DOE CD-2/3a Review of the BTeV Project – December 14-16, 2004 1 BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.

Slides:



Advertisements
Similar presentations
Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
Advertisements

Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
P. Béné, F. Cadoux, A. Clark, D. Ferrère, C. Husi, M. Weber University of Geneva IBL General Week - 11, 12 February 2010 IBL Stave Loading Status Summary.
ATLAS Module building at Glasgow
HFT PXL Mechanical WBS 1.2 March 2010 Howard Wieman LBNL 1.
Assembly Procedure ALICE Outer Barrel Stave 14 Module 2 Cold Plates 1 Stave.
I.Tsurin Liverpool University 08/04/2014Page 1 ATLAS Upgrade Week 2014, Freiburg, April 7-11 I.Tsurin, P.Allport, G.Casse, R.Bates, C. Buttar, Val O'Shea,
1 Module and stave interconnect Rev. sept. 29/08.
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Physics.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
HFT PXL Mechanical July 2010 Howard Wieman LBNL 1.
STATUS OF THE CRESCENT FLEX- TAPES FOR THE ATLAS PIXEL DISKS G. Sidiropoulos 1.
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
The BTeV Tracking Systems David Christian Fermilab f January 11, 2001.
3D chip and sensor Status of the VICTOR chip and associated sensor Bonding and interconnect of chip and sensor Input on sensor design and interconnection.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
M. Gilchriese Upgrade Stave Assembly and Robotics August 3, 2007 LBNL.
Receive processed un-thinned wafers from E2V. Processed for bump bonding (dice, bump and attach read out chip)
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
Slide 1Susanne KyreTracker week, October 2005 TEC/TOB bias bonds Susanne Kyre University of California, Santa Barbara.
Co-Cure Stave Construction 11/10/2010. Co-Cure cables should have flashbreaker tape still covering the surface for this process. SO - don’t remove the.
BTeV Pixel Detector Laurie Ramroth Fermi National Laboratory Under the direction of: Jim Fast.
Update on Alignment kit and Stave 250 frame and thoughts for Stave 130 M.Gibson (RAL) 2/5/13 1 Status of the frame for stave 250 Status of infrastructure.
Marc Anduze – 09/09/2008 Report on EUDET Mechanics - Global Design and composite structures: Marc Anduze - Integration Slab and thermal measurements: Aboud.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
M. Gilchriese Module Assembly and Attachment at LBNL M. Gilchriese for F. Goozen April 2000.
Silicon /pcb assembly R Thompson, J Freestone LAL 3 June 08.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
BARREL ALIGNMENT PLATFORM POSITIONING Goal: Positioning of the platforms at their nominal position on the MDT chambers (No position measurement in a database).
DOE Rev of Run IIb Sep 24-26, Detector Production WBS James Fast Fermilab.
BTeV Pixel Substrate C. M. Lei November Design Spec. Exposed to >10 Mrad Radiation Exposed to Operational Temp about –15C Under Ultra-high Vacuum,
FPIX pixel module assembly Kirk Arndt on behalf of US CMS Pixel Mechanics R&D at Purdue and Fermilab.
The Inclusive (Measurement ) FVTX aka iFVTX sponsored by LANL-DR in FY ‘06-08 FPIX Chip Module/Hybrid Testcard Pixel Plane Assembly/Integration.
Mikhail Kubantsev - Kansas State University 1 Assembly of a Large Area Microstrip Silicon Tracker Some Experience of Construction of D0 SMT H- disk Silicon.
Assembly Procedure ALICE Outer Barrel Stave 14 Module 2 Cold Plates 1 StaveMarco Kraan Paul Kuijer.
FVTX Review, November 17th, FVTX Mechanical Status: WBS 1.6 Walter Sondheim - LANL Mechanical Project Engineer; VTX & FVTX.
Collaboration Meeting Argonne National Laboratory June 10-11, 2010 Mechanical Design of Glass Tiles and Trays Rich Northrop University of Chicago Second.
Hybrid Mechanical/Thermal Design Ray Thompson / Manchester FP420 meeting Torino 11/12 July 06.
MFT WG5: ladder disk and global assembly Stéphane BOUVIER & Sébastian HERLANT MFT WG7: Mechanics and Thermal studies Jean-Michel BUHOUR & Emili SCHIBLER.
David Bailey Gluing. Silicon /pcb assembly Previously Using Sony Robot and precision dispenser Have established acceptable glue dot parameters Dot electrical.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/10/20102.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Overview Technical Design Overview Design status.
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/23/20102electro-mechanical.
Pixel Pilot system Hardware Status Simon Kwan August 28, 2012 CMS Pixel Upgrade Workshop, Grindelwald1.
D0 PMG, May 04, 2000 Slide 1 Schedule DØ SMT Status Report.
Stave #12 This stave core was built together with William Emmet, Tom Hurteau, and Jeffery Ashenfelter from Yale University in the week of November.
Hybrid and Module Status 1. Hybrid Delivery First hybrids over-etched and shrunk due to changes in design and mistakes in manufacturing – Shrinkage for.
Clive Field, Reggie Rogers, Venkat Srinivasan Undulator Week: BFW Card Status Update 01/23/ BFW Card - Physics Requirements.
FP420 Hybrid Mechanical Design Ray Thompson / Manchester Manchester Xmas O7 Ray Thompson Julian Freestone, Andy Elvin.
Module mounting possibilities (FDR and module task force proposals) & Module mounting status at Dortmund Daniel Dobos, University of Dortmund
25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) Ladder Assembly Procedure Belle II – New Collaborators Meeting.
Clive Field, Venkat Srinivasan Undulator Week: BFW Card Status Update 04/30/ BFW Card Status on behalf of: Keith Caban.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
B2GM, Nov 2014 Laci Andricek, MPG Halbleiterlabor 1 PXD Module Assembly - Overview and SWB bumping -
B2GM, Nov 2014 Laci Andricek, MPG Halbleiterlabor 1 PXD Ladder Assembly - Conceptual design of jigs -
PIXEL 2000 P.Netchaeva INFN Genova 0 Results on 0.7% X0 thick Pixel Modules for the ATLAS Detector. INFN Genova: R.Beccherle, G.Darbo, G.Gagliardi, C.Gemme,
Thoughts about PS module assembly Ulrich Heintz, Meenakshi Narain, Bill Patterson, Eric Spencer, Juan Trenado Brown University, Providence 4/16/2015Heintz,
BM&N STS ladders assembly in VLHEP
Berkeley status Aug 10th, 2012.
ATLAS pixel module assembly flow
Ladder Assembly All tools and jigs produced Glue dispensing works
Low Mass mechanical design
Costruzione dello stave 0 e preparazione per produzione stave OB
Equipment for Assembly – UK Experiences
Module/Ladder Assembly
GLAST Large Area Telescope:
Presentation transcript:

DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James Fast C. M. Lei

DOE CD-2/3a Review of BTeV Project – December 14-16, 2004 Substrate and Half-Plane Assembly – C. M. Lei 2 Pixel Module Assembly Tooling  Take advantages of ATLAS pixel detector experience  Port card (PC) to provide needed electrical circuitry and HDI holding by vacuum suction  Extra long tabs of high-density interconnects (HDI) to provide testing and burn in  Assembly steps summary:  Align and glue a pixel module (consisting of the sensor bump-bonded with read-out chips) to an HDI; Alignment tolerance : 100 microns  Wire bond all electrical connections except that for high voltage (HV)  For HV, solder a flex circuit to the HDI and bond the other end to the back of sensor with epoxy HDI Decoupling Capacitors and Termination Resistors Wire Bonds FPIX Chip Sensor High Voltage Data PIFC Power PIFC

DOE CD-2/3a Review of BTeV Project – December 14-16, 2004 Substrate and Half-Plane Assembly – C. M. Lei 3 Pixel Module Assembly Steps 1 & 2 Assemble PC on a vacuum chuck Align and glue HDI on PC Wire bond HDI to PC Test HDI for opened traces Step 1 Align pixel module (PM) to PM vacuum holder Step 2 Port card (PC) PC vacuum chuck PM vacuum holder PM with alignment targets at corners exposed

DOE CD-2/3a Review of BTeV Project – December 14-16, 2004 Substrate and Half-Plane Assembly – C. M. Lei 4 Pixel Module Assembly Step 3 Position HDI with its vacuum chuck on to pixel module alignment jig Place spacers for PM vacuum plate (The thickness of the spacers will provide some clearance between pixel module and HDI) Step 3 pixel module alignment jig spacers

DOE CD-2/3a Review of BTeV Project – December 14-16, 2004 Substrate and Half-Plane Assembly – C. M. Lei 5 Pixel Module Assembly Step4 Engage PM vacuum holder Align HDI to PM with the aid of CMM then vacuum hold the HDI vacuum chuck when done Step 4 Stationary HDI with its chuck are moved freely under stationary PM

DOE CD-2/3a Review of BTeV Project – December 14-16, 2004 Substrate and Half-Plane Assembly – C. M. Lei 6 Pixel Module Assembly Step 5 Remove PM vacuum holder Change spacers (The thickness of the spacers will provide 50 micron glue between PM and HDI) Dispense epoxy on HDI Re-engage PM vacuum holder, and start gluing PM to HDI Step 5

DOE CD-2/3a Review of BTeV Project – December 14-16, 2004 Substrate and Half-Plane Assembly – C. M. Lei 7 Pixel Module Assembly Step 6 Glue flex circuit Complete HV connections Wire bond PM to HDI Step 6 Flex circuit for HV connections Note: The flex circuit is already soldered to the HDI at this point

DOE CD-2/3a Review of BTeV Project – December 14-16, 2004 Substrate and Half-Plane Assembly – C. M. Lei 8 Pixel Module Assembly Step 7 Transfer and fasten PC to HDI storage base plate Install HDI cover plate Conduct module burn in and testing Step 7 HDI cover plate

DOE CD-2/3a Review of BTeV Project – December 14-16, 2004 Substrate and Half-Plane Assembly – C. M. Lei 9 Pixel Module Assembly Step 8 Remove HDI top cover plate and base plate Fasten PC on its vacuum chuck Remove HDI to HDI wire bonds Cut HDI at designated slots of PC Pixel module formed and ready for half- plane assembly Step 8 cutting slots on PC

DOE CD-2/3a Review of BTeV Project – December 14-16, 2004 Substrate and Half-Plane Assembly – C. M. Lei 10 Half-Plane Assembly  Module placement accuracy of 5 microns is required  Modules will be held by the HDI (wider section) so that fiducial targets at the sensor corners can be seen optically from the top  4-axis stages will be used for precise positioning of modules  Optical targets visible on both sides of the substrate will be used to tie the alignment of modules on one side of the substrate to the modules on the other side  Reliable gluing process is needed which will not damage the substrate or the sensors  Even, thin joints require significant gluing loads  Substrate must be supported from the back side with vacuum plates For second side, support is through first side sensors

DOE CD-2/3a Review of BTeV Project – December 14-16, 2004 Substrate and Half-Plane Assembly – C. M. Lei 11 Half Plane Assembly Steps 0. Glue flex cables on substrate 5. Flip the half populated substrate and vacuum plate holding the silicon modules 6. Repeat steps 1 and 4 with a new set of modules and vacuum plate. Half-populated substrate starts at step Wire bond HDIs to flex cables 4. Align substrate to modules and allow glue to cure 3. Apply glue on substrate 2. Engage substrate into substrate holder then place on stage 1. Align and load modules on vacuum plate 8. Test all modules

DOE CD-2/3a Review of BTeV Project – December 14-16, 2004 Substrate and Half-Plane Assembly – C. M. Lei 12 Module is loaded individually with HDI side down onto module vacuum holder. The Module Placement Setup 4-axis stages on rail Vacuum plate for substrate Vacuum plate for modules

DOE CD-2/3a Review of BTeV Project – December 14-16, 2004 Substrate and Half-Plane Assembly – C. M. Lei 13 Align and Load Modules on Vacuum Plate Module is aligned using 4-axis adjustment of pick and place. A common coordinate system is used to align a full set of modules. Leaf springs provide vertical compliance.

DOE CD-2/3a Review of BTeV Project – December 14-16, 2004 Substrate and Half-Plane Assembly – C. M. Lei 14 Engage Substrate into Substrate Holder then on Stage Cart for module installation moved away and vacuum chuck rotated out of the way. Substrate on substrate vacuum holder All modules loaded – ready for substrate

DOE CD-2/3a Review of BTeV Project – December 14-16, 2004 Substrate and Half-Plane Assembly – C. M. Lei 15 Align Substrate to Modules and Allow Glue to Cure 4-axis adjustment of substrate to modules Leaf springs provide vertical compliance.

DOE CD-2/3a Review of BTeV Project – December 14-16, 2004 Substrate and Half-Plane Assembly – C. M. Lei 16 Flip the Half Populated Substrate and Vacuum Plate Place the substrate with first set of modules underneath on stage. – Repeat Step 2. Second side modules aligned on another modules vacuum plate. – Repeat Step 1 for another side of modules placement

DOE CD-2/3a Review of BTeV Project – December 14-16, 2004 Substrate and Half-Plane Assembly – C. M. Lei 17 Finishing the Half-Plane Assembly Align substrate to modules and allow glue to cure. – Repeat Step 4 for another side of modules placement

DOE CD-2/3a Review of BTeV Project – December 14-16, 2004 Substrate and Half-Plane Assembly – C. M. Lei 18 Status of Half-Plane Assembly  Detailed fabrication drawings completed.  Parts are being made.

DOE CD-2/3a Review of BTeV Project – December 14-16, 2004 Substrate and Half-Plane Assembly – C. M. Lei 19 Summary  The pixel module assembly steps have been thought through. This design will be completed, prototyped and tested with prototype sensor and HDI when they are available.  The design of the half-plane assembly steps have been completed. Parts are being made and will be tested.