ESS Bunker A concept for a common beamline interface. ISIS Engineering Group, February 2015 For illustration purposes a conceptual CAD model of the VOR.

Slides:



Advertisements
Similar presentations
Abstract Mechanical Inspection and Survey Steven Seiler, NSLS-II Project The Survey and Alignment Group is often the first and last to work with the Storage.
Advertisements

General Information Dimensions · Structure Width: ~ 197in. (16.4’), 99in. (8.2’)/car · Slope Angle: 5 degree · Structure Height (Front): 100in. + base.
RIGHT HAND CARTRIDGE UNIT AS CAN BE SEEN FROM THE PHOTOGRAPH,THE UNIT IS OFFERED UP TO THE END OF THE BED AND MARKED THROUGH AT LEAST THREE POINTS FOR.
Spiral Stairs Assembly Instruction By Laser Dollhouse Designs
G.Barber Tracker Planning & Mechanical Preparation June Tracker Planning & Mechanical Preparation An outline of (known) outstanding work to be carried.
Instrument Space Requirements Rob Connatser Chief Instrument Project Engineer November 2014.
Robot Build IT Girls Allowed 2014 Updated 14 th August.
UCN Phase 2 Design Status September 10, Design Components Bulk Shielding Target Crypt Cryogenic Insert Target Insert UCN Port Beam Window Cooling.
MICE Alignment and Support Structure Tony Jones and Yury Ivanyushenkov Engineering Department RAL.
G.Barber Mice Tracker Mechanical Progress Imperial Tracker Update Contents:- Components Station Layout Light Guide Map QA Patch Panel Alignment.
Tracker Refurbishment. What was done… Over the past 3-4 months Trackers 1 and 2 have been refurbished. What does this mean? The trackers were removed.
Setup of laser tracker on DX side NOTE: X axis along M1s centers, towards SX Z axis along M1-M2 centers, towards M2.
B ASEPLATES S LIDE S HOW. Anchor Bolts are positioned and placed in the concrete before it cures. Plastic caps are placed over the anchor bolts to protect.
Addendum to EDMS document “Instruction Manual for inserting the CMS ZDCs using the HXTC crane” In addition to the ZDC detectors in the TAN instrument.
SQXF Shell & Yoke Assembly Procedure
LINEAR MEASUREMENT.
ALIGNMENT DESIGN AND STATUS OF TAIWAN PHOTON SOURCE WEI-YANG LAI October,
Critical Points Layouts For Storage Ring and Beamlines Ken Chow March 14, 2014.
By Cody Lee Thomas Lopez Chris Sedillo. 1) Split up the work evenly. 2) One person one task per class. 3) Regularly check on others progress and fill.
Recent BTH West Vibration Study for LCLS-II James L. Turner and Alev Ibrahimov February 07, 2012.
ZDC Remote Handling Tool Structure and Force Analysis P. Debbins University of Iowa December 10, 2009.
1 Target Station Design Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory EuroNu Annual Meeting 2012.
1 Target Station Design for Neutrino Superbeams Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory NBI 2012, CERN.
Survey, Alignment and Metrology Fiducials Requirements Fabien Rey ESS Survey, Alignment and Metrology Group ACCELERATOR TECHNICAL BOARD 23/09/2015.
Survey, Alignment and Metrology Fabien Rey Pawel Garsztka ESS Survey, Alignment and Metrology Group.
Survey, Alignment and Metrology Fabien Rey Pawel Garsztka ESS Survey, Alignment and Metrology Group Interface Workshops for ESS Warm-Linac: ISrc - LEBT.
Side view of generator. Close up of unused grounding pad - gives provisions for mounting the absorber.
RICH1 Gas Enclosure Installation. Experimental Area Meeting at CERN on 21st June 2006 Bill Cameron (Imperial College London) on behalf of the RICH1 team.
TURBO REBUILD TURBO REBUILD. Step 1 Step 1: - Using the small pick or screwdriver, walk the tiny snap ring back into the groove on both the compressor.
G.Barber Mice Tracker Integration Harbin Jan Mice Tracker Integration Installation requirements & Procedure.
Monolith design update – Emphasis on Neutron beam extraction design
Tracker 1. Status 2. Expected delivery date of system to RAL 3. Required support infrastructure needed for setup and initial debug. Things like vacuum,
Design of a Precision Robot Wrist Interface
FETS meeting, 14th February 2007 Peter Savage The Front End Test Stand Collaboration 1 Finalising the design of the FETS main support stands.
Map Reading and Interpretation
Recommendations on Supports and Adjustment systems for ESS LINAC Components Fabien Rey Pawel Garsztka ESS Survey, Alignment and Metrology Group.
Retaining Wall Construction Building A Block Retaining Wall Developed by: Dr. Teri Hamlin Georgia Department of Education.
GLAST LAT ProjectDec 17, 2003 Page 1 GPR Design & Requirements Grid Perimeter Ring (GPR) Design –Ring is comprised of four lengths of Aluminum bolted together.
Securing Methods. Content 1.Axial Anti-Rotating Screw (Press-On) 2.Axial Anti-Rotating Screw (Press-In) 3.Radial Anti-Rotating Screw.
This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC Michigan State.
RAMI Paul Aden. RAMI Analysis Reliability Visual inspection during each shutdown Service schedule for necessary components Majority of components to have.
Annex 4 - Moving Frame and Whiffletree assembly
F.E.T.S. Mechanical Engineering Update
MICE Partial Return Yoke Mechanical Design
Module 6 Antenna Assembly and Look up Angles
SHMS Downstream Beamline Large SHMS/HMS Angles (Config-1)
FIRST Long Island Presented by School-Business Partnerships of Long Island, Inc.
BASEPLATES SLIDE SHOW.
FIGURE 31-1 Prelubricating the engine is a very important step that should be performed before starting the engine. Notice that oil is flowing through.
Additional Upstream Coil Shielding
Alignment of Main Linac Cryomodule (MLC)
Cryomodule Assembly Plan
MERIT Beam Collimator Design
Location and Alignment devices
Roof design Bunker Project CDR
Rad safety and activation
Mounting & Movement Stages, Motion Stacks & ESS Requirements
Senad Kudumovic Design engineer
The Mechanical Engineering & Technology (MET)
IKON 15 Talal Osman & Iain Sutton
SOHO Instructions Cut out the lower bus bottom panels, sides, and top deck. Glue bottom panels together. Fold the side panels on the lines, bending tabs.
Neutron guide Shielding Concept
April 19th 2017 Work Unit AIK CDR of the CDS-SL Installation integration.
Bunker Wall Design Wall
Bunker Wall Design Wall ESS
Technical Updates Gábor László NSS Lead Instrument Engineer
Bunker Project Operation aspects
Bunker Project Integration/Interfaces
Mounting & Alignment Malcolm Guthrie
Presentation transcript:

ESS Bunker A concept for a common beamline interface. ISIS Engineering Group, February 2015 For illustration purposes a conceptual CAD model of the VOR instrument is used.

ESS Bunker alignment concept. Levelled steel location rings protruding above concrete level and at 1m radial spacing containing dowel location pins in a radial pattern at 3° intervals. Lowered concrete levels to remove shine paths Beam port height and centreline alignment marks Beam port centreline alignment marks in addition to laser tracker network Tapped holes or “T” slots to enable bolting down of components.

How would this work? 1.Build leveled steel rings into the concrete base. 2.Fit all dowels as accurately as practical (±1mm). 3.Number, survey, and record all actual dowel locations. 4.Build beamline bases incorporating a dowel location hole and a location slot with location assisting chamfers (yellow). Ensure 3 feet to prevent rock (red)

How would this work? Continued… 5.Fit adjustable kinematic mounts (Cone, Vee, Flat) between beamline component and base. Adjustment to be on beamline component not base. 6.Fit laser tracker nests to top of beamline component such that it can be surveyed from above. 7.Offline set up 2 dummy dowel pins. Fit base and beamline component. Align onto beam centre relative to dowels and record tracker mount positions relative to beam center. Laser tracker nests Kinematic mounts Dowel location hole and slot

How would this work? Continued… 8.Install pre-surveyed bases and lower shielding components. 9.Locate beamline components onto pre-set kinematic mounts. 10.Confirm actual location & alignment using laser tracker from above. 11.To correct any alignment remove component and adjust offline using kinematic mount adjustment. 12.Re-install and confirm alignment with laser tracker. Shielding blocks coloured purple rest on the lowered concrete floor sections to remove radial neutron shine under the base shielding blocks David Turner 06/02/2015