Service Agreements Emmanuel Tsesmelis CERN / TS-LEA RRB Scrutiny Group 31 August 2006.

Slides:



Advertisements
Similar presentations
André Augustinus 16 June 2003 DCS Workshop Safety.
Advertisements

Cryogenics at CERN (LHC)&Helium Inventory Brief review with emphasis given on cryogen management Americas Workshop on Linear Colliders 2014 Fermilab,
ALICE © | RRB | 17 April 2013 | Catherine Decosse 24 th meeting of the ALICE Resources Review Board CERN-RRB
Intervention Priority Management This talk will show the CERN priority list, the corresponding check list and the tools used by operators to diagnose a.
ESS – SPL Collaboration Meeting Infrastructure at ESS Report on WP3 J. Eguia, Fundación TEKNIKER ESS – SPL, Lund, 1st of July 2010.
MERIT Review Meeting: Cryogenics BNL, NY Dec. 12, 2005 Friedrich Haug CERN Cryogenics for Experiments Accelerator Technology Department Presented by Adrian.
Information about system status Piquet backup call Supervision of fire alarm systems Control room backup Computer support for HCI’s/terminals Confirmation.
The art of Engineering
Process Engineer’s Role in Project Management Dr Abdullah Malik.
Michael P. Andrews NuMI Shutdown & Facility Coordinator LBNE Project ESH Manager AD ESH Special Projects Coordinator.
LHC Experimental Areas Forum - 03/07/ ATLAS Helium Cryogenics Nicolas Delruelle on behalf of the AT / ECR group.
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
19/9/2001Plenary RRB October 22, 2001 DS 1 Status Report of the M&O Scrutiny Group  Evolution of M&O Estimates  Scrutiny Group Mandate  Scrutiny Group.
DCS Workshop - L.Jirdén1 ALICE DCS PROJECT ORGANIZATION - a proposal - u Project Goals u Organizational Layout u Technical Layout u Deliverables.
N.Delruelle (CERN)31-May-2007 Cryogenics for ATLAS and CMS Experimets N. Delruelle on behalf of AT-ECR group.
M. Battistin – 8 th April 2009 DC Project 1 M. Battistin 8 th April 2009 Detector Cooling Project - The present M&O Agreement.
The Construction of the LHC Detector Gas Systems ? Ferdi Hahn PH-TA1-GS Detector Steering Meeting 4th of June 2004.
Financial Matters Ferdinand HAHN. Content Short Reminder: Definition of Maintenance and Operation Fund (MOF) in the MoU MOF in 2011 (Budget – Contributions.
Status Report from LHC Safety System Task Force Emmanuel Tsesmelis / TS-LEA on behalf of the Task Force LEAF 11 May 2007.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
Status of renewal of Buildings 115 & 507 Borge & Erwin Siesling.
G. Martellotti1CSN1 14 / 10 / 2002 LHCb Category A M&O status for 2002 and estimate for 2003 Report on Common Fund and CORE expenses for RRB Ott.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
AT/ECR CRYOGENICS Organisation, Procedures and Communication with TCR Presentation for TCR-ECR-ACR Meeting 2003 by K. Barth.
CMS Proposal for a Maintenance & Operation agreement with EN/CV/DC for fluorocarbon detector cooling circuits v.2 P. Tropea For the CMS experiment.
Detector Cooling CERN, September 28, 2006 Jaak Lippmaa HIP, University of Helsinki.
Gas System production for LHC detectors Stefan Haider EP / TA1 - Gas.
5 th May 20061M. Battistin CERN LEAF Committee 2/R-030 8h30 - May 5 th 2006 Michele Battistin (TS/CV/DC) TS M&O agreement for Detector Cooling installations.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Johan Bremer, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Safety aspects.
10 th of April 2003 ATLAS “MSS Specification” Magnet Safety Systems – Magnet Common Project E. Sbrissa, G. Olesen – CERN/EP 5 Tests 5.1 Pre-production.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
Status of ATLAS Resources Presentation to RRB Markus Nordberg ATLAS Resources Coordination CERN-RRB
Michel RAYMOND – July 1 st, 2013 Technical Support Activities in PH-ADO-PO Summary of 2013 activities.
Iouri Ivaniouchenkov RAL Specifying the needs for MICE July 8, RAL MICE Collaboration Meeting 1.
RRB scrutiny Report: Muons. Internal scrutiny group for RRB report Internal scrutiny group composition – J. Shank, G. Mikenberg, F. Taylor, H. Kroha,
MCP Status Magnet Control Project - MCP Common systems: MCS – Magnet Control System – S. Ravat MDS – Magnet Diagnostics System – S. Ravat MSS – Magnet.
EUROnu Costing Workshop May 2011 Beta-Beam Costing Exercise Elena Wildner, CERN 25/05/11 1 EUROnu Costing Workshop, CERN May 2011.
NA62 Organisation of the work - proposal 2/24/20161PD/DT/PO-MH.
Installation of the T600 at Fermilab CSN2, September 22,
17 th November 20061M. Battistin CERN LEAF Committee 2/R-030 8h30 – November 17 th 2006 Michele Battistin (TS/CV/DC) TS/CV Detector Cooling On call and.
13th May 2004Uwe Epting - TS/CSE-CO1 TS-CSE Outline –TCR and TS-CSE-CO mandate –Applications –Console layout –Hardware and Operating System –Strategy –Conclusion.
Interface of FP420 to LHC FP420 meeting 28-Sep-2006.
Status of Contributions, Draft Budget Request for 2005 and Outlook for the Longer Term Future Martyn Davenport 8 TH October 2004 CAST FRC-D
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
TE-CRG Activities D. Delikaris, TE-CRG.
External Data and DIP Oliver Holme 18 th January 2008.
First discussion on MSS for Katrin March 26, 2013 M.Capeans CERN PH-DT.
DT Technical Space Overview December 2012 M.Capeans, A.Catinaccio PH-DT.
Emmanuel Tsesmelis RRB Scrutiny Group Meeting August 2010.
Transport and Handling Manpower Planning S. Prodon – LEAF
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
Operation of cryogenics for LHC detectors: what did we learn? European Cryogenics days U. Wagner, CERN.
LBNF 1 LBNF/DUNE – Construction Summary. LBNF Far Site Facilities Scope and Requirements LNG Membrane cryostat is an European technology. CERN has now.
MMT Retreat Technical Services across ESS Peter Rådahl
Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Industrial contributions to the maintenance of CERN.
Sascha Schmeling & Emmanuel Tsesmelis LHC RRB Scrutiny Group Autumn Meeting August 2009.
Process Layout Chapter #6.
Completion and Pre-Exploitation Costs for the Initial ATLAS Detector
IT-4189 Supply and installation of a cryogenic distribution system
Costing and Project Evaluation
Mauro Morandin & Antoine Daël
CERN with UNICOS M. Pezzetti AT_ECR_CE 27 June 2005.
ILC Experimental Hall Cryogenics An Overview
MERIT Review Meeting Cryogenics BNL, NY Dec. 12, 2005 Friedrich Haug
East Hall under construction
Presentation transcript:

Service Agreements Emmanuel Tsesmelis CERN / TS-LEA RRB Scrutiny Group 31 August 2006

External & Proximity Cryogenics (AT/ECR) ATLAS ( EDMS )  Superconducting magnets (Solenoid, BT, ECTs) and LAr calorimeters  Responsibilities concern the design, construction, installation, testing, commissioning and operation regarding the test facilities (Hall 180, EHN1) and final installations at Point 1.  Installations Hall 180 (He)  BT Cryogenic Test Facility  ECT Cryogenic Test Facility Point 1  Helium  External P1  Proximity Cryogenic System for BT and ECT  Proximity Cryogenic System for Central Solenoid  LAr  External Cryogenics  Proximity Cryogenics  Process Control (He & LAr)

External & Proximity Cryogenics (AT/ECR) CMS (EDMS )  AT/ECR is responsible for the design, procurement, installation, commissioning, operation and maintenance of the external cryogenic system of the CMS Superconducting Solenoid Magnet for both the surface test facility and for the final configuration in the underground experimental area.  M&O External Cryogenics  Cryogenic He refrigeration plant Internal Cryogenics  Valves, instrumentation and piping located in the phase separator Vacuum System

External & Proximity Cryogenics (AT/ECR)  M&O Work Package CERN-wide operation of cryo-plants and infrastructure will be performed by specialised personnel on duty 24/7. Supervision of cryo-plants of ATLAS/CMS will be made from the CCC and Point 1/Point 5 local control rooms. AT/ECR will provide the required technical support and ATLAS/CMS will cover the financial resources associated with the industrial resources.  Maintenance (manpower and consumables) will be carried-out via CERN-AT industrial contracts.  Experts from AT/ECR will supervise the contract & assist when necessary.  All expenses related to M&O will be charged to ATLAS/CMS.  All non-CERN manpower, consumables, spare parts, cryogenic fluids.

External & Proximity Cryogenics (AT/ECR) ATLAS M&O CMS M&O

Cooling & Ventilation and Power Distribution System (TS/EL, TS/CV) General  Estimates for all experiments for have been made.  These forecasts shall be used as basis for fixed price to be used.  Fixed price is based on equipment inventory known by the technical service groups concerned.  Details in EDMS Power Distribution  Fixed price based on existing contracts.  Items not having a unit price (corrective maintenance, AUG tests, piquet) will be charged according to an agreed fixed price shared between LHC experiment and experiments and PS/SPS according to percentage use. Cooling & Ventilation  Fixed price based on existing contracts.  It has been agreed that the LHC experiments will pay 70% of the fixed price corresponding to their share of use.

Gas Systems (PH/DT1) M&O for Experiment Gas Systems  Administrative & technical overhead of teams (~1 FTE/year)  General gas support in the assembly and test areas (05-1 FTE/year)  Calibration of Mass Flow Controller.  Cost sharing ALICE/ATLAS/CMS/LHCb in the ratio 23%/30%/25%/22% YearCost (kCHF) M&O estimates submitted by experiments need to be re-adjusted.

Vacuum System (AT/VAC) ALICE (EDMS ) and ATLAS (ATC- GE-MA-0012)  Manpower resources from AT/VAC Group and includes the dismounting and re-installation during special access periods when some of the beampipes would need to be dismounted to move detector components.  ALICE and ATLAS will cover the cost of material and participate in the manpower costs.

Vacuum System (AT/VAC) Cost (kCHF) Operation-80 Consumables40120 Total40200 ALICE

Vacuum System (AT/VAC) Cost (kCHF) Operation60 Consumables60120 Total ATLAS ATLAS M&O budget need to be slightly re-adjusted

Detector Cooling (TS/CV) M&O of the mechanical, electrical and control components of the detector cooling systems of all LHC experiments (EDMS ). Scope  Cooling units/systems for sub-detectors, including evaporative cooling system for ATLAS and TOTEM.  Includes maintenance (preventive/corrective), stand-by duty, assistance in the operation of the systems, fluid & spare parts Limited to the equipment installed by TS/CV.

Detector Cooling (TS/CV) Fluids and major spare parts not included M&O estimates submitted by experiments need to be re-adjusted.

Magnet Controls (PH/DT1) Work packages for M&O regarding the magnet control systems (MCS) and associated safety systems (MSS) have been agreed. One team of professional technicians will provide an on-call service, preventive & corrective maintenance, modifications and improvements during the operation and testing of the magnets of all LHC experiments.  Result-oriented service contract of typically 6 persons for the 4 experiments. M&O costs to be shared between PH Department (base budget) and by each of the 4 experiments (operations budget). Maintenance of cryogenic systems included in AT/ECR cost estimates.

Magnet Controls (PH/DT1) M&O estimates submitted by ALICE/ATLAS/CMS need to be re-adjusted.

Power Converters (AB/PO) M&O for spectrometer magnet power converters. Scope  Yearly check-up, minor repairs, calibration and start-up verification.  Does not include: Initial spare parts stock, initial shake-down, significant break-downs.

Power Converters (AB/PO) ExperimentTotal [CHF] (Material + Manpower) ATLAS (2 converters) ALICE (2 converters) LHCb9000 CMS9000 Based on informal discussions between AB/PO and the experiments. Need to formalise agreement. ATLAS/CMS M&O budgets need to be slightly re-adjusted

Conclusions Projected M&O costs for technical services have been taken into account by the experiments and, in general, have been correctly budgeted.  Some minor re-adjustments, nevertheless, need to be made to align the experiment budgets to the projections in the Service Agreements. A number of technical services are invoiced on a per-use basis.  e.g. transport & handling, survey, gas consumption