Presentation is loading. Please wait.

Presentation is loading. Please wait.

13th May 2004Uwe Epting - TS/CSE-CO1 TS-CSE Outline –TCR and TS-CSE-CO mandate –Applications –Console layout –Hardware and Operating System –Strategy –Conclusion.

Similar presentations


Presentation on theme: "13th May 2004Uwe Epting - TS/CSE-CO1 TS-CSE Outline –TCR and TS-CSE-CO mandate –Applications –Console layout –Hardware and Operating System –Strategy –Conclusion."— Presentation transcript:

1 13th May 2004Uwe Epting - TS/CSE-CO1 TS-CSE Outline –TCR and TS-CSE-CO mandate –Applications –Console layout –Hardware and Operating System –Strategy –Conclusion TCR and CCC

2 13th May 2004Uwe Epting - TS/CSE-CO2 TCR and TS-CSE-CO mandate TCR –The TCR monitors and operates 24 hours a day, 365 days a year the entire technical infrastructure of CERN comprising : the electrical distribution network and energy consumption management heating, cooling, ventilation and air conditioning equipment safety installations, high vacuum and cryogenic systems any other infrastructure equipment TS-CSE-CO –The TS-CSE-COntrol systems section is responsible for the development and maintenance of the control systems and the computing environment for the Technical Control Room (TCR) …

3 13th May 2004Uwe Epting - TS/CSE-CO3 TCR Applications Yacoma Hummingbird Exceed 8.0 (IT) Internet browser: IE 6 (IT standard) CERN phone book (IT) Windows Netmeeting (remote maintenance) PuTTY + VNC Wizcon and Wizweb (TS/CV applications) MP5 (maintenance DB - DataStream) PVSS (for GTPM and Vacuum) Spectrum (JRE 1.4.2) JavaGUILS Geoconcept 5.0 (SIG cartography) Aesys (for CERN entry panels) LabView (for SPS ventilation) CAS / LASER UMMI / Jviews (for TIM) W2KLinuxITABTSApplication 18/59/6946 Total Pcvue (CSAM and Access Control) Ext. 6 Windows onlyWindows or LinuxLinux possibleService and Maintenance Outlook XP (for TCR and personal e-mail)

4 13th May 2004Uwe Epting - TS/CSE-CO4 TCR Layout (today) TCR Operational ConsolesOper. pc TCR pc (admin.) Oper. pc CSAM Consoles

5 13th May 2004Uwe Epting - TS/CSE-CO5 TCR Hardware and OS (today) Hardware –7 PC running Windows (PIV-2,8GHz) »3 pc with 1 screen »3 pc with 2 shared screens »1 pc with 3 shared screens –1 Unix Console –Connected to the Technical Network (172.18) and surveilled by Spectrum –13 CRT 21” screens, 2 19” LCD screens (CSAM), 2 CRT 19” for operator personal use –9 wired keyboard and mice, 1 wireless keyboard and mouse Constraints –1 PC = 1 CAS application –PVSS zooming and overview capability –Number of keyboards and mice –2 layers desk, not very ergonomic Administration –Windows updates –Windows GPO applied on operational consoles –1 operational account: tcroper –Applications startup only allowed from Yacoma

6 13th May 2004Uwe Epting - TS/CSE-CO6 Current Strategy Integration of industrial systems –Equipment groups provide TCR views based on their tools –Development in equipment groups when possible –Additional TIM views where necessary –Use of common HCI conventions Operation and Maintenance –Use of standard components (PCs) –Use of IT support when possible –Experience with Windows consoles: Easy administration (1.5 persons on part time) No downtime since two years Cheap maintenance

7 13th May 2004Uwe Epting - TS/CSE-CO7 Conclusion Choice of Windows as operating system was taken based on PCR choice some years ago Strategy for integration of LHC infrastructure monitoring is based on Windows and available standard industrial components and contracts with industry TCR system requirements do not change for CCC Maintenance and repair quite easy No manpower, no budget and no time planned for changes Feasability for migration to LINUX not yet studied

8 13th May 2004Uwe Epting - TS/CSE-CO8 Questions ?


Download ppt "13th May 2004Uwe Epting - TS/CSE-CO1 TS-CSE Outline –TCR and TS-CSE-CO mandate –Applications –Console layout –Hardware and Operating System –Strategy –Conclusion."

Similar presentations


Ads by Google