allah Whose Blessings Are Uncountable.
LAN Review. What is a Network? A group of computers and devices connected together for the purpose of sharing resources and services.
Internet Engineering Course Network Design. Contents Planning Network Configurations ◦ Hierarchical Model ◦ Planning Addressing scheme Case Studies (SSN,
Cisco Threaded Case Study
By H.B.O. Systems July 13, 2000 Presenters: Janet Hughes, John Banister, Karen Oliver.
LAN Design of a Local High School Martin Kucek Chris C. Yu Sandy Ramirez Cisco TCS Project – Semester 3 © 2001 Martin Kucek / Chris C. Yu / Sandy Ramirez.
Threaded Case Study for Phoenix, AZ. School District Sunny Slope & Sunset Elementary present by Todd Thousand, Bill Siepel, and Jeff Moore.
Robert E. Meyers CCNA, CCAI Youngstown State University Cisco Regional Academy Instructor Cisco Networking Academy Program Semester 3, v Chapter.
CTC 228 – Computer Networks Fall 2015 Instructor: Robert Spengler.
Washington School District Project. General Requirements: Functional =7-10 Years 100X Growth in LAN 2X Growth in WAN 10X Growth in Internet Connectivity.
Desert View TCS By Charlene Cooley and Dan Austin.
1 Semester 3 Threaded Case Study Royal Palm A/3B Ip Siu Tik Tsang Man Wu Wai Hung Wong Lai Ting.
1 © 2003, Cisco Systems, Inc. All rights reserved. CCNA 3 v3.0 Module 5 Switches.
1 CCNA 3 v3.1 Module 5 Switches Claes Larsen, CCAI.
LAN DESIGN – first step 5 ISB – school year 2006/07.
Cisco 3 - Switches Perrine - Brierley Page 112/1/2015 Module 5 Switches.
1 Ram Dantu University of North Texas, Practical Networking.
LAN Design Semester 3, Chapter 3. Home End Table of Contents Go There! Go There! Go There! Go There! Go There! Go There! Go There! Go There! Go There!
LAN DESIGN Akhyari Nasir TATiUC.
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.1 Planning a Network Upgrade Working at a Small-to-Medium Business or ISP – Chapter.
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public ITE PC v4.0 Chapter 1 1 Help Desk Working at a Small-to-Medium Business or ISP – Chapter 2.
The Washington School District Mike, Mark, Joy, Armando, & Mona.
Network design Topic 2 Existing network infrastructure.
Practical Networking.
Discovery 2 Internetworking Module 3 JEOPARDY K. Martin.
Network Proposal for Mountain Sky Elementary School
1 © 2004, Cisco Systems, Inc. All rights reserved. CCNA 3 v3.1 Module 5 Switches.
Sally Marable MEDT 7477 Spring Hull-Sanford Elementary School uses a client-server Ethernet network with a star topology. The Main Distribution.
Threaded Case Study of Bangladesh Internet Press Ltd. (BIPL) By: Md. Ikbal Zavid Abul Kalam Asad Supervise By: Debanon Datta Legal Main Contact, CNAP Ahsanullah.
Introduction to Networks v5.1 Chapter 4: Network Access.
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public ITE PC v4.0 Chapter 1 1 Planning a Network Upgrade Working at a Small-to-Medium Business or.
Semester 3 The Final Exam?? Fastest Card Question 1 A) MAC addressB) Software specifications C) Hardware specificationsD) Configuration of peripherals.
Threaded Case Study Acacia School Project Project Members: Md. Shafayet Hossain Md. Shakhawat Hossain Md. Moniruzzaman Md. Maksudur Rahman.
CCNA 3 v3 JEOPARDY Module 5 CCNA3 v3 Module 5 K. Martin.
LAN Design Broadcast and Collision Domains
CCNA 3 v3.1 Module 5 Switches.
Essentials of Networking
Module 5 - Switches CCNA 3 version 3.0.
Switching Basics and Intermediate Routing CCNA 3 Chapter 5
Ram Dantu University of North Texas,
Presentation transcript:

Presentation on TCS By : 1. Ershad Islam 2. Maung Han Soey 3. Shaon Shahriar 4. Ahsanul Haque

26 October, 2005 CORE SECTION OF THREADED CASE STUDY Local Area Network Wide Area Network Configuration Equipment Description

26 October, 2005 Location Map of Study Area

26 October, 2005 BUILDING 1 FLOOR 1

26 October, 2005 BUILDING 1 FLOOR 2

26 October, 2005 BUILDING 2 FLOOR 1

26 October, 2005 BUILDING 2 FLOOR 2

26 October, 2005 Local Area Network Considering the Physical Setup of DHL We have divide the total office into 3 main section : 1. Main Distribution Facility – MDF 2. Intermediate Distribution Facility 1 - IDF-1 3. Intermediate Distribution Facility 2 - IDF-2

26 October, 2005 Physical Location of MDF & IDF1

26 October, 2005 Physical Location of IDF2

26 October, 2005 Documentation of Cable Runs Vertical Cabling - Optical Fiber from MDF Horizontal Cabling from MDFMDF IDF-1 Horizontal CablingIDF-1 IDF-2 Horizontal CablingIDF-2

26 October, 2005 IP Network Addressing – BD DHL LAN IP Host Requirements - Service Network IP Host Requirements - Administration Network Workstations24 x ServersConservative Estimate20 Managed Hubs1 per room47 Managed Switches1 per wiring closet3 Router Interfaces1 Total1179 hosts Workstations24 x 124 ServersConservative Estimate20 Managed HubsNone0 Managed Switches1 per wiring closet3 Router Interfaces1 Total48 hosts

26 October, 2005 IP Addressing Scheme Proposal Employee LAN Administrator LAN Subnet Address Subnet Mask (21 bit) Number of Hosts2046 Address Range to Subnet Address Subnet Mask (24 bit) Number of Hosts254 Address Range to

26 October, 2005 Common Servers File and Print Servers Servers Servers on the employee Network –DHCP Server –DNS Server –Application Server –Proxy Server Servers on the Administration Network –FTP

26 October, 2005 Server Placement Design – BD DHL

26 October, 2005 Physical Segregation of Networks

26 October, 2005 Logical Segregation of Networks using VLANS

26 October, 2005 WAN Topology and Design Core WAN Connectivity –FDDI –Private fiber Access Layer Connectivity –Point-to-Point Serial Connections –Frame Relay

26 October, 2005 IP Addressing Proposal Subnet Address Allocation - Service LANService Subnet Address Allocation - PPP WANPPP Administration LANAdministration Mask BitsSubnet MaskNumber of SubnetsHosts per Subnet

26 October, 2005 Network Management Facilities Management Workstation (MWS) SNMP Management Software System Log Server SNMP Trap Receiver Fire-walls Proxy Server Mail Server

26 October, 2005 WAN Security

26 October, 2005 BD DHL CONFIGURATION LAN Security Requirements Traffic from Service to Administration LANsTraffic from Service to Administration LANs ACL Rules - Permitted Traffic - (SMTP) (SMTP) - Domain Lookup and Directory ServicesDomain Lookup and Directory Services - SNMP TrapsSNMP Traps - Responses to RequestsResponses to Requests - BD DHL Router ConfigurationBD DHL Router Configuration

26 October, 2005 Belkin CAT 5e Bulk Patch Cable feetCable Belkin 24-port CAT5 Patch PanelPatch Panel Belkin 48-port Angled CAT5 Patch PanelPatch Panel Belkin RJ45 PlugPlug Belkin White Steel Equipment CabinetCabinet Belkin White 13/4" RacewayRaceway Belkin White Category RJ45 JackJack American Power Conversion SMART-UPS 2200NET 2200VA LINE INTLAN 9.2MIN-FULL 8-OUTLETS W/SWUPS ACCESSORIES

26 October, 2005 CABLE, HUB & NIC USED Belkin Multimode Duplex Fiber Optic CableCable Belkin 250' Gray CAT5e Horizontal UTP Bulk cablecable Cisco1538 Ethernet/Fast Ethernet 8 Port RJ45 Micro Stackable Hub ManagementHub 3Com Office Connect Fast Ethernet Network interface card 10/100 Auto-sensingcard SERVERS IBM xSeries IBM xSeries

26 October, 2005 SWITCH and ROUTER Cisco Systems CATALYST ports 10/100 Mb/s and two GBIC- based Gigabit Ethernet based ports, 1.5 Rack-unitEthernet Cisco 7204VXR RouterRouter