Presentation is loading. Please wait.

Presentation is loading. Please wait.

By Cody Lee Thomas Lopez Chris Sedillo. 1) Split up the work evenly. 2) One person one task per class. 3) Regularly check on others progress and fill.

Similar presentations


Presentation on theme: "By Cody Lee Thomas Lopez Chris Sedillo. 1) Split up the work evenly. 2) One person one task per class. 3) Regularly check on others progress and fill."— Presentation transcript:

1 By Cody Lee Thomas Lopez Chris Sedillo

2 1) Split up the work evenly. 2) One person one task per class. 3) Regularly check on others progress and fill them in on new developments. 4) We will act as a democracy and vote for disagreements. 5) People will be responsible for what they are asigned.

3 1) No Work No Grade

4 Preassembled Speaker Holder Manufacturing Fixture (preassembled)

5

6

7  Speaker Support System Design Brief   Client:  Your classroom teacher   Designer:   Problem Statement:  The teacher does not have sufficient space in the classroom to utilize a set of quality speakers. One speaker sits on the floor and one sits on top of a bookshelf, thus occupying space that is needed for classroom activities and storage. Also, the sound quality is poor due to the current arrangement.   Design Statement:  Design a speaker support system that will allow the two speakers to be securely mounted to the classroom’s concrete block wall(s).   Constraints:  Design must be ready for manufacturing in 2 weeks.  Each speaker is 12”H x 9”W x 9”D.  Each speaker weighs 10 lbs.  The system must be able to fit in a 11”x 8.5”x 5.5” USPS Priority Mail Flat Rate Box for shipping purposes (not including the speakers).  The system must weigh under 20 lbs (not including the weight of the speakers).  Must be mechanically fastened to a concrete block wall (mechanical fasteners provided by the clients).  System must allow speakers to be adjusted by tilting forward/backward and panning left/right. 

8

9

10  Manufacturing Fixture Design Brief   Client:  Acme Manufacturing Co.   Designer:   Problem Statement:  Acme Manufacturing Co. has taken on the responsibility of drilling the finish holes in one of the components of a nutcracker device. The base component, part #1, is a casting that requires multiple drilling operations before it can be shipped off for final assembly with the other nutcracker components.   Design Statement:  Design a fixture or series of fixtures to be used on a drill press that would produce the holes for the axle rod, the hole for the crusher ram, and the tapped hole for the reversible anvil.   Constraints:  Must work with a standard drill press.  Must incorporate De-Sta-Co manual clamps and precision ground dowel pins. 


Download ppt "By Cody Lee Thomas Lopez Chris Sedillo. 1) Split up the work evenly. 2) One person one task per class. 3) Regularly check on others progress and fill."

Similar presentations


Ads by Google