Systems Alignment Project Fall 2009- Phase 1 Professional Development Practices April 27, 2010.

Slides:



Advertisements
Similar presentations
1 Leading Change through Strategic Planning Ralph J. Jasparro, Ph.D.
Advertisements

Watershed Approaches and Community Based Planning
Iowa Assessment Update School Administrators of Iowa November 2013 Catherine Welch Iowa Testing Programs.
Panorama Consulting Group LLC ERP Assessment, Selection, and Planning SAMPLE APPROACH.
Analysis Concepts and Principles
IACT 901 Module 10 1 Plan Delivery. IACT 901 Module 10 2 Elements of IS & IT Plans Delivered Comprise Overall IS/IT vision Applications development plan.
What is the Curriculum/Program Development Process? What leadership will you offer? How does it work in your organization? Share with your group…..
Instructional Design Dr. Lam TECM 5180.
Office of Information Technology (OIT) PROJECT INITIATION DOCUMENTS - BUSINESS CASE, ALTERNATIVE ANALYSIS AND STATEMENT OF WORK (SOW)
Promising Practices in Coaching OSEP Project Director’s Conference State Deaf Blind Projects Meeting July 24, 2008.
VOLUNTEER MANAGEMENT ASSESSMENT & RECOMMENDATIONS DATE The Leadership Development and Strategic HR Practice Area is presented by American Express. This.
Student Learning Objectives 1 Phase 3 Regional Training April 2013.
OUR FUTURE VISION + STRATEGY. STRATEGY STATEMENT BY 2013, TO BUILD THE SUSTAINABILITY AND AUTHENTICITY OF THE LASALLIAN MISSION IN ANZPNG THROUGH THE.
1 Our Expertise and Commitment – Driving your Success An Introduction to Transformation Offering November 18, 2013 Offices in Boston, New York and Northern.
Science Curriculum Topic Study Bridging the Gap Between Standards and Practice.
Transforming Organizations
Engineering, Operations & Technology | Information TechnologyAPEX | 1 Copyright © 2009 Boeing. All rights reserved. Architecture Concept UG D- DOC UG D-
1 Phases in Software Development Lecture Software Development Lifecycle Let us review the main steps –Problem Definition –Feasibility Study –Analysis.
Strong Schools, Strong Communities Strategic Plan Implementation Process and Roles Saint Paul Public Schools has designed the following process and roles.
Bring Your Business into the 21 st Century : Part 1 WasteExpo 2011 Improving Your Financial Management System.
The Challenge of IT-Business Alignment
Product Assessment By: April Prencipe. FEATURES Report Depot: Centralized report holding Report Depot: Centralized report holding Relational Router: Links.
UNIVERSAL CONTENT MANAGEMENT December 8-22, 2006 University of Minnesota WCM Scoping Agenda.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Sponsor ADKAR® Assessment Prosci
UNNExT Capacity Building Workshop on Single Window Planning and Implementation Module 1 – Introduction to the workshop UNNExT Capacity Building Workshop.
Professional Development PeopleSoft Enterprise Learning Management (ELM) One Stop Shopping.
Introduction To Performance Consulting by Dr. James J. Kirk Professor of HRD Western Carolina University.
[PROJECT] PROJECT KICKOFF PRESENTATION MONTH DAY, YEAR.
TPF Users Group Fall Conference Integrated Workstation Taskforce Requirements Document.
Ohio Department of Education March 2011 Ohio Educator Evaluation Systems.
“Sustaining & Expanding Effective Practices: Lessons Learned from Implementation of School-wide Positive Behavior Supports” Susan Barrett Cyndi Boezio,
The Conceptual Framework: What It Is and How It Works Linda Bradley, James Madison University Monica Minor, NCATE April 2008.
Data, Measurement and Information System Workgroup Meeting #2 April 21, 2009.
Oktalia Juwita, S.Kom., M.MT. SYSTEMS DEVELOPMENT Dasar-dasar Sistem Informasi – IKU1102.
Oregon Common Core State Standards Toolkit Work Session October 20, 2011.
1. Orientation to the Performance Planning, Feedback and Development (PPFD) Process for Confidential Staff
SPC Advisory Committee Training Fall 2015 Institutional Research President’s Office SPC 10/9/20151.
Choice Activity What would it be like to present to the school board and district leadership? 1.The need for an EBISS District Leadership Implementation.
Systems Alignment Project – Fall ’09 Professional Development Practices Kickoff Sept. 22, 2009.
Instructional Leadership: Planning Rigorous Curriculum (What is Rigorous Curriculum?)
A Professional Development Series from the CDC’s Division of Population Health School Health Branch Professional Development 101: The Basics – Part 1.
11 ADM2372 Management Information Systems (MIS) Chapter 10 – Part I Systems Development Chapter 10 – Part I Systems Development.
1 Data Warehouse Assessments What, Why, and How Noah Subrin Technical Lead SRA International April 24, 2010.
Info-Tech Research Group1 Info-Tech Research Group, Inc. Is a global leader in providing IT research and advice. Info-Tech’s products and services combine.
This is a customer facing presentation that you can use to present the your assessment findings, recommendations, options, benefits and requirements. This.
Instructional Leadership for a Professional Learning Culture:
(5.1)Development of IMS to fit the organization (step wise)
5/11/2018.
C. What is a Feasibility report
Use Cases Discuss the what and how of use cases: Basics Benefits
SNOMED CT Education SIG: Strategic Plan Review
Instructional slide to Partner: REMOVE BEFORE PRESENTING TO CUSTOMER
Feedback and Training Capsules
Webinar Optimize Your Business Applications Strategy
THE FEASIBILTY STUDY LECTURE-5.
Description of Revision
Guidance notes for Project Manager
Creating a Business Architecture Practice
Partnership Collections
Special Education Maintenance of Effort
Implementation, Monitoring, and NM DASH
Public Schools of Petoskey’s District TLC
Alma Digital implementation
IE352 System Analysis and Design
Strategic Planning Final Plan Team Meeting
Environment and Development Policy Section
Core Competencies for Primary School Teachers in Crisis Contexts
<Entity name> Profile
Requirements Presentation
Presentation transcript:

Systems Alignment Project Fall Phase 1 Professional Development Practices April 27, 2010

Agenda 8:00 a.m. Welcome! 8:05 a.m. Grounding 8:15 a.m. Share Findings 8:45 a.m. PD Practices Process Map 9:15 a.m. Deliverables Document 10:00 a.m. Cabinet Presentation 10:30 a.m. Project Definition Document for Phase 2 Celebrate!

Welcome! In pairs Best hopes for this work Your dream for PD in TSD

Staying Grounded in Phase 1

Grounding our work April 27- –Finishing touches on Phase 1 work –Bridge Phase 1 and 2 work –Celebrate!

Phase 1 Deliverables 1.Current PD process schematics with gaps identified 2.Analysis of current PD expenditures (days and $) 3.Research on best practices – PD methods and PD investment standards and role models 4.List of organizational core competencies desired by employee group 5.Conceptual design and recommendations for the PD process for the organization 6.Cost / benefit analysis and priorities 7.Work plan for the next phase

PD Methods & Investments Share Findings Poudre Cherry Creek Pearl River Jed Stus- instructional facilitators Other

5. New PD Processes Review process map Do we have new findings to add? What can we fine tune? 8

Deliverables Document Review Deliverables Document –What information, if any, is missing? –Do you have format or delivery suggestions? –Does it summarize our work? Do we need a summary?

Phase 1 Deliverables 1.Current PD process schematics with gaps identified 2.Analysis of current PD expenditures (days and $) 3.Research on best practices – PD methods and PD investment standards and role models 4.List of organizational core competencies desired by employee group 5.Conceptual design and recommendations for the PD process for the organization 6.Cost / benefit analysis and priorities 7.Work plan for the next phase

Cabinet Presentation Review –Does it provide a summary of our work? –Does it provide the essence of our vision? –Do you have any format or other suggestions?

Planning for Phase 2 Work This phase is relevant when a topic is new with little or no definition for the District. The primary purpose is to perform research on the topic to understand what is available and possible This phase is relevant when a problem to be solved is understood and a high-level design needs to be created. Design components may include researching best practices, documenting requirements, designing processes, technical features and/or change management considerations Conceptual Design Phase Preliminary Design Phase Detail Design and Implementation Phase This phase is relevant when a high-level solution to a problem is defined and the details need to be designed, developed and implemented. This includes possible piloting of solutions, training users and moving a new process into ‘operational’ mode Detail Design & Development Phase

Planning for Phase 2 Work Detail Design & Development Phase Review Does it provide direction for Phase 2 work? Does it provide the essence of our vision? Do you have any format or other suggestions?

Celebrate Munchies and Memories

on to Phase 2... Thank you!