RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR 2009 9/30-10/1 9 EFW Overview and Status Keith Goetz University of Minnesota.

Slides:



Advertisements
Similar presentations
Leicester SRC, 3-5 Dec 2007 Systems engineering at detector level Tim Stevenson.
Advertisements

GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Aug. 14, 2001 Scott Williams 1 GLAST Large Area Telescope: Instrument Operations Center Scott.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.3 Verification and Validation 1 Gamma-ray Large Area Space Telescope.
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
GoetzFIELDS iPDR – I&T SPP/FIELDS Integration and Test Preliminary Design Review Keith Goetz University of Minnesota 1.
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
Technical Reviews Module Space Systems Engineering, version 1.0
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Ship Review (I-PSR) MISSION ASSURANCE Brian Klatt January 3-4, 2008.
FIELDS iCDR Solar Probe Plus FIELDS Instrument CDR Introduction 1Peter Harvey.
SwRR 4/28/ Telecon MAVEN Particles and Fields Flight Software Requirements Review SwRR Peter R. Harvey April 28, 2010.
Standard WBS Version 1.0 WBS2-3.pptPage 1 Standard Work Breakdown Structure Legend = Decomposes to lower level WBS elements 4.0 Implementation 4.0 Implementation.
Sept. 2008EFW INST+SOC PDR RBSP EFW GSE and SOC-GSE GSE and SOC-GSE (Science Operations Center In Support of INT) John Bonnell Will Rachelson Matt.
From Research Prototype to Production
VST: dome THE LIFE CYCLE OF MODERN TECHNOLOGICAL PROJECTS Ing. Davide Fierro THE LIFE CYCLE OF MODERN TECHNOLOGICAL PROJECTS.
NASA’s Goddard Space Flight Center Systems Engineering Mike Pryzby Swales Aerospace August 16-17, 2005.
THEMIS SRR Requirement Overview - 1 UCB, 07/08/2003 REQUIREMENT DEVELOPMENT OVERVIEW Ellen R. Taylor Mission Systems Engineer Space Science Laboratory.
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Test Plan Michael Ludlam Space Sciences Laboratory.
Lifecycle Review Entry/Exit Criteria Method
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
Refined ECSS Software Process Model Elements SD-TN-AI-0570, Issue 5 APPENDIX D.
C osmic R Ay T elescope for the E ffects of R adiation PERFORMANCE ASSURANCE BRIAN KLATT MISSION ASSURANCE MANAGER.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW Boom PER 30 June RBSP EFW Spin Plane Booms Greg Dalton Space Sciences.
NCSX NCSX Design Review Guide May 27, 2005 Wayne Reiersen NCSX.
Solar Probe Plus FIELDS Team Meeting Management Items 08/05/2014.
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd1 RBSP Instrument/Suite Name Critical.
Constellation Space Transportation Planning Office July 30, 2009.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Overview and Status Keith Goetz University of Minnesota.
Critical Design Review (CDR)
Lifecycle Review Entry/Exit Criteria Method
24b - 1 NASA’s Goddard Space Flight Center LRO Safety Dave Bogart Code 302 August 16-17, 2005.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 12/25/20151 Flight Software Template for Instrument Critical Design Review Gary M. Heiligman.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 213 Low Voltage Power Supply & Power Controller Board Peter.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes LVPS+PCB Peter BergRBSP/EFW CDR /30-10/1 IDPU LVPS AND PCB Critical Design Review.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP-EFW SMA I-CDR RBSP EFW SMA Safety and Mission Assurance Instrument -
Solar Probe Plus A NASA Mission to Touch the Sun Mission Operations Review News Elena Adams 7/16/2015.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 100 EFW DFB Systems Assurance Trent Taylor LASP.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Flight Software Summary Peter Harvey Space Sciences.
June 16, 2015SPP/FIELDS SOC CDR: Integration & Test SPP/FIELDS Integration and Test SOC Critical Design Review Keith Goetz University of Minnesota
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
Pre-PDR Peer Review 1 UCB MAVEN Particles and Fields Flight Software Peer Review Requirements Definition Peter R. Harvey May 12, 2010.
HarveyFIELDS iCDR – Flight Software Solar Probe Plus FIELDS DCB FSW Requirements Peter Harvey University of California 1.
GOES-R Series User Readiness Planning and Development May 12, 2004.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 100 EFW DFB Systems Assurance Trent Taylor LASP.
Solar Probe Plus FIELDS Team Meeting Management 7/07/2015.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 Thermal Design Christopher Smith RBSP Thermal Engineer Space.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Systems Engineering Michael Ludlam Space Sciences.
GLAST LAT ProjectPeer Review & CDR Preparation Document: LAT-PR Preparation Schedule Subsystems Peer Reviews –ACD January 7-8, 2003 –CALMarch.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January Instrument Pre-Environmental Review Safety and Mission.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 11 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 647 Ground Support Equipment Will Rachelson University of.
Supportability Design Considerations
Keith Goetz University of Minnesota
Agenda. Solar Probe Plus FIELDS Main Electronics Package iPER Agenda Feb 2, 2017.
Solar Probe Plus – FIELDS Verification Instrument mini-PER (V5)
SE and SSE Trade-Off Analyses
Software and System Delivery
0.0 Instrument Suite Name Presenter’s name
Peer Review Agenda (Suggested).
CRaTER Pre-Environmental Review (I-PER) Completed Verification Results Bob Goeke September 10-11, 2008.
MRL 6 Artifacts (at End of TMRR) Page 1 of 6
BRIAN KLATT MISSION ASSURANCE MANAGER
Thermal Vacuum Test: Plans and Procedures
Integration and Test Organization Chart
CRaTER Pre-Environmental Review (I-PER) Completed Verification Results Bob Goeke September 10-11, 2007.
Instrument PDR Summary of Objectives
Presentation transcript:

RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 9 EFW Overview and Status Keith Goetz University of Minnesota

RBSP/EFW CDR /30-10/1Goetz 10 ICDR Entrance Criteria A successful IPDR –Responses to RFAs in hand ICDR Readiness Meeting –Preliminary ICDR Agenda Agreement –ICDR Success Criteria Agreement –Review Board charge ICDR technical documentation –Updated baselined documents –Instrument specifications –Fabrication, assembly and integration plans –Technical data package –Operational limits and constraints –Command and telemetry lists –Verification & Validation plans (SE-001, SW-002, TE-001) –Commissioning plans –Updated risk assessment/mitigation –Updated reliability analyses and assessments (MA-002) –Updated logistics documentation (SE-006, TE-004) –Software design documentation and specifications (SW-004) –Limited life items (MA-002) –Preliminary safety analyses (MA-006) –Certification plans and requirements

RBSP/EFW CDR /30-10/1Goetz 11 ICDR Success Criteria Design is expected to meet requirements with acceptable margins and risks Interface Control Documents allow fabrication High confidence in instrument baseline; documentation exists or will exist to allow fabrication, assembly, integration and test Instrument verification and validation plans are complete Testing approach is comprehensive; planning for assembly, integration, test and launch and mission ops sufficient Technical and programmatic margins and resources exist to allow development within budget, schedule and risk constraints Risks to success are understood, credibly assessed and manageable Safety and mission assurance have been adequately addressed

RBSP/EFW CDR /30-10/1Goetz 12 ICDR Expectations Engineering model development has proceeded well –AXB mechanism has been developed, tested and fully qualified –SPB mechanism has been developed, tested and fully qualified –ETU electronics have been developed and tested Initial performance looks good –EFW system has been integrated with EMFISIS Demonstrates functional interfaces –Flight and ground software allow end-to-end data flow –We will continue to work with the ETU for the next month or two Characterization Self compatibility Thermal testing EMC testing (conducted emissions) Magnetics sniffing Zap testing Procedures and documentation are in place No major open issues EFW is ready to move into building flight hardware

RBSP/EFW CDR /30-10/1Goetz 13 This page intentionally almost blank