Managing TDM Drawings Lifecycle WorkFlow Created: March 30, 2006 Updated: April 10, 2006 By: Tony Parker.

Slides:



Advertisements
Similar presentations
Use of RtReports in the Pharmaceutical Environment
Advertisements

MOSS 2007 Document Management Adam McCarthy 1 st April 2009.
Configuration Management
ProcessIt Document Library 8.0 Controlled Documents Suite.
EvalS Application User Guide version September 17, 2011.
Software Quality Assurance Plan
PUSH PUBLISHING POWER. Session Scope What is dotCMS Push Publishing How to set it up How it works & what can go wrong How to troubleshoot.
1 / 16 CS 425/625 Software Engineering Software Configuration Management Guest Speaker Jim Hunt November 17, 2008.
1 HRAdminTool Update May Brief History of HRAdminTool Version 1 Release – January 2003 (Jointly developed by Benefits & SOMIT)  GEAC position,
CS 501 : An Introduction to SCM & GForge An Introduction to SCM & GForge Lin Guo
Document Control Abayomi Odeleye Nottingham University Computer Science.
Configuration Management
Software Configuration Management
1 CMPT 275 Software Engineering Revision Control.
®® Microsoft Windows 7 for Power Users Tutorial 10 Backing Up and Restoring Files.
Software Configuration Management
Welcome to the Nebraska SharePoint User Group May 7 th, 2008 Enterprise Content Management (ECM) in SharePoint Corey Erkes.
Architecture of information systems Document managment system Peter Záhorák.
SE-02 CONFIGURATION MANAGEMENT Today we talk about Software Configuration Management (SCM for short): - What? - Why? - How?
VERSION 7 What’s to Come?. Workflow – Lifecycle Definition  Ability to define custom Lifecycles NEW BEING WORKED IN REVIEW WAITING FOR APPROVAL APPROVED.
Information Systems Security Computer System Life Cycle Security.
Software Engineering Modern Approaches
Software Configuration Management
Hands-On Microsoft Windows Server 2003 Administration Chapter 2 Managing Windows Server 2003 Hardware and Software.
What to do for a Financial year end And When to do it.
1 Software Development Configuration management. \ 2 Software Configuration  Items that comprise all information produced as part of the software development.
Middle States Self-Study Online Resources. Primary Web Resources  Provost’s MSCHE site  Document and Feedback request forms  Secure MSCHE Document.
ALMA Integrated Computing Team Coordination & Planning Meeting #4 Santiago, November 2014 Reporting Software Principles M Chavan, ESO R Soto, ALMA.
State Agencies’ Records Retention Schedule S6: Information Systems Records S6 Retention Schedules.
1 NTTC/NTC ERO Training 2011 Tax Year 2007 ERO TRAINING ELECTRONIC RETURN ORIGINATOR (ERO) (Transmitter in Tax-Wise)
Software Quality Assurance
Study for Migration from CVS to SubVersion (SVN) Gunter Folger CERN/PH/SFT.
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
Project Café Update LRTL Meeting November 2008 Jason Schober Director, Project Café
Software Engineering 2003 Jyrki Nummenmaa 1 CONFIGURATION MANAGEMENT Today we talk about Software Configuration Management (SCM for short): -
Legal Information on the Web - can we trust the official version? Jules Winterton Institute of Advanced Legal Studies, University of London International.
Teamcenter – Overview Teamcenter - Lab Wide EDMS1.
CIT 470: Advanced Network and System AdministrationSlide #1 CIT 470: Advanced Network and System Administration Change and Configuration Management.
WorkManager Concepts & Schema Course Outline The Old “Business Rules” Traditional LBNL CAD Method New “Business Rules” Engineering Data Management WorkManager.
CharMeck.org Contributer Training SharePoint 2013 Orientation and Basic Training.
Data Integrity # Best Practices & Lessons Learned. Does It Fit Your Organization?
Topic 6 Managing stage boundaries
Copyright 2010, The World Bank Group. All Rights Reserved. Recommended Tabulations and Dissemination Section B.
The aim of producing a backup strategy is to make sure that a computer system can be returned to its original state if data has been lost or corrupted.
ISO DOCUMENT CONTROL. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be able to: 
Copyright © 2007, Oracle. All rights reserved. Using Document Management and Collaboration Appendix B.
ONBASE: HOW TO UPLOAD DOCUMENTATION EFFICIENTLY April 2, 2015.
Building Preservation Environments with Data Grid Technology Reagan W. Moore Presenter: Praveen Namburi.
Chang, Wen-Hsi Division Director National Archives Administration, 2011/3/18/16:15-17: TELDAP International Conference.
Can you do this in SmarTeam?
Engineering Documentation
Brian Drendel November 15, Ideas TDM (Engineering drawings) Beamssrv1 Z: drive Beamssrv1 Department Drive Indico Meeting Server Document Database.
SharePoint University of the Highlands and Islands SharePoint for Records Management.
© 2015 Lexmark International, Inc. All rights reserved. December 8 – 16 th, x Enovia Upgrade Training.
The VVSG 2005 Revision Overview EAC Standards Board Meeting February 26-27, 2009 John P. Wack NIST Voting Program National Institute.
Completing & Searching Entries
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
Internet Made Easy! Make sure all your information is always up to date and instantly available to all your clients.
ELECTRONIC RETURN ORIGINATOR (ERO) (Transmitter in Tax-Wise)
PROJECT MANAGEMENT AND CONTROL
Configuration Management and Prince2
Software Configuration Management
SysML 2.0 Model Lifecycle Management (MLM) Working Group
Maintaining software solutions
Document Management Don Mitchell March 15, 2019.
SharePoint Foundation 2010
A CAD to Aras PLM connector solution
Final Design Authorization
Robin Dale RLG OAIS Functionality Robin Dale RLG
A CAD to Aras PLM connector solution
Presentation transcript:

Managing TDM Drawings Lifecycle WorkFlow Created: March 30, 2006 Updated: April 10, 2006 By: Tony Parker

Introduction Due to TDM data integrity control and requirements for migration from TDM to Teamcenter the following workflow has been implemented in all Fermilab TDM’s using the macro programs to control items. Reference: See Protecting Your Data Using States in TDM on the CAD web site for information on using states.Protecting Your Data Using States in TDM All TDM’s have been configured so that the RELEASE drawing macro will set the Drawing’s state to RELEASED which means that the Library Drawing is locked from any future modification as it should be. In order to modify a released drawing, a new version is created. Problem 1: The new version created still has the Revision level of the released drawing it was created from. This is not desirable and the drawing will be forced to the next revision level the first time you get it from your bin. Problem 2: Not all users are following the required Release / Revise cycle for drawings. Problem 3: You can no longer undo certain things, i.e. you create a new version of a released drawing, check out, open which forces a revision, modify, and then determine the revision is not required. It requires a Manager role person to fix these for you by rolling back to the previous Released drawing and removing the Revision record. Problem 4: There are likely existing problems in items that were incorrectly set to RELEASED state or items that were not correctly released in the TDM. These will require Manager assistance to correct. Problem 5: The revise drawing macro can’t check in a drawing that is out of date. But wait – how do I do my work now? Read on

Drawing Lifecycle – Initial Revision All drawings created under the macro control must follow this lifecycle to assure proper release and revision control. 1.Create Drawing, using a standard Drawing Template if possible. 2.Check drawing in to the Correct Project Library. Use the Check in Keep to modify macro to avoid incorrect Library location. 3.Work on the drawing checking in to secure the data as often as required. 4.When the drawing is ready for checking and approving, plot the file and get required signatures. If you are using an external release process which includes an ECO or Release document, process the required hardcopy to the final stage of your release. 5.Record all signatures and dates on the electronic drawing to preserve the history, and secure the information in case the original hardcopy is destroyed. 6.Run the RELEASE THIS DRAWING macro to release the electronic CAD file and lock it from modification. This also creates archived files for disaster recovery as well as pdf files for use in the online web query tool. Note that Release does not necessarily imply Fabrication, this the documented history of the drawing and only assures that a record of the drawing in the current state is preserved. These are the steps for processing all new drawings.

Drawing Lifecycle – Revision Control All drawings created under the macro control must follow this lifecycle to assure proper release and revision control. 1.After the initial revision has been released (locked) the drawing can only be modified by using the Create New Version library procedure. 2.Check out the New Version you create which has a state of INITIAL. 3.When you get the drawing from the model file bin, the REVISE THIS DRAWING macro will run and increment the drawing revision level. NOTE: Ideas will not allow an out of date drawing to be checked in, so the revise drawing macro can’t push a new revision to the library in these cases. The revision will be correctly applied to the drawing, and logged, but it is the users responsibility to make sure the drawing is updated and checked in to commit the revision to the Library. 4.When the drawing is ready for checking and approving, plot the file and get required signatures. If you are using an external release process which includes an ECO or Release document, process the required hardcopy to the final stage of your release. 5.Record all signatures and dates on the electronic drawing to preserve the history, and secure the information in case the original hardcopy is destroyed. 6.Run the RELEASE THIS DRAWING macro to release the electronic CAD file and lock it from modification. This also creates archived files for disaster recovery as well as pdf files for use in the online web query tool. Note that Release does not necessarily imply Fabrication, this the documented history of the drawing and only assures that a record of the drawing in the current state is preserved. These are the steps for processing all subsequent Revision cycles.