CES Studies at CERN for the Interaction Region : -Summary of Linear Collider IR meeting at CERN held on 16 February 2011 -Design Brief for external design.

Slides:



Advertisements
Similar presentations
Global Design Effort Goals and Introduction Andrei Seryi, SLAC, September 17, 2007.
Advertisements

CFS challenges for a linear collider J.Osborne CERN ILC-GDE Dubna - 4 June 2008 OUTLINE : Introduction Civil Engineering -Geology (water, stability issues.
1 Status of infrastructure MICE Video Conference, August 17, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation Department.
Ian Bird WLCG Management Board CERN, 17 th February 2015.
Construction and Installation of the CLIC Experimental Area
19/10/2010 GS-SEM J Osborne N Baddams A Kosmicki EN-CV M Nonis EN-MEF M Gastal PH-CMX A Gaddi H Gerwig A Herve N Siegrist DGS-SC.
BDS Design Studies John Amann ILC Mechanical Engineering 10/24/06.
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
ILC CFS / CLIC CES Studies for the Interaction Region : - An action was given at the Geneva Linear Collider Meeting for CFS to develop a more in-depth.
LCC Linear Collider Collaboratio ILC - CFS 12 November 2013 LCWS13 Tokyo University 1 Site-specific CF design from TDR LCWS13, 12 November 2013 Atsushi.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP GENERAL.
CES Status J.Osborne 6 November 2009 Status Report from Civil Engineering and Services Working Group J.Osborne GS/SEM for CES Working Group.
ARUP Studies Update ILC Interaction Region Design Requirements John Osborne CERN, Yung Loo & Matt Sykes (ARUP) CFS-ADI Joint Meeting - University of Tokyo.
1. Civil Engineering works for Linear Colliders* : -Brief introduction on the overall machine layout (just for CLIC at this stage) -Experimental Area.
Global Design Effort - CFS SiD Collaboration Meeting - SLAC 1 VERTICAL ACCESS ILC IR LAYOUT for SiD and ILD CONVENTIONAL FACILITIES AND SITING.
October 13, 2006 Global Design Effort 1 International Linear Collider Machine Detector Interface Materials for discussion at Engineering Forum: experiences.
LCWS14 - Belgrade October 6-10, 2014 Conventional Facilities & Siting Working Group Summary V Kuchler, M Miyahara, J Osborne.
Interaction Region Studies for a Linear Collider at CERN - Detector ‘push-pull’ slab design - Cavern assessment Matt Sykes.
ILC experimental area - How to ‘develop’ CFS details for TDP (cavern size, number of shafts, HVAC, EL spec etc) ? - KEK site specific issues CFS V.Kuchler.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
Status of MDI+BDS Cost Estimate Lau Gatignon. Summary ItemkCHFComments 4 QD0 magnets1340But replaceable item! IP feedback system610Preliminary Pre-alignment.
LINEAR COLLIDER COLLABORATION Designing the world’s next great particle accelerator Detector Hall Configuration Overview New baseline (Hybrid A’) proposed.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
1 CLIC / ILC Collaboration for CES issues JOHN OSBORNE – CES 8 April 2009.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
10/2010 IWLC2010 Global Design Effort 1 Brief Overview of Interaction Region Conventional Facilities in RDR Times Presenter Tom Lackowski.
Civil Engineering and Services - drawings for CDR - CDR chapter J.Osborne and M.Gastal for CES WG 1.
The ILC IR John Amann ILC Mechanical Engineering 09/12/06.
1 J.Osborne (CERN)
Activities and news Last meeting: 2015 CERN budget allocations as expected, now distributed on accounts Annual report done, and MTP (Medium Term Plan)
CLIC Experimental Area Layout Design Considerations & ARUP Study A. Gaddi, H. Gerwig, M. Herdzina, H. Hervé, N. Siegrist, F. D. Ramos.
FALC Was “Funding agencies for linear collider” Now “funding agencies for large colliders” WHY ??
A. Hervé - 17 Oct CLIC-Workshop CLIC Workshop: 17 Oct. 07 Interaction Region Engineering at ILC Push-Pull Option A. Hervé/CERN.
CLIC Workshop, CERN 1 CLIC/ILC Collaboration Report: Marc Ross (Fermilab); for Nick Walker, Akira Yamamoto Project Managers International Linear.
MDI Meeting 13 th MDI: Latest news on civil engineering and services First draft concept for the ventilation system in the CLIC experimental area 11/06/2010.
John Osborne : GS-SEM Civil Engineering 18 May 2009 CES 9 June News from ILC Japan CFS review 1-3 June 2010 :
Experimental Areas Studies Lessons learnt at CMS M Gastal & CMS Technical Coordination (A Ball, W Zeuner)
A. Hervé - 17 Sept ILC-IRENG IRENG07 Workshop: 17 Sept. 07 Various Possibilities for disposition of Experimental Area A. Hervé/CERN.
ILC D RAFT P ROJECT S CHEDULE K LYCLUSTER 500GeV K Foraz & M Gastal ILC Mechanical & Electrical Review and CFS Baseline Technical Review Many thanks to.
Global Design Effort Working Group C Conventional Facilities Parallel Session IRENG07 V. Kuchler, A. Enomoto, J. Osborne September 19, 2007.
Report from ARUP meeting Andrea Gaddi, CERN Physics Department.
Introdcution to Workpackage/Activity Reflection D. Schulte.
Europe / CERN studies for SB2009 ILC Re-Baseling J.Osborne CERN (CFS & CES) 2009 Linear Collider Workshop of the Americas 28 September - 4 October 2009.
March 22, –  Design Concept & Hall Layout  Access Tunnel  Top heading Tunnel  Displacement of detector hall by push-pull operation.
ILC J.Osborne / A.Kosmicki / B.List – March 22 th 2012 CFS update for Europe.
MDI Meeting 13 th MDI: Latest news on civil engineering and services First draft concept for the ventilation system in the CLIC experimental area 11/06/2010.
Global Design Effort Working Groups A & C Parallel Session Summary IRENG07 A. Herve, T. Markiewicz, T. Sanuki, Y. Sugimoto V. Kuchler, A. Enomoto, J. Osborne.
RD’s Report SiD Group Sakue Yamada December 14, 2011 (remote participation) 2011/12/141SiD-meeting Sakue Yamada.
AWLC14 - FERMILAB May 12-16, 2014 Conventional Facilities & Siting Working Group Summary V Kuchler, A Enomoto, J Osborne.
FCC Underground Infrastructure
Task 9.4 Beam Delivery System CERN, 27-Mar /3/2009
SiD Collaboration Meeting SLAC, December 2011
Detector Hall Design and Cost Information CONVENTIONAL FACILITIES
CLIC Civil Engineering Update
CLIC Civil Engineering Update
LCWS11 AWG9 PARALLEL SESSION SUMMARY
Marco Oriunno (SLAC), March 12, 2014 MDI WG
CLIC / ILC Collaboration for CFS works
Interaction Region Alternative Layouts
Beam Delivery Systems and the Machine-Detector Interface Terms of Reference for the CLIC-ILC Collaboration Working Group B. Parker (BNL), D. Schulte.
ILC Interaction Region and Machine Detector Interface
FCC Civil Engineering update
Status of Cryogenics Facilities Design
Detector Hall Tom Lackowski ILD Workshop 2011 LAL, Paris
CLIC Civil Engineering Update
Tom Lackowski Revised 10/12/2011
CMS Gantry for Detector Lowering
RDR Baseline Layouts for Interaction Region
STEEL PLATES.
FCC Week 2019 Civil Engineering Summary
Presentation transcript:

CES Studies at CERN for the Interaction Region : -Summary of Linear Collider IR meeting at CERN held on 16 February Design Brief for external design specialists -Build-ability issues for concrete platforms underground -Conclusions J.Osborne (CERN) for CES 1

2

3 CLIC CDR Baseline Layouts for Interaction Region

ILC RDR Baseline Layouts for Interaction Region ILC Concrete platform concept / shaft layout / crane capacities still need to be finalised before CE study can start

5 ARUP’s matrix analysis strategy

6 ARUP’s were asked to tender for 4 distinct tasks

7 Air pads v Rollers for concrete platform movement will be further analysed

8

9 2d and 3d models will be developed for CLIC to do a “Time-dependant” state analysis. Possible 2 nd phase use of these models for ILC layouts/geology.

10

Budget for this Linear Collider IR study needs to be finalised : Possible cost sharing FNAL (Task 1) CERN (Task 2) Some key decisions for ILC were resolved at Eugene meeting : Are both detectors using the “concrete” platform strategy : Yes Are the level of the platforms the same ? For the overall layout : – Gantry crane capacity in the experimental hall ? – Should shafts be directly over the cavern or offset ? – Self shielding detectors : Yes 11

12 Steel plates with tangs placed on building floor slab Build-ability Issues for concrete platforms underground to be reviewed

Conclusions If everyone agrees, ARUP’s could proceed with : – Task 1 - funded by FNAL ? (approx. 50KCHF) – Task 2 - funded by CERN (approx. 50KCHF) This study will be of benefit to both ILC and CLIC projects Several ILC detector issues need to be resolved before the study can go to the next level of detail 13 J.Osborne (CERN) for CES