R2E Mitigation Project Review November 21 st – 24 th 2011 Intense program (link)link A few facts/highlights per session/task Calculations & Monitoring.

Slides:



Advertisements
Similar presentations
ASYCUDA Overview … a summary of the objectives of ASYCUDA implementation projects and features of the software for the Customs computer system.
Advertisements

Copyright © 1997 CompassPoint Nonprofit Services What Does a Strategic Plan Look Like & How Do You Keep It Relevant? Anushka Fernandopulle CompassPoint.
Systems Analysis and Design in a Changing World
Chapter 8: Evaluating Alternatives for Requirements, Environment, and Implementation.
Will we still see SEEs? (a word trick game) R2E Project Meeting - draft presentation for Chamonix 2012 – 19 th January 2012 M. Calviani (EN/STI) for the.
K. Potter RADWG & RADMON Workshop 1 Dec WELCOME TO THE 4th RADWG & RADMON WORKSHOP 1 December 2004.
Technology Solutions, LLC MU April Thompson – Project Manager Neera Desai – Operations Advisor Charles Lively – Technical Advisor.
NGAO Construction Project Cost Estimation: Initial Thoughts Richard Dekany NGAO Team Meeting #12 December 13, 2007.
Operational risk management Margaret Guerquin, FSA, FCIA Canadian Institute of Actuaries 2006 General Meeting Chicago Confidential © 2006 Swiss Re All.
1. Introduction 1.1. Fire program management involves the identification, evaluation, and control of hazards which may result in a fire OSHA & Emergency.
IS 425 Enterprise Information I LECTURE 9 Autumn  2004 Norma Sutcliffe.
8 Systems Analysis and Design in a Changing World, Fifth Edition.
J. MEKKI (1/14) 05/12/12 – RadWG meeting Summary of the radiation levels of the equipments at CNRAD RF MosFETs Cryogenics TE/EPC LED warning system BPM.
An Introduction to AlarmInsight
RBTC: Business Continuity 101 July 18, What is Business Continuity? Scenario Part 1 Why is BC important? What types of plans are needed? How do.
Client Logo LEAN ENTERPRISE Implementation Workshop.
Engaging with stakeholders: Adding value to the energy system 32nd Annual Conference of the International Association for Impact Assessment Porto Pedro.
RADWG 2 ND TH MARCH 2012 G. Spiezia (EN/STI/ECE)
M. Reimeris, The Ministry of Finance of Lithuania (Managing Authority)
Copyright 2010, The World Bank Group. All Rights Reserved. Budgeting Statistical Projects Section A 1.
Product Documentation Chapter 5. Required Medical Device Documentation  Business proposal  Product specification  Design specification  Software.
Operational Planning preparing to act Conservation Coaches Network New Coach Training.
GOES Users’ Conference IV May 1-3, 2006 Broomfield, CO Prepared by Integrated Work Strategies, LLC 1 GOES USERS’ CONFERENCE IV: Discussion Highlights Algorithm.
Safe-Room Status Intermediate ‘Conclusions’ M. Brugger (based on HSE discussion)
Follow-Ups and Notes. Project News LMC R2E (SEE Events) Update (see link)link RadWG SEE list (link) and Post-Mortem Database (link) synchronizedlink MCWG.
R2E Report M. Brugger for the R2E Study Group RadWG Meeting, August 20 th 2009.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
A&T Radiation Test Procedure RadWG Meeting November 14 th 2013 CERN R2E Project RadWG Meeting November 14 th 2013 Update on Fraunhofer Tests M. Brugger.
Developing a Sustainable Procurement Policy and Strategy EAUC – EAF Programme.
Nov 28, 2013 Power Converters Availability for post-LS1 LHC TE-EPC-CCE.
Gloria Hauck Thiele University of Michigan EDUCAUSE ‘99, October 27, 1999 Y2K: The Beginning of the End of the Final Chapter.
R2E Mitigation Project P5 Relocation Options - Discussion R2E Mitigation Project CMS Relocation Options Towards An R2E Baseline 1 M. Brugger for the R2E.
2015 Pipeline Safety Trust Conference November 20 th, 2015 | New Orleans, LA API RP 1175 Pipeline Leak Detection Program Management – New RP Highlights.
Establishing and Maintaining Effective Safety Committees.
TMALL 0141 Presentation v 1.0 Asset Management Bo Olsson Bucharest October 7th, 2015.
Action – developing gender-responsive action
WorldFIP Infrastructure E.Gousou | BE-CO |15 Oct 2014 | R2E | Maintenance | Availability.
LMC Update - R2E Failures December 5 th 2012 (R2E) Mitigation Project: LMC Update December 5 th 2012 R2E SEE Update M. Brugger on behalf.
R2E Availability October 15 th 2014 Experience from Past LHC and Injector Operation and scaling to the future G. Spiezia.
Human Factors and Signals Passed at Danger Dr Huw Gibson Dr Ann Mills RSSB.
Report from the MCWG, 4 th R2E Committee Meeting M. Calviani for the MCWG (link), EN/STIlink.
R2E Mitigation Project Status Report 2 nd R2E Committee Meeting R2E Project Report.
PS-EA Update RadWG August 23 rd 2012 Radiation 2 Electronics (R2E) LHC Activities RadWG August 23 rd 2012 PS East Area Update M. Brugger on behalf of the.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
Training on Safe Hospitals in Disasters Module 3: Action Planning for “Safe Hospitals”
Equipment Life Optimization Program (ELOP) Doug Hilleman February 10, 2011.
R2E Workshop Preparations RadWG Meeting March 25 th.
LSU v09/08/05SBC Overview1 Introduction to the LA ACES Student Ballooning Course A summary of the motivation, contents and status of the materials available.
Follow-Ups and Project Structure R2E Meeting September 8th Project / Study Group / RadWG R2E Mitigation Project:  Responsible of development and implementation.
R2E/Availability Workshop Report - RadWG October 22 nd 2014 R2E/Availability Workshop 2014 October th 2014 R2E/Availability Workshop RadWG - Brief.
Planning and strategy for HL-LHC R2E
(3.6) General requirements on resources for the establishment of IMS
Systems Analysis and Design in a Changing World, Fifth Edition
Risk Assessment Meeting
Overview of Project Planning
What is an SLA Service Level Agreements (SLAs) used to negotiate the services offered and the associated budgets 1st :simple metrics 2nd:metrics important.
M. Reimeris, The Ministry of Finance of Lithuania (Managing Authority)
News from R2E – Safe Room Proposal of local fire-resistant racks agreed upon Performed visit (HSE, EN-EL, R2E) to clarify details Solution already integrated.
R2E – Experience and Outlook for LS1
Systems Analysis – ITEC 3155 Evaluating Alternatives for Requirements, Environment, and Implementation.
X X X QURA PLC X RM01_R X RM01_L Long-Term?: QURC(A,B) QUI (-1)
East Hall under construction
Collimator Control (SEUs & R2E Outlook)
Preliminary Analysis and foreseen actions EN-ICE&EN-STI
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
NSS integrated installation plan workshop Introduction
R2E Follow-Ups and Project
East Hall under construction
Business Planning Budgeting
Radiation Working Group RADWG
Presentation transcript:

R2E Mitigation Project Review November 21 st – 24 th 2011 Intense program (link)link A few facts/highlights per session/task Calculations & Monitoring Reliable predictions Radiation Testing & Failures Failure analysis and radiation tests essential Power-Converters & SCL R&Ds started and complementary solutions Integration & Implementation Shielding and relocation ready for xMas and LS1 Strategy & Resources Tight margins, heavy workload R2E Review Summary 1 FAILURE ANALYSIS & EXPECTATIONS

R2E Mitigation Project Review November 21 st – 24 th 2011 R2E Review Summary 2 Review summary and recommendations (link)link Next Priorities Calculations & Monitoring RadMon 2 nd generation (for beyond LS1) Radiation Testing, Failures and Facilities Implementation study of PS-East Area Facility Power-Converters & SCL Auxiliary power-supply, FGCs and SCL integration Integration & Implementation Safe-Rooms decision + Point-7 Study Strategy & Resources Procurement and preparations to be launched new sensors & memory, higher dynamic range

R2E Mitigation Project Review November 21 st – 24 th 2011 R2E Mitigation Project Review November 21 st – 24 th The Time-Line Time >…2014 CNGS Incident R2E Study Group Short-Term Actions (Safety + Easy) R2E Detailed Analysis & New Structure Medium Term Actions (Add. Shielding + Relocation) Power-Converter Review + R2E Workshop Mitigation Plan & R2E Project Proposal 2 nd Mitigation Actions Risk Anticipated Actions & Patch-Solutions xMasBreak Actions 1 st TaskForce Additional Patches LS1: Shielding Relocation 600A Aux. QPS nanoFIP FGClite?, etc. LS1: Shielding Relocation 600A Aux. QPS nanoFIP FGClite?, etc. Power- Converters and/or SCLs + Tunnel- Equipment Power- Converters and/or SCLs + Tunnel- Equipment Integration Planning Monitoring Rad.Tests Integration Planning Monitoring Rad.Tests R&Ds

R2E Mitigation Project Review November 21 st – 24 th 2011 Additional Points Raised 4 High-Priority on follow-up of failures during 2012 Destructive tests at PSI and mixed-field facilities -> focus on critical components + heavy-ion tests TID effects as 2 nd priority -> to be considered as much as possible in the design (safety factor kept) Regular internal/external design reviews for all new developments (simple format!) Tracing of component purchase and usage Documentation of test results Failure budget -> ‘average time to failure’ External companies can/will help (procedures!) Reinforce testing teams (internal/external)

R2E Mitigation Project Review November 21 st – 24 th 2011 Conclusion 5 Many Thanks A lot of work It needs your help