Doc.: IEEE 802.11-06/340r1 Submission March 2006 Donald Eastlake 3rd, MotorolaSlide 1 TGs Process, March Notice: This document has been prepared to assist.

Slides:



Advertisements
Similar presentations
Doc.: IEEE /130r0 Submission January 2006 Donald Eastlake 3rd, MotorolaSlide 1 TGs Process Notice: This document has been prepared to assist IEEE.
Advertisements

Doc.: IEEE /0235r0 Submission February 2007 Donald Eastlake 3rd, MotorolaSlide 1 TGs Process, February Notice: This document has been prepared.
Doc.: IEEE /840r2 Submission June 2006 Donald Eastlake 3rd, MotorolaSlide 1 TGs Process, June Notice: This document has been prepared to assist.
Doc.: IEEE /207r0 Submission March 2005 Donald Eastlake 3rd, MotorolaSlide 1 TGs Process Notice: This document has been prepared to assist IEEE.
Doc.: IEEE /1386r0 Submission September 2006 Donald Eastlake 3rd, MotorolaSlide 1 TGs Process, September Notice: This document has been prepared.
Doc.: IEEE /840r1 Submission June 2006 Donald Eastlake 3rd, MotorolaSlide 1 TGs Process, June Notice: This document has been prepared to assist.
Doc.: IEEE /0380r1 Submission March 2007 Donald Eastlake 3rd, MotorolaSlide 1 TGs Process, March Notice: This document has been prepared to assist.
Doc.: IEEE /366r0 Submission May 2005 Donald Eastlake 3rd, MotorolaSlide 1 TGs Process Notice: This document has been prepared to assist IEEE.
Doc.: IEEE P /823r0 Submission May 2007 Donald Eastlake 3rd, MotorolaSlide 1 TGs Montreal Closing Report Notice: This document has been prepared.
TGs Process, November Date: Authors: November 2007
TGs Process, March Date: Authors: May 2006 May 2006
TGs Process, July Date: Author: July 2009 July 2009
TGy January Chair’s Report
March 2013 Opening Report Date: Authors: March 2013
TGs Process Date: Authors: January 2005 January 2005
TGs Closing Report Date: Authors: January 2006 January 2006
TGs Process Date: Authors: November 2005 November 2005
TGs Process Date: Authors: July 2005 July 2005
TGs Montreal Closing Report
TGs London Closing Report
TGs London Closing Report
TGs Process Date: Authors: September 2005 September 2005
TGs January Final Report
[place presentation subject title text here]
[place presentation subject title text here]
TGp Closing Report Date: Authors: March 2006 Month Year
[place presentation subject title text here]
TGs Melbourne Closing Report
TGp Closing Report Date: Authors: March 2006 Month Year
TGs Process, July Date: Author: July 2009 July 2009
July 2012 Opening Report Date: Authors: July 2012
TGs Process Date: Authors: March 2005 March 2005
TGs San Diego Closing Report
TGs Process, March Date: Authors: May 2006 May 2006
IEEE WG Opening Report – July 2008
TGs July Closing Report
TGs Process Date: Authors: July 2005 July 2005
TGs Process Date: Authors: March 2005 March 2005
TGn Closing Report – November 05
TGs Process, March Date: Authors: March 2006 January 2006
TGs Process, March Date: Authors: May 2006 May 2006
TGs Process, November Date: Authors: November 2007
March 2012 Opening Report Date: Authors: March 2012
TGs Process, July Date: Authors: July 2006 July 2006
TGs January Final Report
TGs Dallas Closing Report
TGs Process, November Date: Authors: November 2007
TGs Process, March Date: Authors: March 2007 March 2007
November Opening Report
TGs Process, February Date: Authors: February 2007
TGs Process, March Date: Authors: May 2006 May 2006
TGs Process, September Date: Author: September 2009
TGs Denver Closing Report
TGs Process, September Date: Authors: September 2007
TGs Denver Closing Report
November 2012 Opening Report
TGs Process, January Date: Authors: January 2007
September 2012 Opening Report
TGs Process, November Date: Authors: November 2006
TGs Process, November Date: Authors: November 2006
January Opening Report
TGs Process, January Date: Authors: January 2007
TGs Process, May Date: Authors: May 2007 March 2007
TGs September Closing Report
TGs November Closing Report
TGs Process Date: Authors: March 2005 March 2005
TGs Process, May Date: Authors: May 2007 May 2007
TGs Process Date: Authors: May 2005 May 2005
TGs March Mid-Week Report
TGs Process, March Date: Authors: March 2008 March 2008
Presentation transcript:

doc.: IEEE /340r1 Submission March 2006 Donald Eastlake 3rd, MotorolaSlide 1 TGs Process, March Notice: This document has been prepared to assist IEEE It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures, including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the Working Group of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE Working Group. If you have questions, contact the IEEE Patent Committee Administrator at. Date: Authors:

doc.: IEEE /340r1 Submission March 2006 Donald Eastlake 3rd, MotorolaSlide 2 Abstract Slides for discussion of the IEEE TGs process in getting to Letter Ballot and Beyond.

doc.: IEEE /340r1 Submission March 2006 Donald Eastlake 3rd, MotorolaSlide 3 Mesh Networking Task Group Process TGs Motto: “Perfection is achieved not when there is nothing left to add but when there is nothing left to take away.” Donald E. Eastlake 3 rd

doc.: IEEE /340r1 Submission March 2006 Donald Eastlake 3rd, MotorolaSlide 4 Process of Getting to Letter Ballot and Beyond Completed Stages –Adoption of PAR and 5 Criteria –Technical Presentations and Discussions –Specify Any Additional Requirements, Comparison Criteria, or Other Documents –Call For Proposals Presentation of Proposals Select from Submitted Complete Proposals to Produce a Draft Refine Draft Letter Ballot – July 2006(?) Recirculation Sponsor Ballot – July 2007(?) Recirculation Final WG/EC Approval

doc.: IEEE /340r1 Submission March 2006 Donald Eastlake 3rd, MotorolaSlide 5 Down Selection Process March 2005 Atlanta, GA 35Intents to Propose 9 presentations May 2005 Cannes 35Intents to Propose 10 presentations July 2005 San Francisco 15Proposal Presentations & DownSelect 3 eliminated 6 merge < 25% yes ratio 7 full (~60 min) 8 partial (~30m) Sept Garden Grove 6Proposal Presentations & DownSelect 2 eliminated 1 merge Drop bottom third 4 full (~80 min) 2 partial (~40 m) Nov Vancouver, BC 3Proposal Presentations & DownSelect 1 eliminatedDrop bottom 40% Only full (~120 min) Jan Waikaloa, Hawaii 2Selection Suspended until March 1 merger March 2006 Denver, CO 1Confirmation! Produce Draft!

doc.: IEEE /340r1 Submission March 2006 Donald Eastlake 3rd, MotorolaSlide 6 March 2006 TGs Ballot Note: Only one vote per proposal per voter is allowed for a valid ballot. It is acceptable to vote “No Opinion” on any number of proposals on a ballot. A blank column is the same as a “No Opinion.” Voting Member's Name: ___________________ Motto: Perfection is achieved not when there is nothing left to add but when there is nothing left to take away. Vote Type Proposal B/G:31/7 Joint SEE Mesh and Wi-Mesh Alliance Confirm Not Confirm No Opinion

doc.: IEEE /340r1 Submission March 2006 Donald Eastlake 3rd, MotorolaSlide 7 Schedule Projected at Waikoloa, Hawai‘i (January) Meeting March 2006 (Denver, Colorado) –Confirmation of Proposal, Derivation of Draft May 2006 (Jacksonville, Florida) –Further Refinement of Draft, TG Pseudo-Letter Ballot (WG Poll) July 2006 (San Diego, California) –Further Refinement of Draft, Letter Ballot Authorized by WG September 2006 (Melbourne, Australia) –Comment resolution November 2006 (Dallas, Texas) –First Letter Ballot Re-circulation authorized January 2007 (London, England) –Second Letter Ballot Re-circulation March 2007 (Orlando, Florida) –Third Letter Ballot Re-circulation May 2007 (TBD) –?

doc.: IEEE /340r1 Submission March 2006 Donald Eastlake 3rd, MotorolaSlide 8 Multi-Meeting Process Flow Suggestion March Meeting Denver, CO Adopt Draft Call for Comments Security Session May Meeting Jacksonville, Florida July Meeting San Diego, California Security Telecon (s) Resolve Comments May Agenda Telecon Security Session(s) WG Letter Ballot Complete Comment Resolution telecons and June ad hoc Meeting Security Session(s)

doc.: IEEE /340r1 Submission March 2006 Donald Eastlake 3rd, MotorolaSlide 9 Estimated May - Jacksonville Meeting Schedule I will try to get 14 hours (7 sessions) during the week. Meeting Items and Tentative Time Budget: –1 Opening Session: Administrivia, Minutes, Agenda, Process –4 Security Sessions –7 Comment Resolution –1 Other Technical Presentations –1 Closing Session: Process, Teleconferences/Ad Hocs

doc.: IEEE /340r1 Submission March 2006 Donald Eastlake 3rd, MotorolaSlide 10 TGs Activity Between Meetings TGs Activities Between Meetings Requiring Notice: –One or more face to face meetings, requires 30 days notice (P&P clause 3.6.2). –One or multiple Teleconferences (require 10 days notice, cannot be held more often than weekly (P&P clause 3.6.3)). Suggestions between March and May 2006: –Call for Internal Review Comments on TGs Draft D0.01. –Two or three teleconferences to discuss security and fine tune plans for the May meeting. For example Wednesday, at 11am eastern US time on 5 and 26 April and 10 May. Suggestions between May and July 2006: –Multiple teleconferences, can be decided in May. –A 2 or 3 day ad hoc meeting in June, for example during the week of June 12 th which would require approval at this meeting.

doc.: IEEE /340r1 Submission March 2006 Donald Eastlake 3rd, MotorolaSlide 11 Schedule Projected at Denver, Colorado (March) Meeting May 2006 (Jacksonville, Florida) –Further Refinement of Draft July 2006 (San Diego, California) –Further Refinement of Draft, Letter Ballot Authorized by WG September 2006 (Melbourne, Australia) –Comment resolution November 2006 (Dallas, Texas) –First Letter Ballot Re-circulation authorized January 2007 (London, England) –Second Letter Ballot Re-circulation March 2007 (Orlando, Florida) –Third Letter Ballot Re-circulation May 2007 (Montreal, Quebec) –Fourth Letter Ballot Re-circulation July 2007 (San Francisco, California) –Sponsor Ballot Authorization by WG

doc.: IEEE /340r1 Submission March 2006 Donald Eastlake 3rd, MotorolaSlide 12 References Earlier TGs Process Submissions –January 2006, 11-06/130r1, Waikoloa, Hawai‘i –November 2005, 11-05/1137r1, Vancouver, British Columbia –September 2005, 11-05/878r1, Garden Grove, California –July 2005, 11-05/662r1, San Francisco, California –May 2005, 11-05/366r1, Cairns, Queensland –March 2005, 11-05/207r3, Atlanta, Georgia –January 2005, 11-05/26r1, Monterey, California 11-04/1430r12, Call For Proposals 11-05/112r14, Proposal Intents for TGs 11-05/274r10, Proposal Selection 11-05/597r21, TGs Proposals