ESAC Meeting December 1, 2011 2 pm LOS REALES LANDFILL UPDATE Entrance Facility Rodeo Wash Erosion Control Structure Scale House Drainage and other Stormwater.

Slides:



Advertisements
Similar presentations
Wastewater and Stormwater Discharge from Landfills Rick Pinneo Illinois EPA.
Advertisements

Greenwich Peninsula.
Cytec Statement of Basis and Permit Modification July 16, 2012 Public Hearing Ohio Environmental Protection Agency.
Vapor Intrusion. What is Vapor Intrusion? The migration of volatile chemical vapors from the subsurface to overlying buildings.
MPCA Citizens’ Board Information Item February 25, 2014.
Office of Science Experience with Surveillance and Maintenance (S&M) of Environmental Remediation David Michlewicz – DOE Office of Science, Office of Safety,
Overview: I.Introduction/Background A.Kevin Allen B.Noel Shenoi II.Core Basics III.Solutions IV.Additional Literature.
Presentation to the Lahontan Regional Water Quality Control Board June 8, 2011 Project Update Groundwater Remediation Project Hinkley Gas Compressor Station.
PROPOSED REGIONAL GROUNDWATER REMEDIAL ACTION ROOSEVELT IRRIGATION DISTRICT June 11, 2010.
EXAMINATION OF MODERN SANITARY LANDFILLS W. Gregory Vogt Chair, Sanitary Landfill Working Group, ISWA Vice President, SCS Engineers.
AHMET UCANOK JOHN E. ELVIS Pump and Treat of Contaminated Groundwater at the United Chrome Superfund Site Corvallis, Oregon.
Environmental Geotechnology Presentation Site OT-16B, Shaw Air Force Base, South Carolina, USA By Oliver Edwards And Alaric Shenton.
A REVIEW OF THE REMEDIATION ALTERNATIVES FOR BENZENE CONTAMINATION AT THE PESTER REFINERY COMPANY SUPERFUND SITE Jonathan M. Diller, P.E., CFM for University.
The Need For A New Conceptual Site Model Peter Strauss December 11, 2013 CPEO’s Moffett-MEW Community Advisory Board Mountain View, California.
Air Force Plant 4 Superfund Site Evaluation of SVE Combined with ERH for the Remediation of TCE Source Material Jeffrey Ragucci SWS 6262 – Soil Contamination.
Colorado River Protection Activities on the Moab UMTRA Project Ken Pill, Hydrogeologist Technical Assistance Contractor CMU Upper Colorado River Basin.
Jasmit Bains and Jamie Laukaitis.  East Midlands - centre of the ‘Industrial revolution’  FACT : PRIDE - P artnership to R egenerate through I nnovative.
Leadership in Environmental Stewardship in a Fiscally Prudent Manner WAUKESHA COUNTY SUSTAINABILITY EFFORTS.
Background Site of a former Industrial Waste Treatment Plant Contaminants accumulated in sludge drying beds and surge pond, they subsequently leaked into.
Contaminated Landfill Area - Norman Landfill in U.S. Yolanda Ho Chung Yin Ryan Wong Cheuk Pong.
Vermont Yankee VSNAP Presentation February 22, 2011 Mike Romeo Director NSA.
Treatment Technologies for Site Cleanup: Annual Status Report (12th Edition) Internet Seminar October 11, 2007 Carlos Pachon
1 Soil Vapor Extraction Limitations and Enhancements LeeAnn Racz AgE 558 Semester Project April 2001.
Green Remediation An Overview of the State of the Practice
Fate and Transport of Chemicals A Presentation by Terrie Boguski Technical Outreach Services for Communities (TOSC) Great Plains/Rocky Mountain Hazardous.
Sand clay Hydraulic Capture clay piezometric surface.
Connecticut Department of Energy and Environmental Protection.
DRAFT Field Sampling Guidance To be used this field season by DEC and consultants Initial focus on soil, groundwater, and vapor intrusion Future versions.
State Coalition for Remediation of Drycleaners (SCRD): National Overview of Cleanup Strategies in the United States William J. Linn, PG Florida Department.
C. Remediation of groundwater contaminants
Vadose-zone Monitoring System
6 th Edition CCCWP Management Committee February 15, 2012.
FSA Groundwater Flow and Solute Transport Model Presentation to Scottsdale Citizens Group March 19, 1999.
Water System Planning Study
1 Case Summary: Electrical Resistance Heating ICN Pharmaceuticals, Inc. Portland, Oregon Jennifer Sutter, Project Manager Oregon DEQ EPA Technology Innovation.
Trade and Environment Dimensions in the Food and Food Processing in IRAN By:Rezvan Rahnavard and Faridoun Alani.
Background and lessons learned Managers Meeting February 13, 2014.
Landfill. ESSENTIAL COMPONENTS 7 essential components are: (a) A liner system at the base and sides of the landfill which prevents migration.
Proposed Amendments to Chapter 32, Article V, Solid Waste Management, and to Chapter 38, Zoning Orange County Code Presented by the Orange County Environmental.
1 GROUNDWATER REMEDIATION OF A HIGHLY CONTAMINATED BEDROCK SITE - The Oxygen Infusion Phase - J. Morrow D. Side By :
Carmichael Town Hall Meeting Western Groundwater Operable Unit - Update 12 March 2008 Alexander MacDonald (RWQCB)
Site Activities Update Park – Euclid RP Group Community Advisory Board Meeting January 16, 2013.
Jan Smolders ( 史默德) Independent Consultant Soil & Groundwater Remediation Jan Smolders, Client Advisor Soil & Groundwater Remediation 1.
Fort Ord, Monterey County, California History and Closure of a Landfill on a former Military Installation and Current Superfund Site Derek S. Lieberman,
Typical Design of a Production or Monitoring Well.
FreshwaterJeopardy $100 $200 $300 $400 $500 $100$100$100 $200 $300 $400 $500 Freshwater Systems and Resources How We Use Water Quantity of Freshwater Freshwater.
History and Cleanup at Chemical Commodities, Inc. Jeff Field US EPA Region 7 1.
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
Former Point Cook Fire Training Area Contamination Remediation Works Project Community Information Session 26 September 2013.
SITE STATUS UPDATE TOP STOP PETROLEUM RELEASE SITE GUNNISION, UTAH Morgan Atkinson – Division of Environmental Response and Remediation, Project Manager.
Aerojet Environmental Update Carmichael Town Hall Meeting March 12, 2008 Michael Girard Aerojet Environmental Site Remediation (916)
New activities Tour de Table – Lithuania Kestutis Kadunas, Geological Survey of Lithuania.
A Tree-Based Remediation System for Treatment and Hydraulic Control of a Hydrocarbon Plume in a 20 Foot Deep Aquifer at a Former Refinery in Central Oklahoma.
Everglades Protection Area Tributary Basins February 28, 2006 Third Annual Public Meeting on Implementation Progress.
7th Avenue and Bethany Home Road Water Quality Assurance Revolving Fund Site February 19, 2013.
Feasibility Study Workplan Park – Euclid RP Group Community Advisory Board Meeting May 23, 2013.
Marian Anderson Place Site Update City Commission Special Workshop December 14, 2015.
PORT OF TACOMA. Request authorization to award Professional Services Agreement (PSA) No with Geomatrix; and PSA No with Hart Crowser for.
Long-Term Management of Contaminated Soil and Groundwater – Iwilei District, Honolulu April 16, 2015.
Green Remediation through Optimization Douglas Sutton, PhD, PE Tetra Tech GEO April 4, 2011.
Water Reclamation Plant Feasibility Study Update July 23, 2014.
Plaistow BOS Meeting 7/24/2017
Presentation on Livermore Lab Site 300 Superfund Cleanup Peter Strauss, Environmental Scientist, PM Strauss & Assoc. Community-Wide Meeting on
Barrier Wall Performance 2009 Data
ASSESSMENT OF CORRECTIVE MEASURES PUBLIC MEETING
Chemical Metals Industries, Inc. (CMI)
Desirable Results Since 1998
Chemical Metals Industries, Inc. (CMI)
Pre-Proposal Conference March 27, 2019, 1:00 p.m.
Board of Public Utilities August 17, 2017
Presentation transcript:

ESAC Meeting December 1, pm LOS REALES LANDFILL UPDATE Entrance Facility Rodeo Wash Erosion Control Structure Scale House Drainage and other Stormwater Issues Groundwater Remediation System Issues Gas Control System and Gas to Energy

GROUNDWATER PCE PLUME

UPPER AND LOWER ZONES

Issues 7 new wells were connected to the system in 2007 to control off-site migration. System was also upgraded. Cost: $450,000 3 new wells were installed in 2009 in an effort to prevent off-site migration from the SWDA. Cost:$160,000. One more well to be connected this year. Cost: $30,000 Seven of the original ten extraction wells have failed and required replacement. Each well costs about $40,000 to replace. PCE is present in the lower zone. R-62B was connected to the system in The water table has declined 1.5 foot per year since 2000 making extraction wells less efficient. The existing treatment system is designed to treat a maximum of 150 gpm. Adding more wells may necessitate a larger treatment system and new injection wells.

LOS REALES LANDFILL TREATMENT TECHNOLOGY EVALUATION Project Goal – Evaluate the existing conditions and remedial action plan and provide a ranked list of remedial strategies to more cost effectively address groundwater contamination. All strategies listed must be consistent with WQARF rules.

SCOPE OF WORK Review site and the existing RAP, summarize and rank feasible remediation strategies, including no further action, soil vapor extraction in the source area, upgrades to the existing pump and treat system within the upper zone only, pump and treat within both the upper and lower zones, et al. Rank each strategy in terms of effectiveness, ease of implementation and general cost and consistency with WQARF rules. Prepare a report with recommendations. SELECTED CONSULTANT: EEC and Montgomery and Associates. Cost: $47,742. To be completed by March 2012

Gas to Energy System