Board of Supervisors Transportation Committee June 25, 2013 (6/18 presentation draft) Proposed High Quality Transit Network Concept 1.

Slides:



Advertisements
Similar presentations
VISION PLAN SUMMARY Fairfax County Transportation Advisory Commission Amy Inman Manager of Transit Planning Department of Rail and Public Transportation.
Advertisements

Tysons Tysons Corner Circulator Study Board Transportation Committee June 12, 2012.
1 TransAction 2040 NVTA Presentation 1 May 10, 2012.
County of Fairfax, Virginia Department of Transportation Fairfax Connector Bus Service Plans HOT Lanes and Dulles Rail Phase I Fairfax County Board of.
I-95 Transit & TDM Plan I-95 Transit and TDM Plan Summary of Recommendations Slide 1.
1 The Role of Bus Transit in the Regional Transportation, Present and Future Howard Benn, Chair, TPB Regional Bus Subcommittee TPB Regional Priority Bus.
Pinellas by Design: A Blueprint for Updating the Countywide Plan Pinellas Planning Council May 18, 2011.
I-66 Corridor Improvements Outside the Beltway CTB Briefing
TBITE 05/15/ Heather Sobush, Senior Planner Christopher Cochran, Senior Planner
OHIO & LAKE ERIE REGIONAL RAIL CLEVELAND HUB STUDY Ohio Rail Development Commission TMACOG Annual Transportation Summit September 29, 2003.
SR 50/UCF Connector Alternatives Analysis Orange County Board of County Commissioners January 13, 2015.
Public Information Sessions November 30, 2010: City Center at Oyster Point December 1, 2010: HRT Norfolk.
Agenda Final Modal Assignments Prioritization Supporting Network Financial Analysis.
NEW YORK CITY TRAFFIC CONGESTION MITIGATION COMMISSION NYSDOT Comments on New York City Traffic Congestion Mitigation Plan Bob Zerrillo, Director, Office.
VRE Gainesville-Haymarket Extension Feasibility Study and Alternatives Analysis Public Workshop Wednesday, October 22 nd, :30 – 9:00 pm Battlefield.
VIRGINIA RAILWAY EXPRESS SYSTEM PLAN 2040
1 Status Report on the Bus Systems in the National Capital Region Report of the Regional Bus Subcommittee to the Access for All Advisory Committee April.
Program Update Baltimore MPO November 25, Internal Draft AGENDA  Program Overview  Alternatives Development  Stakeholder and Public Outreach.
Rapid Transit System Steering Committee Meeting December 4, 2012.
Rapid Transit Investment Plan David Armijo, CEO March 19, 2010.
Project Briefing Metropolitan Washington Council of Governments Transportation Policy Board Project Briefing Metropolitan Washington Council of Governments.
Orange County Business Council Infrastructure Committee December 14, 2010 Draft Long-Range Transportation Plan Destination 2035.
1 Item 11: Review of Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Performance Analysis Presentation to the National Capital Region Transportation Planning Board (NCR-TPB) November 28, 2012 Adopted: July 18, 2012 Item.
1 Presented by Tom Harrington WMATA Office of Long-Range Planning TPB Technical Committee June 6, 2008 Future Metrorail Capacity Needs.
Countywide Master Plan of Transportation. Project Overview Master Plan of Transportation Purpose 2002 General Plan Guidance The Development Pattern Report.
Montgomery County Rapid Transit System (RTS) Service Planning and System Integration Study Service Planning and Integration Study Work Group Report 7/30/13.
1 Michael Eichler Department of Transportation Planning Presentation to the TPB Technical Committee January 8, 2009 CLRP Aspirations Scenario Preliminary.
TRB/APTA 2004 Bus Rapid Transit Conference When is BRT the Best Option? the Best Option? 1:30 – 2:40 p.m. Paul Larrousse Director, National Transit Institute.
: Research Question: Would ridership needs in the area of the Mid-Coast Corridor Transit Project be better Served by the implementation of a Bus Rapid.
I-95 Transit & TDM Plan I-95 Transit and TDM Plan I-95 Corridor Stakeholder and Service Provider Meeting #2 June 13, 2011.
1 What If… The Washington Region Grew Differently? The TPB Regional Mobility and Accessibility Study TPB Citizens Advisory Committee Public Forum in Oxon.
OPEN HOUSE #4 JUNE AGENDA OPEN HOUSE 6:00 PM  Review materials  Ask questions  Provide feedback  Sign up for list  Fill out comment.
West Phoenix / Central Glendale Transit Corridor Study Public Meetings May 2013.
1 Monica Bansal and Michael Eichler Department of Transportation Planning Presentation to the TPB Scenario Study Task Force September 17, 2008 Progress.
1 Monica Bansal and Michael Eichler Department of Transportation Planning Presentation to the TPB Technical Committee December 5, 2008 Progress on “CLRP.
DRAFT What If… The Washington Region Grew Differently? Public Forum on Alternative Transportation and Land-Use Scenarios National Capital Region.
Regional Priority Bus Transit Conference June 24, 2009.
1 Item 12: Report on Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Purpose To develop and evaluate a range of transit and transportation alternatives throughout the MPO area, considering: u Regional Goals and Objectives.
The Purple Line Transit Connecting Bethesda, New Carrolton, and the Washington Metro Presented by- Nick Flanders Rose Ryan Anupam Srivastava.
Comprehensive Policy Plan Amendments Wekiva Parkway and Protection Act December 18, 2007 Comprehensive Policy Plan Amendments Wekiva Parkway and Protection.
Regional Transit Study Project Update. Four open houses held between November , 2009 Informed and engaged the public in the study process Provided.
1 Presented to the Transportation Planning Board October 15, 2008 Item 9 Metrobus Priority Corridor Network.
1 What If… The Washington Region Grew Differently? Results to Date of The TPB Regional Mobility and Accessibility Study February 8, 2006.
1 Presentation to TAC May 20, 2009 Priority Corridor Network (PCN) Evaluation Project Introduction.
2030 Transit-Oriented Development Scenario: Travel Model Results
TPB CLRP Aspirations Scenario 2012 CLRP and Version 2.3 Travel Forecasting Model Update Initial Results Ron Kirby Department of Transportation Planning.
County of Fairfax, Virginia Department of Transportation VDRPT Route 1 Multimodal Alternatives Analysis: Recommendations for Next Steps Board Transportation.
Supporting a Regional Approach Optimizing the Durham-Chapel Hill high-capacity light rail transit corridor Joe Milazzo II, PE Executive Director, RTA September.
County of Fairfax, Virginia Fairfax County Comprehensive Transit Plan and Transit Development Plan Board Transportation Committee December 1, 2015 Randy.
Overview Presentation Fall 2015 Gainesville-Haymarket Extension Study.
Express/Rapid Bus Opportunities for Priority Bus Transit in the Washington Region Sponsored by National Capital Region Transportation Planning Board Chun.
1 Status Report on the Bus Systems in the National Capital Region Report of the Regional Bus Subcommittee to the National Capital Region Transportation.
The Regional Mobility and Accessibility Study Initial Results of CLRP/CLRP+ Analysis with Round 6.4 Growth Forecasts and Five Alternative Land Use Scenarios.
Fairfax County Comprehensive Transit Plan and Transit Development Plan Update Fairfax County Comprehensive Transit Plan and Transit Development Plan Update.
Metropolitan Council 1 Twin Cities Region Transportation Policy Plan Nacho Diaz Metropolitan Council Evaluating Economic and Community Impacts of Transit.
I-66 Corridor Improvements Morteza Farajian Interstate 66 Corridor Improvements From US Route 15 in Prince William County To Interstate 495 in Fairfax.
Shaping our Future Transportation Transportation trends Influencing trends through land use decisions Alternative futures: Base Case and Scenario Complementary.
1 What If… The Washington Region Grew Differently? The TPB Regional Mobility and Accessibility Study Ronald F. Kirby Director, COG Department of Transportation.
1 Countywide Transit Network Study objectives: Establish a connected rapid transit system to meet demands through the year 2050 Define transit corridor.
Regional Transportation Plan Draft Hybrid Scenario Transportation Policy Committee 7/22/03.
A Presentation to: River to Sea TPO Board October 26, 2016.
Comprehensive Route Network Analysis
A Presentation to: River to Sea TPO BPAC November 9, 2016.
Regional Roads Committee
River to Sea TPO - CAC/TCC
Major Projects in Development
Focus40 Overview A long-range plan for how the MBTA can meet the needs of the region in 2040: A 20-year plan as required by MBTA enabling legislation A.
Status Report on Rochester’s DMC Transportation Plan
Presentation transcript:

Board of Supervisors Transportation Committee June 25, 2013 (6/18 presentation draft) Proposed High Quality Transit Network Concept 1

1.Where are we in the study process? 2.Proposed HQTN Concept network/elements 3.Measures of effectiveness 4.Next steps Presentation Agenda 2

Where are we in the study process? We are at the third of our four stages of public involvement and review: Goals/objectives (July 2012) Functions (November 2012) Proposed HQTN Concept (July 2013) Final concept (November 2013) Our next steps are to: Review Proposed HQTN Concept Consider refinements Develop additional details on mode, right-of-way, and station locations Finalize recommendations 3

The study goals and objectives reflect the triple-bottom line of economic, environmental, and social benefits. 4 Study goals and objectives

5 Establish most effective way to serve the County’s needs to accommodate planned growth over the long term by improving public transit usage. Study purpose 5

6 6 Fairfax County Future Development Concept

Fairfax County’s land use policies encourage development within designated activity centers, which currently include about: 10% of County acreage 19% of County households 82% of County jobs Activity Density = (population+jobs)/acre Blue: (AD>4): supports local bus service Red: (AD>20) supports bus rapid transit (BRT) Purple: (AD>50) supports rail transit Current land use

Fairfax County’s land use policies encourage development within designated activity centers, which by 2050 include about: 10% of County acreage 36% of County households 89% of County jobs 8 Activity Density = (population+jobs)/acre Blue: (AD>4): supports local bus service Red: (AD>20) supports bus rapid transit (BRT) Purple: (AD>50) supports rail transit 2050 Initial 8 Future land use

Public outreach in July and November 2012 is reflected in our proposed High Quality Transit Network concept. In July, we reviewed goals, objectives, and potential connections. In November, we presented concepts for establishing premium commuter, connector, or destination transit corridors. 9 9 Prior public meetings

Proposed HQTN Concept The Proposed HQTN Concept builds upon the existing and Constrained Long Range Plan (CLRP) transit investments to create an interconnected network of commuter corridors, destination corridors, and connecting express bus routes. 10

Existing High Quality Transit Network elements serving Fairfax County include Metrorail, VRE, and express bus services on HOV/HOT lanes 11 HQTN Concept Elements

Constrained Long Range Plan transit connections provide starting point for Proposed HQTN Concept: Silver Line Columbia Pike Beauregard/Van Dorn Transitway 12 HQTN Concept Elements

Commuter Corridors provide capacity to connect Fairfax County with other jurisdictions for longer-distance trips as region expands over time: Metrorail Orange Line Extension Metrorail Blue Line Extension 13 HQTN Concept Elements

Destination Corridors provide service to support access to and within transit- oriented development along linear corridors: Route 7 LRT Richmond Highway LRT Route 28 LRT/BRT Merrifield/McLean LRT/BRT 14 HQTN Concept Elements

North-South Express Bus Services connect activity centers and HQTN services in radial corridors and provide flexibility for through- routing: Beltway Express Fairfax County Parkway Route 28 May share managed lanes with HOV 15 HQTN Concept Elements

East-West Express Bus Services augment grid of direct and flexible transit connections: Route 50 – Orange Line bus bridge function Route 236 – continuation of Alexandria transitway Express bus route mileage at least 50% managed lanes 16 HQTN Concept Elements

The Proposed HQTN Concept includes 214 miles of new transitway and 74 new stations. The mileage includes: -31 miles Metrorail -73 miles LRT/BRT -110 miles express bus 17 HQTN Concept Elements

The Proposed HQTN Concept has an estimated capital cost of about $7.5 billion in current dollars The cost includes: -$4.0B Metrorail -$3.2B LRT/BRT -$0.3B express bus 18 HQTN Concept Elements

Measures of effectiveness 19 The Proposed HQTN Concept achieves a range of triple- bottom line goals and objectives.

20 Measures of effectiveness 2050 weekday peak period ridership compares favorably to other regional transit routes

The Proposed HQTN Concept provides new transit access to 28 activity centers with higher than average levels of transit ridership propensity based on transit dependency. 21 Measures of effectiveness

The Proposed HQTN Concept provides new destination corridor transit routes to serve places with developable properties and designated revitalization areas 22 Measures of effectiveness

The Proposed HQTN Concept provides new transit access to activity centers with key retail/service destinations 23 Measures of effectiveness

New Starts projects show a relationship between total capital cost and cost per passenger. 24 Measures of effectiveness

Proposed HQTN corridors are consistent with current planning-level cost-effectiveness experience. M1: Orange Line Ext M2: Blue Line Ext L1: Route 28 LRT L7: Wilson Bridge BRT L3: Route 7 LRT L5: Richmond Hwy LRT L2: Route 123 Gallows LRT L6: American Legion Bridge BRT E3: Route 28 Express E4: Route 286 / 289 Express E5: Route 50 East Express E6: I-495 Express 25 E2: Route 50 / 236 Express Measures of effectiveness

Supporting feeder bus, park and ride (beyond existing or TDP/CLRP spaces), and circulator systems will provide broader access to commuter services and increased coverage within larger activity centers. 26 CLRP/TDP Park and Ride lot (>50 spaces) HQTN Park and Ride lot / expansion Circulator (Fort Belvoir: DOD only) Supporting policies

July 10 public meeting Response to comments and further stakeholder coordination Intermodal transfer station details Mode, ROW and typical section requirements Phasing and timing 27 Next steps