Guy Crockford, BE/OP/LHC, CERN WAO 2012 Automation in the SPS and LHC and its effect on operator skills The past 20 years have seen great advances in the.

Slides:



Advertisements
Similar presentations
CWG10 Control, Configuration and Monitoring Status and plans for Control, Configuration and Monitoring 16 December 2014 ALICE O 2 Asian Workshop
Advertisements

8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
AGS pp Status Feb. 6, 2015 RSC Meeting Haixin Huang.
Safe Machine Parameters General Machine Timing Cross-Check Safe Machine Parameters General Machine Timing Cross-Check 9 th May v3.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Friday, h10: Stable beams at 1.38 TeV. 09h03: Beam dump.  One bunch dropped too much in intensity and gave BPMS interlock (dump protection). 10h36:
Patrick Robbe, LAL Orsay, for the LHCb Collaboration, 16 December 2014
Overview of Data Management solutions for the Control and Operation of the CERN Accelerators Database Futures Workshop, CERN June 2011 Zory Zaharieva,
The LHC: an Accelerated Overview Jonathan Walsh May 2, 2006.
IMMW14, Ferney Voltaire, September 2005 (slide 1/35) Experience with configurable acquisition software for magnetic measurement.
Beam Commissioning Workshop, 19th January Luminosity Optimization S. White, H. Burkhardt.
1 Near-term machine performance — The next 5 years, before e-cooling — Wolfram Fischer Run Coordinator for RHIC Run-4 Open Meeting on RHIC Planning Berkner.
LHC progress with beam & plans. Of note since last time Transverse damper Beta beating in the ramp Collimation set-up at 450 GeV & validation LBDS – systematic.
Antiproton Source Capabilities and Issues Keith Gollwitzer & Valeri Lebedev Accelerator Division Fermilab 1.
F Shot Engineering Accelerator Advisory Committee Elvin Harms Fermilab Beams Division 13 May 2002.
1v1 Availability Tracking as a Means to Increase LHC Physics Production B. Todd 1, A. Apollonio 1 and L. Ponce 1 1 CERN – European Organisation for Nuclear.
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
Introduction to availability modelling in ELMAS Arto Niemi.
LHC Utilities & Facilities WAO Daejeong 12/04 – 16/04/2010 Markus Albert on behalf of LHC Operations.
ION COMMISSIONING REVISITED 1 Thanks to: John Jowett, Walter Venturini. Matteo Solfaroli.
1 Tunnel implementations (laser straight) Central Injector complex.
Luminosity expectations for the first years of CLIC operation CTC MJ.
Monday h00: End of fill #1640: 3.7 pb h14: RB S12 and S23 tripped before loading rampdown table, active filter. MPE piquet. Fip_Com_Lost.
Check lists to mouse clicks Automation Session : WAO The Fermi National Accelerator Laboratory is a U.S. Department of Energy (DOE) research laboratory,
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
1 Operational availability Optimizing LHC L. Ponce With the (un)intentiona lcontribution of all OP crew.
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
1 Commissioning and Early Operation – View from Machine Protection Jan Uythoven (AB/BT) Thanks to the members of the MPWG.
CERN Timing Overview CERN timing overview and our future plans with White Rabbit Jean-Claude BAU – CERN – 22 March
Main Injector Beam Position Monitor Upgrade: Status and Plans Rob Kutschke All Experimenters’ Meeting April 3, 2006 Beams-doc-2217-v3.
9/2/2003Tev BPM requirements1 Tevatron BPM and BLM requirements Mike Martens.
Status of the Accelerator Complex Keith Gollwitzer Antiproton Source Accelerator Division Fermilab 2009 Fermilab Users’ Meeting.
Users' Mtg - 4 Jun 08 FNAL Accelerator Complex Status Ron Moore Fermilab – AD / Tevatron Dept.
Outline of 2014/2015 plans V. Kain, M. Lamont, J. Wenninger 6/18/2013Optics Measurement and Correction Review
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
12/16/03Tev BPM requirements1 Tevatron BPM requirements Mike Martens.
TE/TM 30 th March - 0v1 CERN MPP SMP 3v0 - Introduction 3 *fast *safe *reliable *available generates flags & values.
Lumi scan limits checked (in preparation for next fill VdM scans).  Trims of up to 150 um per beam in IP1 & IP2 both planes both beams were done (IP5.
Thursday 20 th April 01:53 RCBV17.R7B2 tripped as happened few days ago: SIS intercepted. 05:54 Stable beams, 1380b, still RF problems B1, abort gap cleaning.
Pushing the space charge limit in the CERN LHC injectors H. Bartosik for the CERN space charge team with contributions from S. Gilardoni, A. Huschauer,
Summary of ions measurements in 2015 and priorities for 2016 studies E. Shaposhnikova 3/02/2016 Based on input from H. Bartosik, T. Bohl, B. Goddard, V.
CHEP 2010 – TAIPEI Robert Gomez-Reino on behalf of CMS DAQ group.
HB2008 – WG F: 27 Aug. S. Childress – Diagnostics_2MW 1 NuMI Beam Diagnostics and Control Steps to 2 MW S. Childress Fermilab.
The LHCb Online Framework for Global Operational Control and Experiment Protection F. Alessio, R. Jacobsson, CERN, Switzerland S. Schleich, TU Dortmund,
Fabio Follin Delphine Jacquet For the LHC operation team
Automatic emittance measurement in the CERN 1.4 GeV Booster
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Top-Up Injection for PEP-II and Applications to a Higgs Factory
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Tuesday 22nd January - morning
Wednesday Morning 8: :30 end of fill study - octupole polarity inversion (Elias, Tatiana, Alexey, Georges, …): Goal: study the effect of the.
LHCCWG Meeting R. Alemany, M. Lamont, S. Page
Summary of Week 16 G. Arduini, J. Wenninger
J. Uythoven, W. Venturini Delsolaro, CERN, Geneva
Wire almost entirely through beam before BLM triggers dump
Summary Thursday h21: Stable beams fill #1303.
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Thursday Fill 1364 (24 bunch) dumped at 07h
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Summary Tuesday h23: Machine closed. Precycle started.
Wednesday h18: 228b fill lost just before start of ramp.
Another Immortal Fill….
Thu :00 Dumped beams, refill for Pb-Pb physics. No more protons in 2011… Some changes: Increase of flat top total voltage to 14 MV. Feed-forward.
LS 1 start date 12th June Schedule Extension 2012 run Extension of 2012 run approved by the DG on 3rd July 2012.
The Automation of the Sequencing of Accelerator Cycles and Events at Fermilab Stanley Johnson Fermilab Accelerator Operations.
Presentation transcript:

Guy Crockford, BE/OP/LHC, CERN WAO 2012 Automation in the SPS and LHC and its effect on operator skills The past 20 years have seen great advances in the CERN accelerator control systems. Low level operation skills have been largely replaced by sophisticated sequencers and feedback loops. At the same time, a drive for greater efficiency, a tendency for more complex accelerator operations and a need to reduce the risk of "human error" have rendered these tools essential. The effect of this controls evolution on operator skills will be analyzed in the context of SPS and LHC accelerator operations at CERN.

WAO 2012 G.Crockford CERN Talk Content  The CERN Accelerator complex  Brief history of accelerator controls at CERN, A progressive evolution towards greater automation  Automation tools in the SPS and LHC  How to manage automation tools without eroding operator understanding SPS LHC France Switzerland CERN

WAO 2012 G.Crockford CERN The CERN Accelerator Complex Super Proton Synchrotron (SPS) Circumference 7km Energy 450 GeV Since 1976 Large Hadron Collider(LHC) Circumference 26km Energy 4 TeV /beam Since 2008 Proton Synchrotron (PS) Circumference 628m Energy 26 GeV Since 1959

WAO 2012 G.Crockford CERN 1959 PS commissioning Synchrotron design based on strong focusing theory Radial position pickup feedback on RF phase Key to passing transition energy and on to a brief world record 25 GeV Beaten 6 months later by the 33 GeV AGS at Brookhaven John Adams Hildred Blewett Wolfgang Schnell

WAO 2012 G.Crockford CERN 1976 SPS Startup, 400 GeV First fully distributed control system. Front end mini computers joined in a network to the control room. Application software written with “Nodal” interpreter. Operations Group taking an active role in application software development.

WAO 2012 G.Crockford CERN 1983 SPS P-Pbar collider. W, Z Boson Carlo Rubbia Simon van der Meer Stochastic cooling key to producing intense antiproton beams Need for automatic countdown sequence of checks before extracting the precious Pbar stack Nobel prize : prepare the SPS as the injector for the future Large Electron Positron collider, LEP UNIX workstations running “C” code application software High level software, physics parameter trims with full trim history

WAO 2012 G.Crockford CERN 1990s LEP operation up to 200 GeV Sequencer Huge progress in control system Database driven settings management, trim incorporation Greatly improved reproducibility of the machine Fixed displays Application software Alarms

WAO 2012 G.Crockford CERN 2012 LHC operation at 4 TeV /beam  Intensities ~4x10¹ 4TeV. Automation tools essential for safe beam control and fast turnaround between physics fills.  Big advances in computing power and application software by now written in Java language.  Well established sequence of tasks to drive the machine via Sequencer tool. Achieve 10 fb‾¹ Integrated luminosity by 4 th August 2012

WAO 2012 G.Crockford CERN Automation today in the SPS  SPS providing beams to many users Fixed Target, Neutrino, various MD cycles, beams to LHC  Need for frequent and rapid cycle changes (LHC fills).  Tools to quickly check and optimize beams. Fixed Target LHC 50nsNeutrino CNGSLHC Probe

WAO 2012 G.Crockford CERN Injector Chain: Cycle Management Allows rapid cycle editing through timing tables All machines linked together through same timing system Around 30 cycles resident in front end, ready to be “played” 20 years ago, an SPS cycle change would take at least 2 hours

WAO 2012 G.Crockford CERN SPS: Automatic Steering (Autopilot) Automatic steering of beam on fixed target Injection oscillations Convenient but may erode operator ability to make a fully manual transfer line steering

WAO 2012 G.Crockford CERN SPS: Beam Quality Monitor Check of key beam parameters before extraction to LHC Check on batches of up to 144 bunches Avoids bad quality beam reaching the LHC Important fixed display snapshot of each extraction

WAO 2012 G.Crockford CERN LHC Injection Quality Check 2x10¹³ per 450 GeV from SPS Automatic check of each batch of beam as it is injected Kicker pulse Beam loss monitors RF Bucket and phase check Injection oscillations and transfer line beam position

WAO 2012 G.Crockford CERN The LHC Sequencer Drive machine through a clear predefined set of sequences. Allows for parallel task execution. Can run sequences automatically, or manually step through. Clear execution status and error reporting. Sequences fully maintained by operations group. Convenient sequence editing tool.

WAO 2012 G.Crockford CERN The LHC Sequencer ~1200 tasks

WAO 2012 G.Crockford CERN LHC: The State Machine Checks that all mandatory tasks have been performed at key break- points in the sequence Gives “green light” before proceeding to a new BEAM MODE Handshake with experiments

WAO 2012 G.Crockford CERN LHC Software interlock + Announcer Software surveillance and interlock on machine critical systems and states. Latches an interlock beam dump or injection kicker inhibit. Compliments hard wired beam interlocks. Same system in both SPS and LHC. The Announcer is separate system based on the same software (separate logic tree). Monitors various systems to announce warning messages according to equipment state.

WAO 2012 G.Crockford CERN LHC Tune Feedback Real-Time Trims Tune (and orbit) feedback essential on LHC ramp Care needed to achieve a reliable measurement Real-time trims need to be checked carefully and end ramp

WAO 2012 G.Crockford CERN LHC Luminosity scan and leveling Automatic process to quickly optimize collisions before declaring ** Stable Beams ** Lower luminosity experiments require automatic “leveling” to limit their luminosity within a certain range LHCb leveling

WAO 2012 G.Crockford CERN LHC: Post mortem viewer Post-Mortem triggered for every beam-dump of intense beams above injection energy Automatic data collection of key systems Forces a proper beam dump analysis to be made by the crew Before allowing further injection

WAO 2012 G.Crockford CERN Coping with Automation  Train new operators on beams where they have freedom to make trims and optimize  Involve crews in non-standard operations and MD studies (which involve switching back to manual operation) where ever possible  Make crews the stakeholders in automation processes. Software development and sequence maintenance  Avoid “Black Box” systems. Provide a display and interface

WAO 2012 G.Crockford CERN Conclusions  Automation today in the SPS and LHC has evolved over many years through the experience gained from various accelerator projects, and made possible by technical advances in computer controls.  Ever more ambitious and technical accelerator projects require a larger degree of automation to operate safely and efficiently.  Operator workload today implies a higher degree of multi- tasking. A larger number of tasks must be performed both quickly and efficiently.  Operations should also be involved in automation process development and maintenance.  Handling intense beams at high energy in the LHC leave no room for operator error. Automation becomes an imperative.

WAO 2012 G.Crockford CERN Thanks for your attention!