MQXF Workshop on Structure, Alignment, and Electrical QA – Feb 2-4, 2016 Requirements and feedback form LARP structure review Ruben Carcagno February 2,

Slides:



Advertisements
Similar presentations
1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
Advertisements

Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
MICE Collaboration meeting at CERN March 28 – April 1, 2004 MICE Cooling Channel --- AFC Module work group report Wing Lau – Oxford.
CS Integration Management (Part 6) Bilgisayar Mühendisliği Bölümü – Bilkent Üniversitesi – Fall 2009 Dr.Çağatay ÜNDEĞER Instructor Bilkent University,
Release & Deployment ITIL Version 3
S/W Project Management
Server Virtualization: Navy Network Operations Centers
Software Engineering Chapter 15 Construction Leads to Initial Operational Capability Fall 2001.
LARP review, Fermilab, 6/10/2013Magnet Project Overview – G. Sabbi 1 HL-LHC IR Quadrupole Magnet Project Overview GianLuca Sabbi Internal Review of proposed.
OSF/ISD Project Portfolio Management Framework January 17, 2011.
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
HL-LHC/LARP, QXF Test Facility Workshop– R. Carcagno QXF Test Requirements Ruben Carcagno BNL Workshop December 17, 2013.
Rev. 0 CONFIDENTIAL Mod.19 02/00 Rev.2 Mobile Terminals S.p.A. Trieste Author: M.Fragiacomo, D.Protti, M.Torelli 31 Project Idea Feasibility.
Thoughts about the MQXF development plan P. Fessia Thanks to discussions within the MDT section (P. Ferracin, J. C. Perez, E. Todesco, P. Ferracin), L.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
BSBPMG505A Manage Project Quality Manage Project Quality Project Quality Processes Diploma of Project Management Qualification Code BSB51507 Unit.
11 FSO Assessment of Fermilab QA Program Status September 14 – 18, 2009.
LARP Prototype Assembly Steps Towards Q1 and Q3 Production Dan Cheng MQXF Design Review December 10-12, 2014 CERN H. Felice, R. Hafalia, D. Horler, T.
LARP Prototype Assembly Steps Towards Q1 and Q3 Production Dan Cheng MQXF Design Review December 10-12, 2014 CERN.
OFFICE OF SCIENCE 2.3 Infrastructure and Installation Sims, Edwards 1.Does the conceptual design and planned implementation satisfy the performance specifications.
1 BROOKHAVEN SCIENCE ASSOCIATES ASD Procurements Gregory Fries Liaison/Manufacturing Engineer NSLS-II ASAC October 22-23, 2009.
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
Title – xxxx 1 LARP & US-HiLumi Contribution to the Inner Triplet Quadrupoles G. Ambrosio Cost and Schedule Review CERN, March 9 th -11 th 2015.
Apply Quality Management Techniques Project Quality Processes Certificate IV in Project Management Qualification Code BSB41507 Unit Code BSBPMG404A.
11 T Dipole Informal Coil and Assembly Readiness Review CERN September 2013 Review committee: Herman Ten Kate CERN (Chair) Fred Nobrega FNAL Davide.
Progress to Date PPPL Advisory Board Meeting May 20101NSTX Upgrade – R. L. Strykowsky CD-0 Approved February 2009 The NSTX Upgrade Project organization.
Fermilab Presentation Greg Bock, Pepin Carolan, Mike Lindgren, Elaine McCluskey 2014 SC PM Workshop July 2014.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
Joint HiLumi LHC-LARP Meeting – May 11-13, 2015 MQXFA Functional Requirements Ruben Carcagno May 13,
1 LHC-DFBX Fabrication Oversight Plan Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab.
NOAA Aviation Safety Board Meeting May 16, 2006 Lieutenant Commander Debora Barr NOAA Aviation Safety Program.
Delta-DOR WG: Report of the Spring 2010 Meeting Portsmouth, VA, USA May 7 th, 2010 Roberto Maddè ESA/ESOC,
Lesson 1: Examining Professional Project Management Topic 1A: Identify Project Management Processes.
LCG CCRC’08 Status WLCG Management Board November 27 th 2007
Response to TAC8 and Annual Review Recommendations John Haines Head of Target Division April 2, 2014.
BSBPMG404A Apply Quality Management Techniques Apply Quality Management Techniques Project Quality Processes C ertificate IV in Project Management
MQXF Q1/Q3 Conductor Procurement A. K. Ghosh MQXF Conductor Review November 5-6, 2014 CERN.
MICE Coupling Coil Testing at Fermilab All Experimenters Meeting Ruben Carcagno March 19, R. Carcagno - MICE CC Testing at Fermilab3/19/2012.
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
Request for Service (RFS) Process and Metrics Update June 24, 2008.
Joint HiLumi LHC-LARP Meeting – October 26-30, 2015 MQXFA Functional Requirements Ruben Carcagno October 30,
LMQXFA Cold Mass Assembly Antonios Vouris Fermilab February 3, 2016.
1 Community-Based Care Readiness Assessment and Peer Review Overview Department of Children and Families And Florida Mental Health Institute.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
01-05 October 2007 Heppenheim, Germany eb - 1 SMWG Closing Plenary Report Fall 2007 Meeting Erik Barkley 5 October 2007.
MQXF Short model and prototype plans P. Ferracin, G. Ambrosio HL-LHC/LARP International Review of the MQXF Design December 10-12, 2014 CERN.
1 Chapter 8 karvaytMélKMerag nig kareFVIr)aykarN_ nig karbiTKMerag Project Evaluation, Reporting, and Termination.
LAT-PR GLAST LAT ProjectManufacturing Readiness Review, Oct. 12, 2005 LAT Test Stand Manufacturing Readiness Review 1.Introduction Bill Olson.
Department of Water Affairs and Forestry Department of Water Affairs and Forestry Department of Water Affairs and Forestry Department of Water Affairs.
HiLumi-LARP Annual Meeting November 2014 MQXF pre-series and series magnets fabrication plans Ruben Carcagno November 19,
LARP review, Fermilab, 6/10/2013Magnet Project Overview – G. Sabbi 1 HL-LHC IR Quadrupole Magnet Project Overview GianLuca Sabbi Internal Review of proposed.
LCLS-II Prototype Cryomodule Vacuum Vessel and HGRP Tom Peterson 4 December 2014 Design Review.
Eric Prebys, Fermilab Program Director, LARP July 10, 2012.
DOE Review of LARP – Feb 17-18, 2014 DOE Critical Decision Process Ruben Carcagno February 17,
Engineering Documentation
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
LARP Review, June 10, 2013Magnet Cost and Schedule – M. Kaducak 1 IR Quadrupole Cost and Schedule Marc Kaducak LARP Review June 10, 2013.
LARP CM15, SLAC, 11/3/2010GianLuca SabbiSummary of MS Parallel Sessions Summary of Magnet Systems Parallel Sessions GianLuca Sabbi LARP Collaboration Meeting.
Logo area Cold Mass Design, Assembly Plans & QC by US HL-LHC-AUP Antonios Vouris MQXF International Review – CERN, June 7 th – 10 th, 2016.
Rob Connatser NSS Instrument Work Packages and XLPM.
DOE Review, 6/2/2011Answers to Committee Questions – Magnet Systems Answers to committee questions - magnets.
Roadmap for triplet cryostats
Project Management W. J. Foyt
MQXF Planning Paolo Fessia, Frederic Savary, Ezio Todesco, Lucio Rossi - CERN Mike Anerella, Peter Wanderer - BNL Giorgio Ambrosio, Mark Kaducak - FNAL.
International Review of the Conceptual Design of the Cold Powering system for the HL-LHC Superconducting Magnets J.Ph. Tock
MQXF updates P. Ferracin October 9th, 2014.
MODULE B - PROCESS SUBMODULES B1. Organizational Structure
Presentation transcript:

MQXF Workshop on Structure, Alignment, and Electrical QA – Feb 2-4, 2016 Requirements and feedback form LARP structure review Ruben Carcagno February 2,

MQXF Workshop on Structure, Alignment, and Electrical QA – Feb 2-4, 2016 Requirements - Introduction It will take ~9 months and ~$7M (U.S. Project accounting) to fabricate and test each MQXFA magnet (x20) It will take an additional ~6 months and ~$1.5M to assemble and test two MQXFAs into an LMQXFA/B Cold Mass Assembly (x10) For such fabrication project scale, it is essential that requirements, verification procedures, and acceptance criteria are clearly defined, documented, and approved. This is also mandatory by our funding agency, DOE. – Requirements documents must be ready prior to CD-1 Typical CD-1 DOE review charge question is: “Does the conceptual design satisfy the performance requirements”? CD-1 director’s review anticipated before the end of

MQXF Workshop on Structure, Alignment, and Electrical QA – Feb 2-4, 2016 Requirements Classified into two groups: – Threshold Requirements (T): project must meet Usually related to “nominal” parameters, but not always (e.g., we must train to ultimate current, which is 108% of nominal current) – Objective Requirements (O): project should meet and will strive to achieve Usually related to “target” or “ultimate” parameters (e.g., magnetic field harmonics table or ultimate gradient) Requirements verification procedures and acceptance criteria will be defined in a separate document (not started yet) – At CERN’s discretion, deliverables that fall short of the threshold requirements may still be acceptable Example: a magnet deliverable trained to 107% of nominal current instead of 108% (the threshold requirement) – Acceptance procedure of objective requirements need to be clearly agreed upon Acceptance related to objective requirements is less straightforward than threshold requirements Example: a magnet that does not meet the magnetic field harmonics target 3

MQXF Workshop on Structure, Alignment, and Electrical QA – Feb 2-4, 2016 MQXFA Requirements Status (Magnet) A draft MQXFA requirement specification (US- HiLumi-doc-36) has already gone through several iterations with CERN – First draft May 2015, latest draft Oct. 13, 2015: – bin/ShowDocument?docid=36 bin/ShowDocument?docid=36 22 Threshold requirements and 10 objective requirements were identified 4

MQXF Workshop on Structure, Alignment, and Electrical QA – Feb 2-4, 2016 MQXFA Requirements Table 5 Items in red are less certain and need more discussion Threshold Requirements Objective Requirements

MQXF Workshop on Structure, Alignment, and Electrical QA – Feb 2-4, 2016 MQXFA Requirements Status The main MQXFA requirements parameters that need further discussion and agreement are: – Maximum operating voltage and hipot requirements – Alignment requirements (mechanical/magnetic twist and straightness) – Splice Resistance (target is now 2 nΩ, may be reduced to 1 nΩ pending measurements on MQXFA prototypes) – Magnetic field harmonics target table is expected to evolve as more experience with MQXFA prototypes is gained Interface documents are to be done 6

MQXF Workshop on Structure, Alignment, and Electrical QA – Feb 2-4, 2016 MQXFA Requirements Status Formal CERN “Launch Safety Agreement” to be done – Main MQXFA safety requirements is expected to be a list of all materials with composition and mass details for activation estimates From October 2015 meeting at CERN – MQXFA preliminary list provided to HL-LHC Safety Officer on January Need to make sure is OK before proceeding with procurements 7

MQXF Workshop on Structure, Alignment, and Electrical QA – Feb 2-4, 2016 LMQXFA/B Requirements Status (Cold Mass Assembly) The first draft LMQXFA/B requirement specification (US-HiLumi-doc-34) was presented at CERN on Oct. 28, – bin/ShowDocument?docid=64 bin/ShowDocument?docid=64 27 Threshold requirements and 4 objective requirements were identified Many items are undefined, this workshop will help 8

MQXF Workshop on Structure, Alignment, and Electrical QA – Feb 2-4, 2016 LMQXFA/B Requirements Table 9 Items in red are less certain and need more discussion Threshold Requirements Objective Requirements

MQXF Workshop on Structure, Alignment, and Electrical QA – Feb 2-4, 2016 LMQXFA/B Requirements Status The main MQXFA requirements parameters that need further discussion and agreement are: – MQXFA relative alignment target (offset, roll, pitch and yaw) and alignment stability (e.g., risk of alignment changes during shipping and cryostat insertion) – Triplet superconducting bus bar routing (internal, external) and instrumentation wiring routing (pass-through or not) – Hipot requirements – Splice Resistance (target is now 2 nΩ, may be reduced to 1 nΩ pending measurements on MQXFA prototypes) – Parts supplied by CERN (e.g., heat exchangers tubes, beam tubes, instrumentation and instrumentation wires) Interface documents are to be done – End dome piping/flanges details – Wiring terminations details – Cryostat interface details – etc 10

MQXF Workshop on Structure, Alignment, and Electrical QA – Feb 2-4, 2016 LMQXFA/B Requirements Status Formal CERN “Launch Safety Agreement” to be done – Main issue is conformance to CERN pressure vessel safety – Discussions with CERN HL-LHC Project Office started in October 2015 – Potential project cost and schedule driver How much deviation from standard U.S. Laboratories pressure vessel safety conformance certification process? 11

MQXF Workshop on Structure, Alignment, and Electrical QA – Feb 2-4, 2016 Conclusions - Requirements MQXFA magnet and LMQXFA/B cold mass assembly requirements are converging, and this workshop is an important step – MQXFA requirements more mature than LMQXFA/B cold mass assembly Requirements document needed to answer expected DOE CD-1 review charge question “does conceptual design satisfy performance requirements?” – Performance requirements must be clearly identified in stand-alone document – CD-1 director’s review anticipated before the end of 2016, DOE CD-1 review to follow a few months after Need to start thinking and documenting requirements verification procedures and acceptance criteria – These will be needed for DOE CD-2/3 reviews – Acceptance criteria of objective requirements will be more challenging 12

MQXF Workshop on Structure, Alignment, and Electrical QA – Feb 2-4, 2016 LARP MQXF Structure Design and Requirements Review Held July 16-17, 2015 at LBNL Reviewers: Ruben Carcagno (FNAL, Chair), Michael Anerella (BNL), Schlomo Caspi (LBNL/CERN), Tom Nicol (FNAL), Fred Nobrega (FNAL) Observer: Juan Carlos Perez (CERN) 13

MQXF Workshop on Structure, Alignment, and Electrical QA – Feb 2-4, 2016 Charge 1.Are the Functional Requirements and Technical Specifications for the MQXFA Mechanical Structure properly developed, reasonably finalized and documented? 2.Is there any basic flaw in the Requirements to prevent an expedited transition to the design and procurement phase of the MQXFA Mechanical Structure? Is all tooling properly considered? Are plans for Value Engineering properly taken into account? 3.Is the experience gathered in the 10-year long LARP program and, especially, in the preparation and assembly of the mechanical structure and complete magnet assembly for the latest MQXFS (Short QXF model) properly incorporated in the Functional Requirements and Specifications? 4.Is there enough knowledge to validate, at this time, the basic cost estimate and schedule for the procurement by LARP of one or two MQXFA Mechanical Structure(s)? 14

MQXF Workshop on Structure, Alignment, and Electrical QA – Feb 2-4, 2016 Recommendations Review Report: US-HiLumi-doc-63 – bin/ShowDocument?docid=63 bin/ShowDocument?docid=63 29 recommendations (13 for 1 st structure prototype, 16 for 2 nd and 3 rd prototypes) Response to recommendations: US-HiLumi-doc-69 – bin/ShowDocument?docid=69 bin/ShowDocument?docid=69 Initial November 9, Updated January 21, Recommendations tracking table: US-HiLumi-doc-70 – bin/ShowDocument?docid=70 bin/ShowDocument?docid=70 15

MQXF Workshop on Structure, Alignment, and Electrical QA – Feb 2-4, 2016 Charge #1 Recomendations 1.Are the Functional Requirements and Technical Specifications for the MQXFA Mechanical Structure properly developed, reasonably finalized and documented? – Yes for the first prototype, but no for the second and third – LARP and CERN should finalize requirements and specifications on time to provide input for the 2 nd prototype design and fabrication Status: MQXFA Functional Requirements Specification draft, this workshop, etc. – Establish and verify allowable stresses for critical materials and justify choices (e.g., the yoke) Status: in progress, a table snapshot was delivered 16

MQXF Workshop on Structure, Alignment, and Electrical QA – Feb 2-4, 2016 Charge #2 Recommendations 2.Is there any basic flaw in the Requirements to prevent an expedited transition to the design and procurement phase of the MQXFA Mechanical Structure? Is all tooling properly considered? Are plans for Value Engineering properly taken into account – No “show stoppers” for the first long structure, concern that tooling design is less advanced and still at conceptual stage for several items, likely underestimation of effort. Value Engineering plans OK at this stage. – Proceed without delay to the final design and procurement of the 1 st MQXFA mechanical structure High level of schedule risk Status: proceeding. A snapshot of a procurement tracking “Smartsheet” was delivered – For 1 st prototype, focus on quench and magnetic performance issues; defer alignment and cryostat interface issues to the 2 nd prototype and value engineering to the 3 rd prototype Status: agreed and closed – Evaluate adopting more advanced CERN tooling design, provide metrics to estimate effort (e.g., number of drawings) Status: agreed and in progress, drawing tracking documents provided 17

MQXF Workshop on Structure, Alignment, and Electrical QA – Feb 2-4, 2016 Charge #3 Recommendations 3.Is the experience gathered in the 10-year long LARP program and, especially, in the preparation and assembly of the mechanical structure and complete magnet assembly for the latest MQXFS (Short QXF model) properly incorporated in the Functional Requirements and Specifications? – Good review of extensive LARP history and lessons learned, but overview table of lessons learned was lacking – Prepare a consolidated table of lessons learned and corresponding solutions Status: a revised table of lessons learned with improved clarity was delivered – Identify open issues from lessons learned that need to be resolved Status: included in the table, resolved by date needed. 18

MQXF Workshop on Structure, Alignment, and Electrical QA – Feb 2-4, 2016 Charge #4 Recommendations Is there enough knowledge to validate, at this time, the basic cost estimate and schedule for the procurement by LARP of one or two MQXFA Mechanical Structure(s)? – Sound structure M&S cost estimate, but structure labor and tooling M&S and labor were not presented. Concern for a high level of schedule risk. – Include labor cost in the structure and tooling cost estimate Status: a resource-loaded MQXFA structure schedule was delivered – For tooling, develop and M&S cost estimate using a process similar to the one used for the structure Status: in progress, preliminary total estimate provided – Consider using FNAL and BNL vendors to increase the bid pool Status: agreed and closed – Consider reducing scope by adopting more advanced CERN tooling design and transferring scope to BNL for magnet shipping and handling tooling Status: agreed and closed – Develop a resource-loaded schedule and use it to identify the need of additional staff Status: a link to the MQXFA structure LBNL resource-loaded schedule was provided 19

MQXF Workshop on Structure, Alignment, and Electrical QA – Feb 2-4, 2016 Additional Recommendations 2 nd and 3 rd prototype 16 technical recommendations that must be addressed before procurement of 2 nd and 3 rd prototype structures – Response details in tracking table Status: many responses state “under consideration” or “under evaluation” Need to provide response completion date consistent with schedule needs 20

MQXF Workshop on Structure, Alignment, and Electrical QA – Feb 2-4, 2016 Conclusions – Structure Review A LARP structure review was held at LBNL July 16-17, 2015 – Recommended to proceed without delay with procuring the 1 st long MQXFA structure prototype Focus on quench and magnetic performance issues – Recommended several items before proceeding with procuring the 2 nd and 3 rd long MQXFA structure prototypes Focus on alignment and cryostat interface issues for the 2 nd prototype (this workshop), and value engineering for the 3 rd prototype – Review report, response reports, and a recommendations tracking table is available at the US-Hilumi docdb site. 21