A Different Focus on NASA Science Mission Success (a first cut) Mark V. Sykes Planetary Science Institute.

Slides:



Advertisements
Similar presentations
1 Slide 1 Ontolog Conference Call – 20 April, 2006 Ontologizing the ONTOLOG Body of Knowledge W hat In It for Me? – Engineering the Value Proposition for.
Advertisements

Panel 2 – Promoting Re-Use of Scientific Collections John Harrison SHAMAN Project University of Liverpool
CHAPTER 1 WHAT IS RESEARCH?.
LADEE PDS4 Experience G. Delory LADEE Instrument and PDS Teams LADEE SOC PDS Management Council Nov /19/2014 LADEE PDS4 Experience 1.
Kepler Martin Still (NASA Ames) 25 April Portals to the Universe: Lessons Learned Meeting - Apr 25, STScI - Martin Still mission duration3.5.
OIB Long Range Planning Luthcke and Jezek. OIB Long Term Observation Goals OIB is meant to provide data to improve our understanding of the mass evolution.
Telecom Lifecycle Management Solutions for Sales Partners.
Need for Network Planning IACT 302 Corporate Network Planning.
CIRS Data Archiving Status Presentation to the Cassini CIRS Team Meudon, France - April 2004 Conor A Nixon (University of Maryland) Mike Flasar (NASA GSFC)
Participatory Design for Sustainable Development Matthew Kam Feb 7, 2003.
Applied Software Project Management 1 Introduction Dr. Mengxia Zhu Computer Science Department Southern Illinois University Carbondale.
02/07/2001 EOSDIS Core System (ECS) COTS Lessons Learned Steve Fox
PDS4 User Support Working Group WP Summary Mark Sykes (PSI) Mike A’Hearn (Umd) Lisa Gaddis (USGS) Ray Walker (UCLA) Mark Rose (NASA Ames)
Software Process and Product Metrics
Introduction of Space Technology. The James Webb Space Telescope The James Webb Space Telescope was previously known as the Next Generation Space Telescope.
MASFAA 2013 October 6 th – 9 th, 2013 Indianapolis, Indiana Scholarship Administration and Software Tools: Getting Started Presenters Phil Knight – Next.
Chapter 36 financing the business Section 36.1 Financial Analysis
S T A M © 2000, KPA Ltd. Software Trouble Assessment Matrix Software Trouble Assessment Matrix *This presentation is extracted from SOFTWARE PROCESS QUALITY:
Implementing 2007 NRC Portals of the Universe Report Chandra X-ray Center 25 April 2012 Implementing Portals of the Universe, April
CXC Implementing 2007 NRC Portals of the Universe Report Chandra X-ray Center Recommended Best Practices Roger Brissenden and Belinda Wilkes 25 April 2012.
Conferences - Hosting/co-hosting science conferences - Exhibit and present project output and services at community conferences Training Workshops - Data.
OSIRIS-REx Asteroid Sample Return (NASA New Frontiers Program)
2-3 April 2009PDS MC Rapid-prototyping tools. 2-3 April 2009PDS MC Rapid-prototyping tools Legend: Gray – Existing tool effort; White – Proposed tool.
The Teacake Club Building a learning community of front line welfare to work staff Richard Scothorne, Rocket Science Faye Thomas, Cardinalis.
Human Resource Management Lecture 27 MGT 350. Last Lecture What is change. why do we require change. You have to be comfortable with the change before.
Exploring Our Past, Securing Our Future Space Grant Symposium April 12 th 2014 Model-based Systems Engineering of The OSIRIS-REx Mission's Science Processing.
THEME 1: Improving the Experimentation and Discovery Process Unprecedented complexity of scientific enterprise Is science stymied by the human bottleneck?
Archiving 40+ years of Planetary Mission Data - Lessons Learned and Recommendations K. E. Simmons LASP, University of Colorado, Boulder, CO
Sharing Lunar Exploration with the World: Examples from the Moon Mineralogy Mapper (M 3 ) Education / Public Outreach Program Cassandra Runyon, PhD College.
Elements of a Data Management Plan Bill Michener University Libraries University of New Mexico Data Management Practices for.
PROPOSING TO WRITE A PROPOSAL? BY PAPIA BAWA. What are Proposals? Long reports usually written in response to a specific request or in response to your.
By Ritesh Reddy Nagaram.  Organizations which are developing software processes are facing many problems regarding the need for change of already existing.
1 SPSRB Decision Brief on Declaring a Product Operational Instructions / Guidance This template will be used by NESDIS personnel to recommend to the SPSRB.
Thomas C. Stein PDS Geosciences Node Washington University in St. Louis 1MS Supporting Active Surface Missions and Adding Value.
Software Engineering Modern Approaches Eric Braude and Michael Bernstein 1.
All rights reserved © Altec ExoMars 2018 Rover Operations Control Centre Planned Organization of ROCC Operations I. Musso.
T Final demo I2 Iteration Agenda  Product presentation (20 min) ‏  Project close-up (20 min) ‏ Evaluation of the results  Questions.
The Challenge of Software Cost Estimation for Long-Term Information Preservation of Earth Science Data Bruce R. Barkstrom Asheville, NC Paula L. Sidell.
PDS Geosciences Node Page 1 Archiving Mars Mission Data Sets with the Planetary Data System Report to MEPAG Edward A. Guinness Dept. of Earth and Planetary.
© 2004 SENTEL Improving Software Quality Through Communication Kanchan Bajaj, SENTEL Corporation
Presented to Kepler Pre-Launch Educator Workshop January 31, 2009 Shari Asplund Discovery and New Frontiers Programs Education and Public Outreach Manager.
Inferential Statistics A Closer Look. Analyze Phase2 Nature of Inference in·fer·ence (n.) “The act or process of deriving logical conclusions from premises.
Interagency Collaborations Sharing Facilities and Testbeds Jointly Supporting Facilities and Testbeds Renting Other Agency Facilities and Testbeds Rapid.
NASA Perspectives on Data Quality July Overall Goal To answer the common user question, “Which product is better for me?”
The TTC Behaviour Change Methodology. Process of Behaviour Change.
PoDAG XXI: SEEDS SEED: NSIDC Potential Interactions NSIDC DAAC should prepare an evaluation of their desired future roles in "core activities" and in mission.
Software innovation theoretical model. the model: outputs (outcomes) product/service innovation process innovation factors (drivers) outputs (outcomes)
Science Data in the Science Mission Directorate (SMD) Jeffrey J.E. Hayes Program Executive for MO & DA, Heliophysics Division August 17, 2011.
Project Management. Define the big picture clearly, concisely and convincingly 1.Is your elevator pitch convincing? 2.Is your.
ARL Workshop on New Collaborative Relationships: The Role of Academic Libraries in the Digital Data Universe September 26-27, 2006 ARL Prue.
DI Scenario for Social Science: Education for better science, better citizens and better communities Easy to imagine: Shift from data poverty to data wealth.
MODIS SDST, STTG and SDDT MODIS Science Team Meeting (Land Discipline Breakout Session) July 13, 2004 Robert Wolfe Raytheon NASA GSFC Code 922.
GLAST Science Support CenterAugust 10, 2004 Users’ Committee Meeting The Project Data Management Plan David Band – GSSC.
SOFTWARE ARCHIVE WORKING GROUP (SAWG) REPORT TODD KING PDS MANAGEMENT COUNCIL MEETING FEB. 4-5, 2016.
Status Reports: Messenger and Dawn S. Joy. MESSENGER It has been previously reported that the MESSENGER project did not plan on archiving any data EXCEPT.
INFO 636 Software Engineering Process I Prof. Glenn Booker Week 10 – Process Definition 1INFO636 Week 10.
The Project Name “The Finest Green Life” The Team Members.
Yes, Data Management Can Be Agile! Michele Goetz, Principal Analyst.
1 Balancing Science and Engineering D Lumb. 2 Science Instrument Funding Generally the spacecraft and common systems are provided by ESA, the instrumentation.
ESDIS Standards Office Yonsook Enloe, CTSI 3/2/ FGDC Meeting1.
July 27, Brain Works Consulting, LLC 1.
Case Study of Agile Development Ronald J. Leach Copyright Ronald J. Leach, 1997, 2009, 2014,
7/17/07NASA Report1 NASA Archiving Activities - Lessons Learned 2nd International Planetary Data Alliance Steering Group July 17, 2007 Reta Beebe PDS Program.
Accounting for the Value of Earth Science Data Bruce R. Barkstrom and Paula L. Sidell.
PDS4 Data From The Rover RSP Archive Concept Review 28 September 2017
SOAR Observatory Strategic Planning Initial Concept Presentation
The Systems Engineering Context
CSSSPEC6 SOFTWARE DEVELOPMENT WITH QUALITY ASSURANCE
Investing in Data Management Capabilities
Visions and Voyages: The Planetary Decadal Survey
Presentation transcript:

A Different Focus on NASA Science Mission Success (a first cut) Mark V. Sykes Planetary Science Institute

Knowledge is the return the taxpayer receives from their investment in NASA science missions

How is knowledge obtained? (going backwards) Analysis of data and publication/distribution of results Archiving of data and its general accessibility Mission operational success/successful transmission of data to Earth Successful launch Spacecraft/instrument construction and integration Mission design and successful proposal Creation of the science context within which mission ideas arise, their value assessed, and (ultimately) the data interpreted.

How is knowledge obtained? (going backwards) Data Analysis Programs PDS Engineering/Science operations planning Research and Data Analysis Programs. You can build a nice car, but it won’t go far without gas.

Mission Program Weaknesses Inadequate/declining funding for Data Analysis Programs Inadequate funding for PDS Low priority for data product definition/archive planning/Science Team science Inadequate/declining funding for Research and Data Analysis Programs. Just build it and launch it, then Data happens Science happens

Discovery 2006 AO Data products do not have to be defined except generally (e.g., surface maps in different filters, mineralogical maps) and with quality quantified (e.g., resolution, coverage, pointing accuracy). No pipeline requirements except to deliver to PDS within 6 months of collection (unless you have a really really good reason). No format discussion needed. I’m going to put an engine in this spacecraft and it’s going to work real good - trust me.

Data Happens Formats may not be defined until after launch and can be designed to accommodate in-house software without regard to non-mission scientists (or even all the scientists on a mission!) Resources for product generation (and science) may be diminished because of reallocations to cover engineering problems Data product pipelines may not be put in place until after launch and documentation (e.g., SIS’s) only required in draft form beforehand. Configuration control and review of pipelines not required. PDS has little leverage beyond delaying a DAP

Science Happens Press conferences Team papers (though they should not have to rely on DAPs) Community access through PDS (in whatever format - don’t forget that IDL license), assuming you can find it. If you archive it, they will come

A Metric for Knowledge Return Relative to what we knew before? If zero, then a little new knowledge is a big thing. (but then did we need the big expensive spacecraft to return that one piece of new information?) Relative to what was anticipated on the basis of data planned to be returned? (like the basis for which the mission was funded?)

How do we improve things? (and make PDS a good guy at the same time?) Require data product formats to be defined in the proposal. Require sample data products with the proposal. Require complete Science Data Management Plan and SIS’s/CMPs by end of Phase A. Require PDS-reviewed pipelines through RDR products. Pipelines must be reviewed and under configuration control with regression testing in place by end of Phase B (Phase A?).

Benefits Require data product formats to be defined in the proposal. Require sample data products with the proposal. Proposers will want to show that they will be generating products in formats that have the broadest use in the communities that will be analyzing the data. Allows for format evolution with community practice.

Benefits Require complete Science Data Management Plan and SIS’s by end of Phase A. Require PDS-reviewed pipelines through RDR products. Pipelines must be reviewed and under configuration control with regression testing in place by end of Phase B (Phase A?). Products will go directly to ingestion in PDS, saving time and mission resources overall Capability for generating quality products is in place and assured as is procedures for making pipeline modifications if needed. No late mission anguish… PDS is a resource instead of a barrier.