Beampipe Installation Status Ray Veness For the Beampipe team in AT/VAC and TS-MME.

Slides:



Advertisements
Similar presentations
VELO Module PRR preparation meeting28-feb-2006 LiverpoolMassimiliano Ferro-Luzzi 1 Introduction VELO overview Overall planning A bit of (recent) history.
Advertisements

TC meeting /11/14TC meeting2 ALICE LS1 plan from now till MarchWeeks Install TRD infrastructure46 TRD4&5 (and counterweights removal)47.
The CERN-JINR Collaboration J. Engelen March 27, 2006.
M. Jimenez AT/VAC Room Temperature (LSS) Vacuum Systems M. Jimenez.
GlueX Solenoid Recent progress and Coil cold tests Paul Brindza September 9, 2004.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM26 at Riverside California March 26, 2010.
IR2 and IR4 Summary PEP-II meeting Jan. 23, 2006 M. Sullivan.
Consolidation and Upgrade of the LHC Experimental Vacuum Sectors
CERN EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH Gerhard Schneider1 14 October 2011 Status of the Composite Vacuum Chambers M. Gallilee, C. Garion, M. Malabaila,
Construction and Installation of the CLIC Experimental Area
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
Pixel Support Tube Requirements and Interfaces M.Olcese PST CDR: CERN Oct. 17th 2001.
FP420 Vacuum Ray Veness. Contents o What is FP420? o How would it be installed in the LHC? o What would it look like? o What are the issues/interest for.
Experimental Beampipes: Status and Outlook Ray Veness / AT-VAC For the beampipe team With many thanks to the experiment’s installation and coordination.
Vacuum studies at LAL Bruno Mercier, Christophe Prevost Alexandre Gonnin, Christian Bourgeois, Dirk Zerwas R.P. ILD MDI Meeting 24/3/15.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
TOF Gas System Project Overview. Content Prototype for Aging tests done for RPC’s TOF Gas System: parameters and module layouts. Special Technology: channel.
SU ACTIVITIES PENDANT LS1 CMS ALICE. Antje Behrens | SU pendant LS1 day| | EDMS | page 2 CMS Quoi (quelles activités prévues pendant.
M. Karppinen TE-MSC-ML on behalf of S. Atieh, P. Cruikshank, M. Duret, J-C. Perez, V. Parma, T. Renaglia, S107, S108, Dubna teams Pressure relief valve.
1 Progress of IR Vacuum Chambers Chen Peng May 11,2007.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
Experimental Sectors Ray Veness / AT-VAC With many thanks to G.Foffano + W.Cameron TS/MME Patrick Lepeule / AT-VAC.
Preliminary View on the LHeC Experimental Vacuum Chambers Jonathan Bosch - University of Manchester And Ray Veness - TE/VSC J.Bosch and R.Veness LHeC -
Technology Department LSS2 modifications Impact on the vacuum systems LTEX - 18/01/2011 Eric PAGE – TE-VSC.
Cable Layouts, Connectors for the LHC GAS SYSTEMS GAS COORDINATION MEETING, OCTOBER 2005 PH / DT1 GS.
All CMS 30 May07 TSV1 All CMS 3 30 May 2007 LHC machine CMS Progress Overall Schedule.
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
TAS at IP5 Present situation and plans François BUTIN TS/LEA.
25 January 2007VELO sub-projectsEddy Jans 0 VELO-meeting January 25, 2007 Sub-projects: SX & SX connectorize cooling cables alignment procedure.
OLAV3 Engineering Integration and installation of experimental beam pipes: the case of LHC 7/8/20111P.Lepeule for VSC group.
Lukasz Krzempek TE-VSC-DLM 28th WP8 Bi-weekly meeting Tuesday, 24 November 2015 Vacuum layout (Experimental side)
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
Dec
MCP Status Magnet Control Project - MCP Common systems: MCS – Magnet Control System – S. Ravat MDS – Magnet Diagnostics System – S. Ravat MSS – Magnet.
1 Run7 startup M. Sullivan MAC Review Nov , 2007 M. Sullivan for the PEP-II Team Machine Advisory Committee Review November 15-17, 2007 Run 7 Startup.
Special interventions Status of production and QC Nicolas Bourcey TE-MSC-MDT Fourth LHC Splice Review November 2013.
4 December 2007Sylvain Weisz - LEMIC1 Status of LHC installation.
Gas System Construction Status Oct FH. General Construction is proceeding well, (nearly on-schedule). Testing of Racks is longer than foreseen Testing.
8/12/2010Dominik Dannheim, Lucie Linssen1 Conceptual layout drawings of the CLIC vertex detector and First engineering studies of a pixel access/insertion.
Update on Experimental Beampipe Progress Ray Veness For Beampipe project team in AT/VAC and TS/MME With special thanks to: S.Calatroni, W.Cameron, D.Duarte,
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
TE-CRG Activities D. Delikaris, TE-CRG.
1 st LTEX meeting Protecting the experimental caverns and personnel from a "sector 34 like" incident: work planned in the LHC tunnel Prepared by M GASTAL.
Central vacuum valve in ALICE Pros and Cons ALICE TC –
Proposed integration of cryo BLMs in LHC during LS1 V.Parma, CERN, TE-MSC With contributions/input from: M.Sapinski (BE-BI) Th.Renaglia (EN-MME) N.Bourcey.
Status of MICE RF for Step V’ (at LBNL) Derun Li Lawrence Berkeley National Laboratory December 6, 2014.
LHC Beampipes Ray Veness / AT-VAC FP XII 08Beam Vacuum- R.Veness.
Lukasz Krzempek TE-VSC-DLM 29th WP8 Bi-weekly meeting Tuesday, 15th November 2015 Vacuum layout (Experimental side)
21 Mar 2007ALICE - Paul Dauncey1 ALICE CR07: Installation and Commissioning Paul Dauncey Material from: L. Leistam: “ALICE Status” W. Riegler: “Commissioning.
ELENA installation progress F. Butin / ELENA collaboration.
Vacuum System P. Chiggiato TE-VSC
ELENA installation and commissioning status
Installation of an Instrument on a CERN machine
INSTALLATION SEQUENCE
Machine-Experiment Interface
Preliminary Y-chamber specifications – First draft
on behalf of the RF group
LHC Experimental Vacuum Systems Status October ‘07
Long Shutdown for the LHC: Vacuum Beam Pipes
Installation step 4. (3 days)
Consolidation and Upgrade of the LHC Experimental Vacuum Systems
Progress with Experimental Vacuum Chambers
Upgrade Strategy for the Experimental Vacuum Systems
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
Installation plans from mid 2005
UPPSALA UNIVERSITY_GERSEMI PROJECT
Presentation transcript:

Beampipe Installation Status Ray Veness For the Beampipe team in AT/VAC and TS-MME

LEMIC 20 III 07Beampipe status- R.Veness Overview o Introduction o Last status report end of Nov ’06 o Installations now well under way in ALICE and LHCb o Concentrating on schedule follow-up, with status on remaining assembly work o Contents o Overview for ALICE o Overview for ATLAS o Overview for CMS o Overview for LHCb o Summary

LEMIC 20 III 07Beampipe status- R.Veness ALICE Temporary Support Temporary support prepared to substitute for missing Q1 allows installation to proceed

LEMIC 20 III 07Beampipe status- R.Veness ALICE Central Part beryllium chamber in the experiment 19/3/07 Insertion and connection planned 21/3/07

LEMIC 20 III 07Beampipe status- R.Veness ALICE RB26 Commissioning ALICE RB26 and central (beryllium) part should be commissioned by Easter, if all goes to plan Gas Injection System in ALICE

LEMIC 20 III 07Beampipe status- R.Veness ALICE RB24 Commissioning Delayed due to other installation work in machine and experiment – dates still not clear

LEMIC 20 III 07Beampipe status- R.Veness ATLAS – Schedule changes Zones between Q1 and TAS awaiting Q1 repairs before installation Details of installation sequence and dates still evolving

LEMIC 20 III 07Beampipe status- R.Veness ATLAS Work in Progress o Chambers o Final (VJ) chambers being NEG coated o Vacuum instrumentation modules at 19m being tested o Supports and tooling o Assembly and testing of supports in progress o Installation tooling design and production with ATLAS o Cabling and Services o Cabling installation started Jan ’07 in the cavern Test of 19m pump module in 927

LEMIC 20 III 07Beampipe status- R.Veness CMS – Schedule Changes Installation and commissioning of central chambers still ‘as late as possible’ Installation of forward chambers re- scheduled to April-May due to seal leak issue

LEMIC 20 III 07Beampipe status- R.Veness CMS TAS Seal Leak Issue o CMS 54-side forward pipe o Forward pipe assembly inserted in cavern Jan ’07 as scheduled o Installation OK, but leak of ~10 -8 mbar.l.s -1 on seal, which could not be fixed in-situ o TAS, forward chamber and remote flange assembly all individually tested before installation o Solutions applied o After discussions with seal suppliers, non-conforming sealing surface finish will be modified o Remote flange mechanism is being refined o Apply to CMS then ATLAS

LEMIC 20 III 07Beampipe status- R.Veness CMS Work in Progress o Chambers o Final (HF-CT2) chambers being prepared for NEG coating o Installation Testing o Test of installation and bakeout in tracker section being prepared in 927 with CMS tracker team o Test of half-length installation under preparation in 927

LEMIC 20 III 07Beampipe status- R.Veness LHCb – UX85/3 UX85/3 – the large beryllium cone was leak-sealed, NEG coated and installed in the detector UX85/3 installation in LHCb – February ‘07

LEMIC 20 III 07Beampipe status- R.Veness LHCb – UX85/4 UX85/4 – large stainless steel conical section was installed afterwards, as scheduled UX85/3 installation in LHCb – February ‘07

LEMIC 20 III 07Beampipe status- R.Veness LHCb – UX85/2 and Bellows UX85/2 – the intermediate beryllium cone, is in position awaiting installation of protection. After this, the bellows will be added to close the UX85 sector

LEMIC 20 III 07Beampipe status- R.Veness LHCb - Commissioning We propose to wait for the availability of the Q1 on 8R in mid-April before commissioning this sector, to avoid temporary installations such as in ALICE RB84 commissioning will be performed late after Q1 repairs to the sector that is now cold

LEMIC 20 III 07Beampipe status- R.Veness Summary o Schedules o ALICE and LHCb – installation now progressing well, no major issues to date! o ‘Non-experimental’ sectors (RB24 and RB84) o Closure and commissioning are being pushed parallel with ATLAS and CMS o Discussion under way to use LSS installation teams for these sectors o ATLAS and CMS – Schedules still evolving and linked to the machine installation milestones o Non-availability of Q1s causing additional work and delaying installations, but should not impact on overall schedule o Issues o TAS flange leak – solutions being implemented, but we will need to wait for the April/May installation window in CMS to be 100% sure o Resources for the full installation tests of ATLAS and CMS systems are still limited