Test Beam Meeting Monday, January 31, 2000 Fpix1 Calibration Status 1.What we have 2.What to do Monitor Software to use now 1.Current Version 2.Calibration.

Slides:



Advertisements
Similar presentations
D. Elia, INFN BariALICE Offline Week - June Recent results from SPD beam test D. Elia, R. Santoro INFN Bari ALICE Collaboration - SPD Group.
Advertisements

MEG Experiments Stimulation and Recording Setup Educational Seminar Institute for Biomagnetism and Biosignalanalysis February 8th, 2005.
Using the EUDET pixel telescope for resolution studies on silicon strip sensors with fine pitch Thomas Bergauer for the SiLC R&D collaboration 21. May.
1 Scintillating Fibre Cosmic Ray Test Results Malcolm Ellis Imperial College London Monday 29 th March 2004.
Offline Code for Next Beam Test Jianchun Wang 08/06/01.
Readout of TPC with modified ALICE electronics details of current version and pending items ALICE overview New software based on homemade partly existing.
02/14/00Jianchun (JC) Wang1 Outline The idea behind the code Code structure and its usage Test on a magnet run Plan Jianchun Wang 02/14/00.
Status of Oxford Setup Matthew Chalk, Erik Devetak, Johan Fopma, Brian Hawes, Ben Jeffery, Nikhil Kundu, Andrei Nomerotski University of Oxford ( 18 August.
1 Analysis code for KEK Test-Beam M. Ellis Daresbury Tracker Meeting 30 th August 2005.
Pixel Testbeam at Fermilab Jianchun Wang Syracuse University.
Slide 1 sCVD Diamond for the CMS Pixel Detector May 2004 R.Stone, Rutgers J.Doroshenko, L.Perera, S.Schnetzer RD42 Collaboration Meeting Overview.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting July 18, 2007.
Jianchun (JC) Wang, 08/21/99 RICH Electronics and DAQ Chip Carrier Short Cable Transition Board Long Cable Data Board Crate J.C.Wang Syracuse University.
Jianchun Wang Marina Artuso Syracuse University 11/06/00 MC Simulation of Silicon Pixel Detector.
JC and Marina 04/02/01 Pixel Cross Talk Study  Modeling: Linear coupling between neighbor rows  Parameters in the simulation:  FPIX0-Pstop gain curve.
Effective Depletion Depth JC & Marina. 04/30/01Jianchun (JC) Wang2 Depletion Depth Methods FPIX0 pstop at 30° X inc Depth: d  XiXi.
J. Estrada - Fermilab1 AFEII in the test cryostat at DAB J. Estrada, C. Garcia, B. Hoeneisen, P. Rubinov First VLPC spectrum with the TriP chip Z measurement.
FPIX0 Electronic Test Marina Artuso Paul Gelling Jianchun Wang  The system works fine with charge injection calibration  Gain curve, threshold, and noise.
Responsibility on Next Beam Test Jianchun Wang Syracuse University BTeV meeting 06/27/01.
Jianchun Wang Syracuse University 10/16/99 CLEO Meeting Outline DAQ problems solved Recent results Status of DAQ Work to be done.
Update on the RICH Beamtest The RICH Group M. Artuso, S. Blusk, C. Boulahouache, J. Butt, O. Dorjkhaidav, A. Kanan, N. Menaa, R. Mountain, H. Muramatsu,
New Features of APV-SRS-LabVIEW Data Acquisition Program Eraldo Oliveri on behalf of Riccardo de Asmundis INFN Napoli [Certified LabVIEW Developer] NYC,
06/15/2009CALICE TB review RPC DHCAL 1m 3 test software: daq, event building, event display, analysis and simulation Lei Xia.
MuTr HV Optimization RIKEN/RBRC Itaru Nakagawa 1.
1 S. E. Tzamarias Hellenic Open University N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch Readout Electronics DAQ & Calibration.
1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006.
Status of TPC experiment ---- Online & Offline M. Niiyama H. Fujimura D.S. Ahn W.C. Chang.
STAR Analysis Meeting, BNL, Dec 2004 Alexandre A. P. Suaide University of Sao Paulo Slide 1 BEMC software and calibration L3 display 200 GeV February.
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
Prediction W. Buchmueller (DESY) arXiv:hep-ph/ (1999)
“End station A setup” data analysis Josef Uher. Outline Introduction to setup and analysis Quartz bar start counter MA and MCP PMT in the prototype.
Preliminary results with the Alibava Telescope G. Casse, S. Martì, J. Rodriguez, I. Tsurin and the Alibava collaboration 1 G. Casse,20th RD50 Workshop,
Combined HEC/EMEC testbeam data can be read and analyzed within the ATLAS Athena framework A “cookbook” gives an introduction for how to access the data.
1 Behaviour of the Silicon Strip Detector modules for the Alice experiment: simulation and test with minimum ionizing particles Federica Benedosso Utrecht,
LHCb VErtex LOcator & Displaced Vertex Trigger
Pixel Offline Study Jianchun Wang Syracuse University 11/05/04, Pixel testbeam meeting.
Taikan Suehara, SiECAL meeting in Tokyo, 10 Sep page 1 Status of DAQ development for ILD-SiECAL in Kyushu (and more) Taikan Suehara (Kyushu University,
HBD electronics status All the ADC and XMIT boards are installed. –Top 3 crates are for the ADC, XMIT boards –Bottom crate is for test pulse boards/future.
Offline and Monitoring Software for the EMEC+HEC Combined Run Combined Test Beam and LArg Software and Performance 11 September 2002 Rob McPherson University.
G. BrunoOffline week - February Comparison between test- beam data and the SPD simulations in Aliroot G. Bruno, R. Santoro Outline:  strategy of.
1 A first look at the KEK tracker data with G4MICE Malcolm Ellis 2 nd December 2005.
12 October 2001, M. LefebvreHEC-Athena Tutorial: HEC beam test primer1 HEC Beam Test Primer Production modules of the HEC have been tested in particle.
Forward Pixel Beamtest Analysis Carsten Rott Purdue University Januar 24, 2001.
Test of Single Crystal Diamond Pixel Detector at Fermilab MTEST Simon Kwan Fermilab April 28, 2010.
1 LHCb CALO commissioning meeting Anatoli Konoplyannikov /ITEP/ XCAL commissioning with LED Outline Scan data collected on HCAL and ECAL during.
Forward Carriage Commissioning CLAS Collaboration Meeting 6/19/2015CLAS12 CalCom Status Update1 ECAL PCAL FTOF Panel 1A FTOF Panel 1B Detector Status PMT.
Combined HEC/EMEC testbeam data can be read and analyzed within the ATLAS Athena framework A “cookbook” gives an introduction for how to access the data.
ScECAL Beam FNAL Short summary & Introduction to analysis S. Uozumi Nov ScECAL meeting.
PMT Calibration R.Sawada 7/Jan/2007. Time calibration Method was talked at the previous meeting. The problems which was shown before were because I used.
1 Oct 2009Paul Dauncey1 Status of 2D efficiency study Paul Dauncey.
Notes in preparation by the Torino group Sara BolognesiDT Cosmic Meeting 01/11/2007  MTCC note:  calibration section  DQM section  Internal note about.
1 Tracker Software Status M. Ellis MICE Collaboration Meeting 27 th June 2005.
Overview of PHENIX Muon Tracker Data Analysis PHENIX Muon Tracker Muon Tracker Software Muon Tracker Database Muon Event Display Performance Muon Reconstruction.
HCAL1 Status 2004 Oleg Gavrishchuk, JINR, Dubna 1. HCAL1 performance in 2004 General design High Voltage system LED monitoring 2. Stability in 2003 Led.
Ssd simulation status : preparation for embedding Jonathan Bouchet Svt Meeting : 09/19.
BTeV Beam Test Results Jianchun Wang Syracuse University Representing J.A. Appel, J.N. Butler, G. Cardoso, H. Cheung, G. Chiodini, D.C. Christian, E.E.
CMOS Pixels Sensor Simulation Preliminary Results and Plans M. Battaglia UC Berkeley and LBNL Thanks to A. Raspereza, D. Contarato, F. Gaede, A. Besson,
The CDF Upgrade - Incandela -CERN - January 26, 2001 slide 1 96 wire planes –(8 superlayers) –50% are 3 o stereo –Uniform drift (0.88 cm cell) –30,240.
1 HcalAlCaRecoProducers : Producer for HO calibration Outer hadron calorimeter is expected to improve jet energy resolution Due to different sampling/passive.
AHCAL Electronics. Status Commissioning Mathias Reinecke for the AHCAL developers EUDET electronics and DAQ meeting Paris Palaiseau, Jan. 14th, 2010.
Pixel Offline Status Jianchun Wang Syracuse University 10/28/04, Pixel testbeam meeting.
Rainer Stamen, Norman Gee
Analysis of LumiCal data from the 2010 testbeam
Analysis Test Beam Pixel TPC
X5 quasi offline Analysis
BTeV Pixel Silicon Detector
Test Beam Measurements october – november, 2016
The Ohio State University USCMS EMU Meeting, FNAL, Oct. 29, 2004
Presentation transcript:

Test Beam Meeting Monday, January 31, 2000 Fpix1 Calibration Status 1.What we have 2.What to do Monitor Software to use now 1.Current Version 2.Calibration Fpix0 Fpix1 SSD Pedestal Magnet 3.Track Finding Position Algorithm for Pixels 4.Electronic Run Log Book

FPIX1 Calibration Status What we have 1.Pulse scan from 0.05V to 0.48V by step of 0.001V Fpix1-pstop (board 4)(Vth=2.2V and Vth=1.95) Fpix1-pspray (board 1)(Vth=2.25V) 128 patterns The two board Tested in parallel 100Hz pulse rate: 24 hours 2.Xray sources: Tb(Kalpha=44.23keV=12286elect) Ag(Kalpha=22.10keV=6138elect) Mo(Kalpha=17.44keV=4844elect) Trigger rate 100Hz Vth0 scan from 1.8 to 2.2V (2.22V) by step of 0.01V events each 3.The data are now in ntuple format Event number Iadc,icol,irow,idchip Amplitude(Pulse amplitude or Vth0) 4.From the ntuple the two groups of data collected make sense but the program to fit each cells for each adc as a function of the amplitude is still not ready

FPIX1 Calibration Status What to do 1.Still some test to do as suggested by Simon: Cross Talk as a function of the position of the cells To try to read out more than three cells in the same column and rows>85 for Fpix1 To measure the pspray Front End noise as a function of the bias 2.To do more Xray source measurements for Fpix1-pspray 3.(If possible) Before to move every think from Mtest analyze the data to see if they are enough to calibrate the fpix1

Tb-Xray Source Fpix1-pstop(board 4)

Monitor Software to use now Current version Must be good for every runs and the different Setups are handled by changing: tb_monitor.dat Manual geometry files x, y offset for all planes used must be adjusted z offset set to nominal value alpha, beta, phi angles SSD planes set to 0 alpha, beta angles PSD planes set to 0 beta angle PSD plane under test set to nominal value phi angle PSD planes must be adjusted planes to drop some time: plane 4 (x SSD plane upstream box) planes 10,11 (fpix1) planes to drop always: planes 9 (fpix1) Manual geometry files in B in magnetic field alpha, beta, phi angle plane 7 must be adjusted, the pitch and the active area must be swap in x and y In magnetic field alpha7 must be changed for each current

Monitor Software to use now Calibration 1.Fpix0 JC’s files, two line in tb_monitor.nml: pixel_calib_file(1) = '~wangjc/testbeam/db/pstop_fpix0_v2.dat' pixel_calib_file(2) = '~wangjc/testbeam/db/pspray_fpix0_v2.dat' JC’s subroutine to copy in running area: ~wangjc/testbeam/src/pix_pstop_convert.F ~wangjc/testbeam/src/pix_pspray_convert.F 2.Fpix1 Single chip thresholds Now(a little change in the subroutine pix_adc_convert.F + two files for the plane 10 and 11). Single cells thresholds with Fortran code 3.SSD planes No SSD pedestal subtraction 4.Magnetic field vs Imagnet (estimated error) Dave’s measurement

Monitor Software to use now Track Finding Position Algorithm for Pixels 1.The TFP monitor software must not be changed 2.Try several TFP algorithm use Fortran code: for example the Rita’s Fortran code (also it handles more than one Hbook files)

Monitor Software to use now Electronic Run Log Book 1.It is easy to display with the Run Log Book shell the files stored in Datad1,Datad2…,Datad9. 2.Io Wrote an to Dario Manasce to understand how to run a kumac by this shell. 3.The list of Basic Sample of Runs in place with the Jeff’s suggested corrections but other ones still to do.